Chapter 6: Project Time Management: True/False
Chapter 6: Project Time Management: True/False
Chapter 6: Project Time Management: True/False
TRUE/FALSE
2. Managers often cite cost issues during the end phase of a project as one of their
biggest challenges and the main cause of conflict.
4. Individual work styles and cultural differences may cause schedule conflicts.
7. The main outputs of estimating activity resources include the activity list and
attributes, project scope statement, milestone list, and organizational process assets.
9. Project schedules grow out of the basic documents that initiate a project.
11. Activity information is not a required input to the other time management
processes.
13. Even though the delivery of new hardware may not be in the scope of a project,
you should add an external dependency to it if required project activities depend on that delivery.
14. Network diagrams are the preferred technique for showing activity discretionary
dependencies.
16. It is not necessary to complete all of the activities on the network diagram in
order for the project to finish.
19. It is important that the people who help determine what resources are necessary
include people who have experience and expertise in similar projects and with the organization
performing the project.
20. Duration only includes the actual amount of time worked on an activity.
21. In a Gantt chart created in Microsoft Project, a black diamond symbol represents
a milestone.
22. A Tracking Gantt chart is based on the percentage of work completed for project
tasks or the actual start and finish dates.
24. The critical path always includes the most critical activities.
25. A fast and easy way to determine early and late start and finish dates and free and
total slack amounts for activities is by using project management software.
27. By using the PERT weighted average for each activity duration estimate, the total
project duration estimate does not account for the risk or uncertainty in the individual activity
estimates.
28. One of PERT’s main disadvantages is that it involves more work than CPM.
30. Project management software does not have the capacity to automatically
generate network diagrams and calculate the critical path(s) for the project.
MULTIPLE CHOICE
2. ____ involves identifying the specific activities that the project team members
and stakeholders must perform to produce the project deliverables.
a. Defining activities c. Estimating activity
resources
b. Sequencing activities d. Estimating activity
durations
ANS: A PTS: 1 REF: 213
3. The main outputs of the ____ process are an activity list, activity attributes, and
milestone list.
a. defining activities c. resource estimating
activities
b. sequencing activities d. duration estimating
activities
ANS: A PTS: 1 REF: 213
5. ____ involves estimating the number of work periods that are needed to complete
individual activities.
a. Defining activities c. Estimating activity
resources
b. Sequencing activities d. Estimating activity
durations
ANS: D PTS: 1 REF: 213
10. The goal of ____ is to ensure that the project team has complete understanding of
all the work they must do as part of the project scope so they can start scheduling the work.
a. defining activities c. estimating activity
resources
b. sequencing activities d. estimating activity
durations
ANS: A PTS: 1 REF: 215
12. ____ involves evaluating the reasons for dependencies and the different types of
dependencies.
a. Defining activities c. Estimating activity
resources
b. Sequencing activities d. Estimating activity
duration
ANS: B PTS: 1 REF: 217
13. ____ dependencies are inherent in the nature of the work being performed on a
project.
a. Mandatory c. External
b. Discretionary d. Internal
ANS: A PTS: 1 REF: 217
14. ____ dependencies are sometimes referred to as soft logic and should be used
with care since they may limit later scheduling options.
a. Mandatory c. External
b. Discretionary d. Internal
ANS: B PTS: 1 REF: 217
16. ____ occur when two or more activities follow a single node.
a. Combinations c. Merges
b. Conflicts d. Bursts
ANS: D PTS: 1 REF: 219
17. On a network diagram, all arrowheads should face toward the ____.
a. top c. right
b. left d. bottom
ANS: C PTS: 1 REF: 219
19. In a ____ relationship, the “from” activity must finish before the “to” activity can
start.
a. start-to-start c. finish-to-finish
b. finish-to-start d. start-to-finish
ANS: B PTS: 1 REF: 220
20. In a ____ relationship, the “from” activity cannot start until the “to” activity is
started.
a. start-to-start c. finish-to-finish
b. finish-to-start d. start-to-finish
ANS: A PTS: 1 REF: 220
21. In a ____ relationship, one task cannot finish before another finishes.
a. start-to-start c. finish-to-finish
b. finish-to-start d. start-to-finish
ANS: C PTS: 1 REF: 220
23. The activity list, activity attributes, activity resource requirements, resource
calendars, project scope statement, enterprise environmental factors, and organizational process
assets all include information that affect ____.
a. definitions c. resource estimates
b. sequences d. duration estimates
ANS: D PTS: 1 REF: 223
24. The ultimate goal of ____ is to create a realistic project schedule that provides a
basis for monitoring project progress for the time dimension of the project.
