Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

6 February 2021

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

DATA KERUSAKAN & AKTIVITAS WORKSHOP HARIAN

06-Feb-21

KERUSAKAN BERAT
KERUSAKAN WAKTU PENGERJAAN MEKANIK

NO ALAT GRUP TANGGAL JAM TANGGAL JAM


JENIS KETERANGAN TANGGAL WO 1 2 3 4 5
PERBAIKAN PERBAIKAN SELESAI SELESAI

1 IS 15 ISUZU BERAT INSIDEN 24-Jun-18 - -


2 MB 005 ACTROSS BERAT INSIDEN BERAT ( PART DI CANIBAL) - - -
3 IS 18 ISUZU BERAT INSIDEN 5-Feb-19 - -
4 MA 105 AXOR BERAT INSIDEN 30-Jul-19 - -
5 LV 08 LIGHT VEHICLE BERAT ENGINE TROUBLE 12-Sep-19 - -
6 EX 12 EXCAVATOR BERAT HARNESS /ECM 2-Dec-19 - -
7 EX 09 EXCAVATOR BERAT ENGINE OVERHOUL 17-Feb-20 - -
8 EX 10 EXCAVATOR BERAT MAIN PUMP HYDRAULIC 25-Feb-20 - -
9 MA 86 AXOR BERAT INSIDEN - - -
10 WT 10 WATER TANK BERAT INSIDEN ( GARDAN, CABIN, TANKI) - - -
11 LV 01 LIGHT VEHICLE BERAT ENGINE OVERHOUL(UNIT DIKIRIM KE PONTIANAK) - - -

BREAKDOWN TRANSMISI ( WAITING MECHANIC PT


12 WL05 WHELL LOADER BERAT 5-Dec-20 - -
ITU )

ON PROGRESS COMPLETED MACHINE ( WAITING


13 HN156 HINO BERAT 14-May-20 - -
PART )
14 MA78 AXOR BERAT INSIDEN 16-Dec-20 - -

OLI ENGINE MIX TO OIL TRANSMISI (OVERHOUL


15 GD 01 GRADER BERAT 8-Jan-21 - -
ENGINE)

16 EX22 EXCAVATOR BERAT OVERHOUL ENGINE (ON PROGRESS) 27-Oct-20 - -

17 MA97 AXOR BERAT PROGRESS CKP (WAITING PART) 3-Nov-18

SWING MACHINERY ( CANIBAL CONTROL VALVE


18 EX11 EXCAVATOR BERAT 16-Aug-20 - -
EX10 )

RANGKUMAN
TOTAL RUSAK BERAT
EXCAVATOR 5 UNIT

ISUZU 2 UNIT

AXOR 4 UNIT

LIGHT VEHICLE 2 UNIT

HINO 1 UNIT

LIGHT TRUCK 0 UNIT

VIBRO 0 UNIT

WATER TANK 1 UNIT

ACTROSS 1 UNIT

WHELL LOADER 1 UNIT

GRADER 1 UNIT

DOZER 0 UNIT

GENSET 0 UNIT

TOTAL 18 UNIT

FINIS JOB
KERUSAKAN WAKTU PENGERJAAN MEKANIK
NO ALAT GRUP TANGGAL JAM TANGGAL JAM
JENIS KETERANGAN TANGGAL WO 1 2 3 4 5
PERBAIKAN PERBAIKAN SELESAI SELESAI

