Q1 2019 Financial Results Chememan Public Company Limited: As A Human Chemical
Q1 2019 Financial Results Chememan Public Company Limited: As A Human Chemical
Q1 2019 Financial Results Chememan Public Company Limited: As A Human Chemical
Financial
Results
Chememan
Public Company
Limited
Lime
As a Human Chemical
Table of Contents
2. Financial Performance
3. Progress Update
KK4 Quicklime Kiln with production capacity of 73,000 tons per year
commenced operation in January 2019
Entered into 10 years natural gas supply contract with PTT Public Company
Limited
Limestone
Hydrated Lime
Quicklime 324,733 329,368
305,350
268,855 256,461
146,939 167,187
90,909 147,813
105,421
25,684 24,243 13,850
22,588 26,147
Sales Revenues
Unit : THB million
Limestone
Hydrated Lime
Quicklime 647
597 588 592 612
59
39 62 51 69
97 60
98 89 107
Sales Quantities
Unit : MT
67%
60% 67% 64%
67%
64%
Sales Revenues
Unit : THB million
Internartional 647
597 588 592 612
Domestic
55%
52% 64% 62% 63%
Chemicals, 1.9%
Bio-plastic, 3.2%
Mining, 42.3%
Building Construction
and Roadways, 10.7%
Sugar, 20.8%
200 20.0%
200 20.0%
180
18.6% 18.1% 18.7% 18.0%
18.3%
17.5% 16.2%
180 18.0%
16.6%
160 16.0%
160
16.3% 16.0%
14.8%
140
15.0% 14.0%
140 14.0%
120 12.0%
120 12.0%
100 10.0%
100 10.0%
80 8.0%
80 8.0%
113 109 99
60 6.0%
40
99 96 92 4.0%
40
95 4.0%
20 2.0%
20 2.0%
0 0.0% 0 0.0%
Q1 2018 Q2 2018 Q3 2018 Q4 2018 Q1 2019 Q1 2018 Q2 2018 Q3 2018 Q4 2018 Q1 2019
EBITDA EBITDA Margin (%) Normalized EBITDA Normalized EBITDA Margin (%)
10.0%
9.4%
160 160 8.0%
140
8.0%
140
7.0% 7.0%
7.4%
5.8%
120 120 6.0%
100
6.5% 6.0% 100 5.0%
80 80 4.0%
60
4.1% 4.0%
60 3.0%
40 40 2.0%
59 54 55 55
2.0%
20
37 20 45 32
20
37 43 1.0%
0 0.0% 0 0.0%
Q1 2018 Q2 2018 Q3 2018 Q4 2018 Q1 2019 Q1 2018 Q2 2018 Q3 2018 Q4 2018 Q1 2019
Net Profit Net Profit Margin (%) Normalized Net Profit Normalized Net Profit Margin (%)
850 22.0%
21.1% 20.6%
750
18.2% 18.2%
152,262 153,551 16.8%
143,330
17.0%
650
134,949
124,893 550
491 483
72,583 459 438
12.0%
332 7.0%
303 293
250
79,680
66,500
150
159 191
50
134 140
180
30.2%
29.6%
30.0%
29.4%
24,243
22,588
28.0%
27.5%
140
120
26.2% 26.0%
98 107
15,862 17,606 97
15,639
100
13,665 13,850 89
24.0%
80
80 60 22.0%
5,800 67 70
60
60
20.0%
40
35
9,822 8,604 8,924 8,541 8,050 18.0%
31
20
27 28 27 25
0 16.0%
Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019 Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019
120
25.7% 25.0%
167,187
100
20.3% 20.0%
147,813 20,720
146,939 15.0%
300
12.2%
80
20,181 11.8% 69
62
10.0%
105,421 8.8%
59 2 12
100 51
60
90,909 10
5.0%
1
147,513 39
146,467
0.0%
40
126,758
105,321 60 57 -5.0%
90,909 50 50
20
39
-10.0%
0 -15.0%
Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019 Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019
169,826 MT
154,694 MT
146,375 MT
135,156 MT 138,075 MT
35% 19%
27% 23% 22%
21,118 MT 21,544 MT
81% 20,663 MT
65% 78% 19,973 MT
73% 77%
18,048 MT
Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019 Q1/2018 Q2/2018 Q3/2018 Q4/2018 Q1/2019
KK PB RY
Remarks : - Only 1 quicklime kiln at PB was operated in Q3 2018, Q4 2018 & Q1 2019
- KK1 quicklime kiln was temporary shut down for maintenance as per scheduled maintenance plan in Q3 2018
- KK3 quicklime kiln was temporary shut down for system connection with KK4 in Q4 2018
- KK4 quicklime kiln commenced operation in Q1 2019
2,223 2,253
1,070 1,223
739 875 877
650
1.27x
1.54x 1.21x
1.41x
1.02x
0.59x
0.68x 0.52x
33.50
33.00
Q2-2018
Q3-2018 Q4-2018
USD 32.50
Q1-2018
31.71
32.12
33.15 32.99
Q1-2019
32.00
31.79
31.50
31.00
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19
26.00
Q1-2018
25.50 25.19
Q2-2018
25.00 24.54
24.50
Q3-2018
AUD 24.00 24.52
Q1-2019
Q4-2018 22.91
23.50
23.93
23.00
22.50
22.00
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
Chememan Analyst Presentation Q1-2019 21
Progress Update
Installed Commercial
Project Owner Estimated
Location ship Capacity Operation
Investment (MT/year) Date
Civil Update
PEB structure of QL handling has completed.
Roads and drains work will be completed by July
2019.
PEB structure of LS handling under installation will
be completed by September 2019.
Mechanical Update
Installation of refractory has completed.
Equipment for Coal Grinding mill system under
installation will be completed by May 2019.
Equipment for QL handling under installation
will be completed by May 2019.
Commissioning Update
Kiln commissioning will be start by May 2019.
Coal Grinding mill commissioning will be start
by May 2019.
QL handling commissioning will be start by May
2019.
Some statements made in this material are forward-looking statements with the relevant
assumptions, which are subject to various risks and uncertainties. These include statements
with respect to our corporate plans, strategies and beliefs and other statements that are not
historical facts. These statements can be identified by the use of forward-looking
terminology such as “may”, “will”, “expect”, “anticipate”, “intend”, “estimate”, “continue”
“plan” or other similar words.
The statements are based on our management’s assumptions and beliefs in light of the
information currently available to us. These assumptions involve risks and uncertainties
which may cause the actual results, performance or achievements to be materially different
from any future results, performance or achievements expressed or implied by such
forward-looking statements.
Please note that the company and executives/staff do not control and cannot guarantee the
relevance, timeliness, or accuracy of these statements.