Introduction of Industrial Building System in Malaysia
Introduction of Industrial Building System in Malaysia
Introduction of Industrial Building System in Malaysia
>70% IBS
Failure of Content in
application Construction
1966 2000s
1970s 2008
Blockwork system
Type of IBS used in Malaysia Steel Formwork System
Blockwork system
Type of IBS used in Malaysia Blockwork system
Cost saving
• High quality components
• Reduce construction
• Temperature controlled
wastage
steam curing
• Reduce unskilled walker
environment
Safe working
Shorter time needed
for Completion Safe working environment
• More assembly-type
• Production of IBS
operation
components starts during
• Provide cleanliness at
pre-construction period
side
Challenges