1 LT 06 LIGHT TRUCK RINGAN GANTI AKI 5-Feb-21 5-Feb-21 19.45 5-Feb-21 20.00 SULISTIO

2 EX 18 EXCAVATOR RINGAN SERVICE BERKALA 6-Feb-21 6-Feb-21 8.00 6-Feb-21 10.00 TEJO SUMITOMO ASIS HARIYANTO

CLAMP TANGKI PTO PUTUS, KEDUDUKAN PTO


3 HN 155 HINO RINGAN 6-Feb-21 6-Feb-21 7.30 6-Feb-21 8.30 PAK AMEN ARIF FIRMAN
PATAH

4 EX 04 EXCAVATOR RINGAN TIDA BISA RUNNING 6-Feb-21 6-Feb-21 7.30 6-Feb-21 8.30 PAK RHEZA PINUS

5 MA 70 AXOR RINGAN TIDAK BISA STARTER, LAS CLAMP ACCU 6-Feb-21 6-Feb-21 7.30 6-Feb-21 8.30 MARGONO INDRA MUSLIADI

6 MB 010 ACTROSS RINGAN CLAMP COMPRESSOR KENDOR, GREASING 6-Feb-21 6-Feb-21 7.40 6-Feb-21 8.30 GALANG JIRAN

7 MA 74 AXOR RINGAN STEL REM 6-Feb-21 6-Feb-21 7.30 6-Feb-21 7.40 RICARDO

8 MA 70 AXOR RINGAN GANTI ACCU 6-Feb-21 6-Feb-21 9.00 6-Feb-21 9.20 PINUS

9 WT 09 WATER TANK RINGAN TIDAK MAU DISTARTER 6-Feb-21 6-Feb-21 10.20 6-Feb-21 10.50 ANGGI

10 HN 139 HINO RINGAN SERVICE AC, CEK TIE ROD 6-Feb-21 6-Feb-21 9.30 6-Feb-21 10.00 PAK AMEN ARIF

SELANG MINYAK BOCOR, GANTI KABEL JARUM


11 WT 14 WATER TANK RINGAN 6-Feb-21 6-Feb-21 7.30 6-Feb-21 10.00 RICARDO EDI
MINYAK, KONEKTOR DAN CLAMP HOSE

12 HN 160 HINO RINGAN LAMPU SEIN DAN WIFER MATI 6-Feb-21 6-Feb-21 9.40 6-Feb-21 10.10 JUNAIDI

13 HN 158 HINO RINGAN SPRING RH NO 1 DEPAN PATAH 5-Feb-21 6-Feb-21 7.30 6-Feb-21 10.00 SUHAIMI ANGGI

TAMBAH OLI HYDROLIC, GREASING DAN TERIKAN


14 MA 104 AXOR RINGAN 6-Feb-21 6-Feb-21 8.00 6-Feb-21 9.20 RODI
BOLT ROD DUMP

15 WT 12 WATER TANK RINGAN BOLT CHASIS L/R BELAKANG KENDOR 6-Feb-21 6-Feb-21 7.30 6-Feb-21 9.20 SATO BUDIMIN

16 HN 152 HINO RINGAN SPRING LH BELAKANG PATAH NO 5,6,7,8 5-Feb-21 5-Feb-21 16.00 6-Feb-21 9.30 JUNAIDI HERI MUHARDI

17 LT 07 LIGHT TRUCK RINGAN SERVICE BERKALA 6-Feb-21 6-Feb-21 9.10 6-Feb-21 9.40 RODI JIRAN FIRMAN
18 EX 29 EXCAVATOR RINGAN SERVICE BERKALA 6-Feb-21 6-Feb-21 13.30 6-Feb-21 15.30 TEJO SUMITOMO PINUS HARIYANTO