a. defining activities c. developing the
schedule
b. sequencing activities d. estimating activity
duration
ANS: C PTS: 1 REF: 223
25. ____ provide(s) a standard format for displaying project schedule information by
listing project activities and their corresponding start and finish dates in a calendar format.
a. Gantt charts c. Critical chain
scheduling
b. Critical path analysis d. PERT analysis
ANS: A PTS: 1 REF: 224
26. ____ is a network diagramming technique used to predict total project duration.
a. A Gantt chart c. Critical chain
scheduling
b. Critical path analysis d. PERT analysis
ANS: B PTS: 1 REF: 228
27. The critical path is the ____ path through a network diagram, and it represents
the ____ time it takes to complete a project.
a. longest; longest c. shortest; longest
b. longest; shortest d. shortest; shortest
ANS: B PTS: 1 REF: 228-229
28. ____ is the amount of time an activity can be delayed without delaying the early
start date of any immediately following activities.
a. Total slack c. Free time
b. Total float d. Free slack
ANS: D PTS: 1 REF: 230
29. ____ is the amount of time an activity can be delayed from its early start without
delaying the planned project finish date.
a. Total slack c. Total time
b. Free float d. Free slack
ANS: A PTS: 1 REF: 230
30. The ____ for an activity is the latest possible time an activity might begin
without delaying the project finish date.
a. early entry date c. late start date
b. late entry date d. early start date
ANS: C PTS: 1 REF: 230
31. ____ is a technique for making cost and schedule trade-offs to obtain the greatest
amount of schedule compression for the least incremental cost.
a. Crushing c. Fast tracking
b. Crashing d. Expediting
ANS: B PTS: 1 REF: 233
32. ____ involves doing activities in parallel that you would normally do in
sequence.
a. Crushing c. Fast tracking
b. Crashing d. Expediting
ANS: C PTS: 1 REF: 233
33. ____ is a method of scheduling that considers limited resources when creating a
project schedule and includes buffers to protect the project completion date.
a. A Gantt chart c. Critical chain
scheduling
b. Critical path analysis d. PERT analysis
ANS: C PTS: 1 REF: 233
34. Critical chain scheduling protects tasks on the critical chain from being delayed
by using ____, which consist of additional time added before tasks on the critical chain that are
preceded by non-critical-path tasks.
a. critical paths c. dummy activities
b. feeding buffers d. fast tracking
ANS: B PTS: 1 REF: 235
35. ____ states that work expands to fill the time allowed.
a. Murphy’s Law c. Parkinson’s Law
b. Newton’s Law d. Moore’s Law
ANS: C PTS: 1 REF: 235
37. The goal of ____ is to know the status of the schedule, influence the factors that
cause schedule changes, determine that the schedule has changed, and manage changes when they
occur.
a. activity duration c. schedule control
estimating
b. schedule d. activity resource
development estimating
ANS: C PTS: 1 REF: 237
38. Project managers often illustrate progress with a ____ showing key deliverables
and activities.
a. Tracking Gantt chart c. network diagram
b. Gantt chart d. PERT chart
ANS: A PTS: 1 REF: 239
40. Project management software highlights the critical path in ____ on a network
diagram.
a. blue c. green
b. yellow d. red
ANS: D PTS: 1 REF: 240
COMPLETION
ANS: Time
ANS: milestone
7. In the activity definition process, the project team should review the
____________________ and activity attributes with project stakeholders before moving on to the
next step in project time management.
ANS: node
ANS: start-to-finish
ANS: Effort
PTS: 1 REF: 222
13. Duration estimates are often provided as a discrete number, such as four weeks,
or as a range, such as three to five weeks, or as a(n) ____________________.
ANS: SMART
15. A(n) ____________________ Gantt chart compares planned and actual project
schedule information.
ANS: Tracking
18. A(n) ____________________ determines the early start and early finish dates for
each activity.
ANS:
TOC
Theory of Constraints
Theory of Constraints (TOC)
TOC (Theory of Constraints)
20. ____________________ occurs when a resource works on more than one task at
a time.
ANS: Multitasking
23. One of the first reality checks on scheduling that a project manager should make
is to review the ____________________ usually included in the project charter.
ANS: month
ANS: templates
ESSAY
1. List and briefly describe the main processes involved in project time
management.
ANS:
Defining activities involves identifying the specific activities that the project team members and
stakeholders must perform to produce the project deliverables. An activity or task is an element of
work normally found on the work breakdown structure (WBS) that has an expected duration, a
cost, and resource requirements. The main outputs of this process are an activity list, activity
attributes, and milestone list.
