LG Energy Test. RM3
LG Energy Test. RM3
LG Energy Test. RM3
B. Function Test
NO FUNCTIONS
1 Physical /Visual Inspection.
2 Electrical check.
3 Metering Minimum Current
4 Current Measurement
5 Voltage Measurement
6 POWER(MW-MVAR) Measurement
7 Accuracy Test
8 Maximum Demand
2. Electrical Checks:
Date :
TESTING ENGINEER SEC- CSD - Engineer
3. Metering
- CREEP TEST
APPLIED
APPLIED VOLTAGE REMARKS
CURRENT
69.28 0.0 A No Increment In Energy Values
69.28 0.1A Minimum current value.
4- CURRENT MEASUREMENTS:
0.50 1 1 1 1 1 1
1.00 2 2 2 2 2 2
5- Voltage Measurements:
Date :
TESTING ENGINEER SEC- CSD - Engineer
3 ph
3 Ph Phase Power factor MW meas. MVAR meas.
current
Voltage Angle
injected
applied (V) set @ Exp Actual Exp Actual Exp Actual
(A)
7. Accuracy Test
Date :
TESTING ENGINEER SEC- CSD - Engineer
Date :
TESTING ENGINEER SEC- CSD - Engineer
Phase
3 Ph Voltage 3 ph current MW meas. MVAR meas.
Angle
applied (V) injected (A)
set @ Exp Actual Exp Actual
Date :
TESTING ENGINEER SEC- CSD - Engineer