Lesson 7 Unit Operations in Mining
Lesson 7 Unit Operations in Mining
Lesson 7 Unit Operations in Mining
Maximum Slope- needed/basis for designing the open -The drilling method involves a
pit. powered rotary cutting head on the end of a shaft, driven
into the ground as it rotates. The system requires
Pit Slope- Measured from the bottom bench toe to the top lubrication (air, water or drilling mud) to keep the cutting
bench crest. It is the angle at which the wall of an open pit head cool.
stands and it is determined by rock strength, geologic
structures and water conditions. 2. Percussion drilling- is a manual drilling technique in
which a heavy cutting or hammering bit attached to a rope
Stripping Ratio- can be calculated by dividing or cable is lowered in the open hole or inside a temporary
overburden thickness by ore thickness. For example, casing.
an overburden thickness of 100 meters and an ore
thickness of 50 meters would yield a strip ratio of 2:1. - is employed when auger or wash
boring is not possible in very stiff soil or rock. It also can
𝑶𝒗𝒆𝒓𝒃𝒖𝒓𝒅𝒆𝒏 𝒕𝒉𝒊𝒄𝒌𝒏𝒆𝒔𝒔
SR= be used in most soil types.
𝑶𝒓𝒆 𝒕𝒉𝒊𝒄𝒌𝒏𝒆𝒔𝒔
or
𝒘𝒂𝒔𝒕𝒆
SR=
𝒓𝒆𝒄𝒐𝒗𝒆𝒓𝒆𝒅
-used to reduce the overburden or ore to a size
range suitable for excavation depending on the
requirement of ROM(Run-of-mine)
• Hydraulic Shovel
• Rope shovel
Front-end Loaders
• Advantages
• high mobility
• flexible
CYCLIC OPERATION for loading and hauling • Cyclic in nature and has better compatibility with
operation backhoes and shovels
travel to • Disadvantages
dumpsite
• High maintenance costs
• Require properly maintained roads
Loading dumpsite
Types:
• On-Highway truck
• Articulated
spotting
travel empty
to loader
• Rigid Dump Trucks
queuering
Articulated Trucks
Haulage- 48%
Overhead-15%
Loading- 12%
Loading/Hauling Combinations
Surface Miner
Scraper
Auxiliary Operation
1. Surveying