Sequencing activities involves identifying and documenting the relationships between project
activities. The main outputs of this process include project schedule network diagrams and project
document updates.
Estimating activity resources involves estimating how many resources—people, equipment, and
materials—a project team should use to perform project activities. The main outputs of this
process are activity resource requirements, a resource breakdown structure, and project document
updates.
Estimating activity durations involves estimating the number of work periods that are needed to
complete individual activities. Outputs include activity duration estimates and project document
updates.
Developing the schedule involves analyzing activity sequences, activity resource estimates, and
activity duration estimates to create the project schedule. Outputs include a project schedule, a
schedule baseline, schedule data, and project document updates.
Controlling the schedule involves controlling and managing changes to the project schedule.
Outputs include work performance measurements, organizational process assets updates, change
requests, project management plan updates, and project document updates.
2. What are the basic reasons for creating dependencies among project activities?
Describe each.
ANS:
Mandatory dependencies are inherent in the nature of the work being performed on a project.
They are sometimes referred to as hard logic. For example, you cannot test code until after the
code is written.
Discretionary dependencies are defined by the project team. For example, a project team might
follow good practice and not start the detailed design of a new information system until the users
sign off on all of the analysis work. Discretionary dependencies are sometimes referred to as soft
logic and should be used with care since they may limit later scheduling options.
External dependencies involve relationships between project and non-project activities. The
installation of a new operating system and other software may depend on delivery of new
hardware from an external supplier. Even though the delivery of the new hardware may not be in
the scope of the project, you should add an external dependency to it because late delivery will
affect the project schedule.
3. What is a network diagram? What formats exist for creating network diagrams?
ANS:
Network diagrams are the preferred technique for showing activity sequencing. A network
diagram is a schematic display of the logical relationships among, or sequencing of, project
activities. Some people refer to network diagrams as project schedule network diagrams or PERT
charts. The network diagram represents activities that must be done to complete the project. It is
not a race to get from the first node to the last node. Every activity on the network diagram must
be completed in order for the project to finish. Not every single item on the WBS needs to be on
the network diagram.
Even though AOA or ADM network diagrams are generally easy to understand and create, a
different method is more commonly used: the precedence diagramming method. The precedence
diagramming method (PDM) is a network diagramming technique in which boxes represent
activities. It is particularly useful for visualizing certain types of time relationships.
ANS:
Many projects fail to meet schedule expectations. Critical path method (CPM)—also called
critical path analysis—is a network diagramming technique used to predict total project
duration. This important tool will help you combat project schedule overruns. A critical path for
a project is the series of activities that determine the earliest time by which the project can be
completed. It is the longest path through the network diagram and has the least amount of slack or
float. Slack or float is the amount of time an activity may be delayed without delaying a
succeeding activity or the project finish date. There are normally several tasks done in parallel on
projects, and most projects have multiple paths through a network diagram. The longest path or
path containing the critical tasks is what is driving the completion date for the project. You are not
finished with the project until you have finished all the tasks.
To find the critical path for a project, you must first develop a good network diagram, which, in
turn, requires a good activity list based on the WBS. Once you create a network diagram, you
must also estimate the duration of each activity to determine the critical path. Calculating the
critical path involves adding the durations for all activities on each path through the network
diagram. The longest path is the critical path. The critical path shows the shortest time in which a
project can be completed.
ANS:
The Theory of Constraints (TOC) is a management philosophy developed by Eliyahu M.
Goldratt and discussed in his books The Goal and Critical Chain. The Theory of Constraints is
based on the fact that, like a chain with its weakest link, any complex system at any point in time
often has only one aspect or constraint that limits its ability to achieve more of its goal. For the
system to attain any significant improvements, that constraint must be identified, and the whole
system must be managed with it in mind. Critical chain scheduling is a method of scheduling
that considers limited resources when creating a project schedule and includes buffers to protect
the project completion date.
An important concept in critical chain scheduling is the availability of scarce resources. Some
projects cannot be done unless a particular resource is available to work on one or several tasks.
For example, if a television station wants to produce a show centered around a particular
celebrity, it must first check the availability of that celebrity. As another example, if a particular
piece of equipment is needed full time to complete each of two tasks that were originally planned
to occur simultaneously, critical chain scheduling acknowledges that you must either delay one of
those tasks until the equipment is available or find another piece of equipment in order to meet
the schedule. Other important concepts related to critical chain scheduling include multitasking
and time buffers.