19 BD01 DOZER RINGAN PENGELASAN BLADE ASM 6-Feb-21 6-Feb-21 13.00 6-Feb-21 16.00 JULIUS JOLA JULIANSYAH RIDUAN

LAS TANGKI BBM BOCOR, RANTAI LOCK OTOMATIS


20 HN 138 HINO RINGAN 6-Feb-21 6-Feb-21 13.00 6-Feb-21 14.00 HERI
PUTUS

21 EX 01 EXCAVATOR RINGAN HOSE BOCOR, TAMBAH OLI HYDROLIC 6-Feb-21 6-Feb-21 13.00 6-Feb-21 13.30 HARIYANTO

22 EX 04 EXCAVATOR RINGAN HOSE BOCOR, TAMBAH OLI HYDROLIC 6-Feb-21 6-Feb-21 14.00 6-Feb-21 14.30 HARIYANTO

23 HN 150 HINO RINGAN SEAL VALVE BOCOR 6-Feb-21 6-Feb-21 13.00 6-Feb-21 15.00 JUNAIDI HERI MUHARDI

24 LV 12 LIGHT VEHICLE RINGAN TIDAK BISA STARTER 6-Feb-21 6-Feb-21 11.00 6-Feb-21 14.00 PAK AMEN ARIF

25 LT 01 LIGHT TRUCK RINGAN PASANG TIE ROD, CLAMP TANGKI BBM PUTUS 6-Feb-21 6-Feb-21 10.30 6-Feb-21 11.00 HERI JUNAIDI

26 MA 83 AXOR RINGAN LOW POWER 6-Feb-21 6-Feb-21 13.30 6-Feb-21 13.50 RICARDO ANGGI

RADIATOR PANAS, GANTI KARET DINGDONG L/R


27 MB 007 ACTROSS RINGAN 5-Feb-21 6-Feb-21 9.00 6-Feb-21 14.00 SATO BUDIMIN
BELAKANG BAGIAN TENGAH

28 HN 138 HINO RINGAN LAS KUPING DUMP ATAS LEPAS 6-Feb-21 6-Feb-21 16.00 6-Feb-21 16.30 JODI

29 MA 83 AXOR RINGAN STEL REM 6-Feb-21 6-Feb-21 16.30 6-Feb-21 16.40 BUDIMIN

30 EX 01 EXCAVATOR RINGAN HYDROLIC LOW POWER 6-Feb-21 6-Feb-21 15.30 6-Feb-21 16.00 NOVI PAK RHEZA

SEAL RODA LH BELAKANG BAGIAN TENGAH


31 MA 95 AXOR RINGAN BOCOR, CEK KAMPAS REM L/R BELAKANG, LAMPU 6-Feb-21 6-Feb-21 9.30 6-Feb-21 15.00 ANDRI INDRA EDI MUSLIADI
SEIN BELAKANG MATI, LAS KEDUDUKAN LAMPU

RANGKUMAN
UNIT SELESAI DI KERJAKAN
EXCAVATOR 6 UNIT

ISUZU 0 UNIT

AXOR 7 UNIT

LIGHT VEHICLE 1 UNIT

HINO 8 UNIT

LIGHT TRUCK 3 UNIT

VIBRO 0 UNIT

WATER TANK 3 UNIT

ACTROSS 2 UNIT

WHELL LOADER 0 UNIT

GRADER 0 UNIT

DOZER 1 UNIT

GENSET 0 UNIT

TOTAL 31 UNIT

OUTSTANDING JOB
KERUSAKAN WAKTU PENGERJAAN MEKANIK
NO ALAT GRUP TANGGAL JAM TANGGAL JAM
JENIS KETERANGAN TANGGAL WO 1 2 3 4 5
PERBAIKAN PERBAIKAN SELESAI SELESAI
1 MB004 ACTROSS RINGAN ROD DUMP BENGKOK ( WAITING PART ) 28-Nov-20

GARDAN BELAKANG BERMASALAH (ON


2 MA 84 AXOR RINGAN 5-Jan-21
PROGRESS)

3 EX 06 EXCAVATOR RINGAN RADIATOR SUMBAT ( WAITING PART) 25-Jan-21

SERVICE DUMP , REBUILD CHASIS (DALAM


4 MB 002 ACTROSS RINGAN 31-Jan-21
PENANGANAN)

INSTALASI TRACKLINK, REBUSHING PIN BUCKET,


5 EX 14 EXCAVATOR RINGAN 1-Feb-21
RESEAL CONTROL VALVE (DALAM PENANGANAN)

OLI SWING CAMPUR HYDROLIC, RESEAL CYLINDER


6 EX 05 EXCAVATOR RINGAN 1-Feb-21
BOOM (PENDING JOB)

SEAL GARDAN AXLE 3 BELAKANG BOCOR,


7 HN 151 HINO RINGAN 4-Feb-21
GREASING(DALAM PENANGANAN)

8 IS 16 ISUZU RINGAN VALVE ANGIN BOCOR, LOW POWER, GREASING 6-Feb-21

9 MA 104 AXOR RINGAN SHAFT LINTANG RH BELAKANG PUTUS 6-Feb-21

BOLT V-STAY KENDOR, CEK KAMPAS REM


10 MA 81 AXOR RINGAN 6-Feb-21
BELAKANG , ANGIN TEKOR, STEL REM

PROFFELER SHAFT BELAKANG LEPAS, SPRING LH


11 MB 003 ACTROSS RINGAN 6-Feb-21
NO 1 BELAKANG PATAH (POSISI KM 16)

SERVICE BERKALA, CEK KAMPAS REM L/R DEPAN,


12 MA 94 AXOR RINGAN 6-Feb-21
MASUK GIGI KERAS, LAMPU ROTARY MATI
RANGKUMAN
UNIT OUTSTANDING
EXCAVATOR 3 UNIT

ISUZU 1 UNIT

AXOR 4 UNIT

LIGHT VEHICLE 0 UNIT

HINO 1 UNIT

LIGHT TRUCK 0 UNIT

VIBRO 0 UNIT

WATER TANK 0 UNIT

ACTROSS 3 UNIT

WHELL LOADER 0 UNIT

GRADER 0 UNIT

DOZER 0 UNIT

GENSET 0 UNIT

TOTAL 12 UNIT

You might also like