Fachry Zaidan: Curriculum Vitae
Fachry Zaidan: Curriculum Vitae
Fachry Zaidan: Curriculum Vitae
Fachry Zaidan
Jln. M. Yacob No. 152 A, Medan – North Sumatera, Indonesia
Tel: +6282397452748, +6285270539045
Email: fachryzaidan9@gmail.com
EDUCATION
1986 – 1993 : Bachelor Degree, Majoring in Mechanical Engineering,
Syiah Kuala University,Banda Aceh.
WORK EXPERIENCE
December 2019 – up now
Part-timer for some Palm Oil Mill & Kernel Crushing Plant Project in Indonesia.
Project Completion:
Sulsel Barru 2, Coal Fired Steam Power Plant Project 1x100 MW, Barru, South Sulawesi,
Indonesia. Consortium by PT. WIKA & MITSUBISHI Co. Ltd. Owned by PT. PLN
(Persero).
Responsibilities:
To lead the Planning & Engineering Division, planning, scheduling, method statement,
procedure of works, progress & reports. Responsible to Site Manager.
September 2016 – July 2019
Project Manager
PT. VIKNAtech INDONESIA
Palm Oil Mill Consultant, Engineers & Project Managers
Project Completion:
1. Palm Oil Mill Maintenance Project. Owned by Good Hope Asia Co. Ltd, Terawan,
Central Kalimantan, Indonesia. Oct 2018 – March 2019.
2. Palm Oil Mill Project 15 FFB TPH, Nabire, West Papua, Indonesia, Ownered by Good
Hope Asia Co. Ltd, June 2018 – September 2018.
3. Palm Oil Mill Project 45 / 90 FFB TPH, Mouila, Gabon, Africa. Owned by Olam Int. Ltd,
Singapore. February 2017 – April 2017.
4. Palm Oil Mill Project 30 / 45 FFB TPH, Muara Tebo, Jambi, Indonesia. Owned by PT.
Tebo Indah (Agro Investama Group, Jakarta, Indonesia). June 2016 – November
2016.
Responsibilities:
To supervise and advise for all scope of project, reporting, coordination to owner & main
contractor. Responsible to General Manager.
Project Completion:
Palm Oil Mill Project 30 / 60 FFB TPH, Merauke, Papua, Indonesia. Joint Operation with
PT. AGFA AJI PRATAMA, Bekasi, Indonesia. Ownered by PT. Bio Inti Agrindo (Daiwoo
International Ltd., South Korea).
Responsibilities:
To assist Project Manager for all scope of project management works such as site
supervision, reporting & coordination to owner & sub-contractor. Responsible to Project
Manager.
Project Completion:
Palm Oil Mill Project 30 / 60 FFB TPH, Merauke, Papua, Indonesia. Joint Operation with
POSCO Plantec, South Korea. Ownered by PT. Bio Inti Agrindo (Daiwoo International Ltd.,
South Korea).
Responsibilities:
To assist the Project Manager for all scope of project management works such as site
supervision, reporting & coordination to owner & main contractor. Responsible to Project
Manager.
February 2015 – September 2015
Project Completion:
Palm Oil Mill Project 15 / 45 TPH FFB & Kernel Crusher Plant Project 20 / 50 TPD, Gabon,
Africa, OLAM International Ltd.
Responsibilities:
To assist Senior Project Manager for all scope of project management works such as site
supervision, reporting & coordination to owner & main contractor. Start from fabrication till
to commissioning. Responsible to Senior Project Manager.
Mechanical Superintendant
PT. Permata Hijau Group, Medan, North Sumatra, Indonesia
Plantation, Palm Oil Mill, Refinery Plant, Palm Oleo & Biodiesel Producer.
Project Completion:
Oil Storage Tank, Machineries & Equipment & Piping Work.
Responsibilities:
To assist General Manager for Oil Storage Tank, Machineries & Equipment & Piping Work
in supervision, reporting & coordination to engineers & main contractor. Start from
fabrication till to commissioning. Responsible to General Manager.
Freelancer
For some Palm Oil Mill Project as a Technical Advisor
Responsibilities:
To assist Operational Manager for all scope of project management works: planning, final
design engineering, monitoring and evaluation on Palm Oil Mill Project and others.
