Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Project Report FOR Build Toilets For School Children in Nigeria

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

www.vistainfinity.

org

PROJECT REPORT
FOR
BUILD TOILETS FOR SCHOOL CHILDREN IN NIGERIA.

Project Initiated by

Vista Infinity Initiative


Vista Infinity Initiative is a Nigerian registered Non Governmental Organization with a proactive
orientation and affirmative believe in attitudinal change and a paradigm shift in the approach to life and
life’s issues.

As change agent, our main area of focus are the mind (the centre of knowledge), the heart (the well
spring of creativity and proactivity) and the mentality (the centre of the individuals well being).

We understand that change is as much internal as it is external, thus a positive change in the internal
environment of an individual will greatly affect his external world.

OUR MISSION

We are mission driven to enable people visualize, achieve and maximize their given talents and
potentials.

We believe that every individual irrespective of his or her background is born with unique talents and
potentials.

OUR VISION

Get people to know and develop their worth- physically, mentally and psychologically.

When an individual is aware of his or her worth physically, mentally and psychologically, they have value
for their lives are thus are goal oriented and positive agents of change in the their world and
environment.

Vista Infinity Initiative was founded by Ms. Esther Umeadi Ebenuwah. A Bachelors and Masters of
Science degree holder in Marketing from Delta State University Abraka and the University of Nigeria
Enugu Campus. The vision of Vista Infinity Initiative was birthed out of the need to serve and make a
difference in the life of a youth, woman and child because these class of individuals make up the fabric
of society and most times when the fabric is not woven well, it affects the entire system in a subtle and
yet enormous way.

Vista Infinity Initiative is an initiative that is passionate about positive and proactive societal change; we
are a 21st century oriented non-governmental organization, with a 3 dimensional focus on LEADERSHIP,
ENTREPRENEURSHIP AND COMMUNITY DEVELOPMENT.

We aim for value in the form of transformational change that will be of benefit to disadvantaged
communities and ultimately the society at large. To this end we pioneer innovative and systemic
approaches for meeting the needs of the disenfranchised and marginalized population that lack the
means and the clout to achieve lasting benefits of their own.
PROJECT: BUILD TOILETS FOR SCHOOL CHILDREN IN OGBE-AFOR PRIMARY SCHOOL ASABA, ZAPPA
PRIMARY SCHOOL ASABA, COMMUNITY PRIMARY SCHOOL UGBOLU, OKOH AMAKOM PRIMARY
SCHOOL OKO AND OGBE-OLIE PRIMARY SCHOOL CABLE POINT, ASABA.

LOCATION: The Schools are all located within Delta State, Nigeria.

BACKGROUND HISTORY OF THE SCHOOL.

These primary Schools were founded by European Missionaries in the latter part of the 19th century. The
Schools were originally meant for girls only, but it later metamorphosed into a mixed School in the early
1970s, after the Nigerian civil war.

The named schools has turned out notable Nigerians amongst whom are Mrs. Miriam Babangida, late
wife of the former Nigerian head of state, Mrs. May Omo, wife of Late Justice Omo and hundreds of
others. The School has a rich culture of success and credibility over the decades. This is justified by the
quality of pupils they register for the common entrance examinations into secondary schools.

PROJECT JUSTIFICATION.

An appraisal of the current state of the aforementioned schools showed that most of the toilet blocks
are dilapidated and need urgent attention in order to save them from total collapse. The structures are
old and not of standard, the roofs are seriously leaking, the ceiling boards are completely destroyed, the
walls are blighted and toilets holes for the ones that are pit toilets are very worn out and weak that it
could collapse with a little pressure.

The need for a conducive learning environment at the primary school level cannot be over emphasized.
There is a psychological correlation between a clean and decent learning environment and assimilation
levels. Learning is enhanced when the school (by extension the toilets) are in good conditions. These
include:

• Structural stability
• Weather exclusion(Roofs and ceilings)
• Good flooring
• Good fenestrations(Doors and Windows)
• Appropriate paintings and finishes.
• Functional toilet materials and furniture
• Electrical/Mechanical services
• Lighting(Natural and Mechanical)
Entrance into a typical public school toilet

Dilapidated block of toilet building at community primary school Ugbolu


Photo of a school child defecating in front of her classroom

picture of two pupil converting their school fence to toilet at ogbe afor primary school
Interior of a typical ground toilet and the floor Condition of the toilet

BRIEF/SCOPE OF WORK.

The brief is to build a block of 10 toilets (comprising of 4 for male, 4 for female and 2 for teachers of the
school) Classroom and make it fit for learning. Work comprises:

1. Complete roofing.
2. Noggin and replacement of ceiling boards.
3. New floor Screed
4. Placement of windows and Doors including ironmongery.
5. Painting.
6. Provision of WC toilet seats, washing hand basins for the pupils.
7. drilling of borne hole for water supply and maintenance of the project.

PROJECT PHILOSOPHY, OBJECTIVES AND CONSIDERATIONS

The proposed BUILD TOILETS FOR SCHOOL CHILDREN IN NIGERIA, should be an exemplary Primary
school toilet block in terms of comfort, appearance and significance. The design approach adopted here
seeks to provide conducive, congenial and befitting block that would ultimately and adequately
enhance the learning process of the pupils.
OBJECTIVES.

• Generally the concept aims at creating a convenient, functional and attractive toilet block of
international standard that will enhance clean environment, healthy learning and proper
development of the pupils.
• Enrich the general landscape of the school environment.
• The proposed construction should be an outstanding architectural edifice.

DESIGN CONSIDERATIONS

Economy of construction: Cost of construction is moderate. Choice and specifications of


materials are cost effective.

Aesthetics: Pleasing facades, achieved with combination of warm colours will enhance the
school landscape.

Structural Stability: The cracks on walls and floors are strengthened or replaced where
necessary.

MATERIALS.

WALLS: A combination of 225mm and 150mm sand Crete hollow block wall, well rendered to receive
painting.

WINDOWS: All windows shall be of well seasoned hardwood with 2 coats of gloss paint.

DOORS: All Doors shall be of Timber panel doors. 2 coats of paint.

FINISHING (PAINTING)

The finishing of the building shall be a combination of gloss and emulsion paint in accordance with the
Architect’s specification and finishes’ schedule.

THE ROOF

The roof shall be long-span aluminum roofing sheets nailed on well treated hardwood truss.

PROJECT DURATION.

The duration for the project is estimated at 5 weeks. It is proposed to commence at the close of
the academic term; when the children are on holiday.
PROJECT COST.

Budget for the project BUILD TOILETS FOR SCHOOL CHILDREN IN NIGERIA.

DESCRIPTION AMOUNT($)

Excavation & Earthwork 5900

Concrete Work 10500

Block Work 9000

Roof Structure 10600

Doors & Windows 3000

Finishing (tiles, lighting, borne hole etc) 50000

Painting Work 3000

Toilet seats and fittings 2000

Subtotal 49000

Contingencies 1000

Total 50000

The total estimated cost for the project from start to completion to meet the standard
obtainable is US $50000.

For enquires please call

+234803 666 4835

or please send an email to: info@vistainfinity.org.

Thank you as you donate to our project and join hands in fellowship with us in making a
difference in our world.

You might also like