StorageTek SL150 Modular Tape Libraries Installation (IDO) Specialist Assessment
StorageTek SL150 Modular Tape Libraries Installation (IDO) Specialist Assessment
StorageTek SL150 Modular Tape Libraries Installation (IDO) Specialist Assessment
Revise las respuestas, los resultados y las puntuaciones de las preguntas que se muestran a continuación.
Las respuestas correctas están marcadas con un asterisco (*).
This 45 - question assessment test is the final component of the StorageTek SL150 Modular Tape
Library Installation (IDO) Specialist guided learning path. This assessment will allow you to test your
knowledge level of the information learned from the Installation (IDO) courses. Passing with a >80%
score from this assessment makes you eligible to become an Oracle Installation (IDO) Specialist for this
subject matter.
ESD
(Responder todas las preguntas de esta sección)
Correct
Correct
Verdadero
Falso (*)
Correct
Correct
5. Why are ESD "soft failures" the most serious type of failures?
Marcar para Revisión
(1) Puntos
Correct
6. EIS
consists of Marcar para Revisión
how many (1) Puntos
standards?
5
6 (*)
4
3
Correct
Verdadero (*)
Falso
Correct
Correct
Verdadero (*)
Falso
Correct
Verdadero
Falso (*)
Correct
CapacityTOOL
INSTALLplan
EISplan
WINGS (*)
Correct
12. EIS-DVD: (Select all that apply)
Marcar para Revisión
(1) Puntos
Correct
13. How do you identify a system that has been installed using
EIS? (Select all that apply) Marcar para Revisión
(1) Puntos
Correct
Correct
Correct
Once a year
Once a quarter
Once a month (*)
Twice a month
Correct
Verdadero (*)
Falso
Correct
Correct
Verdadero
Falso (*)
Correct
Correct
Ensure that explorer (with the instinfo option) has been run
and the explorer data file has been uploaded to the correct
configDB.
Make sure the project can range from a single server
installation to a complex international configuration involving
multiple sites, servers, storage, and services.
Create customer documentation and hand over for signoff.
Define details such as host names, IP addresses, and boot
disk layout for the new systems. Furthermore, the testes
that will be performed during customer handover are
defined. (*)
Correct
23. During the Project Initiation step:
Marcar para Revisión
(1) Puntos
Correct
Verdadero (*)
Falso
Correct
SCSI commands
Tape alerts
Library commands (*)
SNMP traps
Correct
27. After a tape drive has powered up and IPL'ed what occurs next?
Marcar para Revisión
(1) Puntos
Correct
Correct
Dump cartridges
Code tape cartridges
Data tapes (*)
Cleaning cartridges
Correct
31. True or
False - Marcar para Revisión
Refer to the (10) Puntos
StorageTek
SL150
Modular
Tape
Library
System
Customer
Replaceable
Unit Guide
for detailed
instructions
on
replacing
SL150
FRUs.
Verdadero
Falso (*)
Correct!
three
two
nine (*)
four
Correct!
SL24/48 (*)
SL3000
SL500 (*)
SL700
Correct!
Correct!
Verdadero
Falso (*)
Correct!
Correct!
Correct!
38. The base model of the SL-150 features how many USB ports?
Marcar para Revisión
(10) Puntos
9 (*)
8
6
7
Correct!
Correct!
40. Basic library initialization performed from the touch screen of the
SL150 front control panel involves the following tasks: Marcar para Revisión
(10) Puntos
Correct!
Correct!
Verdadero (*)
Falso
Correct!
Magazines
LTO Drives (*)
Operator Panel
Power Supplies (*)
Correct!
Verdadero (*)
Falso
Correct!
changeme
password
passw0rd (*)
null
Correct!