Contract Arrangement, Sub-contractor & Suplyer selection, Matrial and cost controll,
Quality Control, Schedule control, Reporting. To ensure all of works accordance to SOP
including fabrication, delivery, assembly, erection and commissioning. Responsible to
Operational Manager.
Project completion :
Palm Oil Mill Project 60 Ton/hr Cap., Kab. Banjar, South Kalimantan, Indonesia. PT.
Palmina Utama (JULONG GROUP).
February 2003 – January 2013
Responsibilities:
To assist Senior Project Manager to execute all scope of Palm Oil Mill and Crumb Rubber
Factory Projects, including planning, design, engineering, monitoring & supervision for
fabrication, erection, assembly and commissioning as per SOP.
Project completion :
1. PT. Agro Sukses Lestari, Palm Oil Mill Project, 50 Ton/hr Cap., Kab. Sintang, West
Kalimantan, Indonesia, 2012.
2. PT. Sumatera Jaya Agro Lestari, Palm Oil Mill Project, 50 Ton/hr Cap., Kab. Sanggau,
West Kalimantan, Indonesia, 2011.
3. PT. Transco Pratama, Crumb Rubber Factory Project, 3000 ton/month, Kab.
Dharmasraya, West Sumatera, Indonesia, 2010.
4. PT. Bintara Tani Nusantara, Palm Oil Mill Project, 50 Ton/hr Cap., Kab. Pasaman, West
Sumatera, Indonesia, 2009.
5. PT. Multi Jaya Perkasa, Palm Oil Mill Extension Project, up grade from 30 Ton/hr to 45
Ton/hr Cap., Kab. Sekadau, West Kalimantan, Indonesia, 2008.
6. PT. Megasawindo Perkasa, Palm Oil Mill Project, 45 Ton/hr Cap., Kab. Tebo, Jambi,
Indonesia, 2007.
7. PT. Hervenia Kampar Lestari, Crumb Rubber Factory Project, 4500 Ton/month Cap.,
Kab. Kampar, Riau, Indonesia, 2006.
8. PT. Sukses Maju Abadi, Palm Oil Mill Project, 45 Ton/hr Cap., Kab. Tebo, Jambi,
Indonesia, 2005.
9. PT. Megasawindo Perkasa, Crumb Rubber Factory Project, 3000 Ton/month Cap., Kab.
Tebo, Jambi, Indonesia, 2004.
10. PT. Pasaman Marama Sejahtera, Palm Oil Mill Project, 45 Ton/hr Cap., Kab. Pasaman,
West Sumatera, Indonesia, 2003.
1998 – 2003
1995 – 1998
Mechanical Engineer
PT. FLORA SAWITA CHEMINDO, Medan, Indonesia
Fatty Acid & Glycerine Producer Specialist Company.
Oleochemical Plant Project, 180 Ton/day.
Responsibilities :
To assist Site Manager all scope for supervision of mechanical works site project : material
control, fabrication, assembly, erection, commissioning, steel structure construction, tanks,
piping, vessel and other machinery and equipments. Coordination to contractors and
supliers. Reporting. Responsible to Site Manager.
1994 – 1995
Foreman Asisstant
PT. ABDI RAKYAT BHAKTI, Medan, Indonesia
Sheet Glass Industry Extension Project
Responsibilities
To assist Utility Supervisor to supervision mechanical work for Water Treatment Plant,
Waste Water Treatment Plant & Steam Power Plant. Responsible to Utility Supervisor.
1992 – 1994
Technical Staff
PT. ALDINO MUDA PROSPINDO, Banda Aceh, Indonesia
General Contractor & Supplier.
Responsibilities :
To assist Site Manager to supervision at bridge projects. Material and cost control. Quality
Control. Responsible to Site Manager.
SEMINAR & TRAINING 1997 : Seminar “Automation Integrated System”, PT. SIEMENS Indonesia, Medan,
Indonesia.
1994 : “Motivation and Achievement Training”, Indonesian Man Power Dept., Medan,
Indonesia.
1991 : On The Job Training, PT. Pupuk Iskandar Muda (Persero), Lhokseumawe,
Nanggroe Aceh Darussalam, Indonesia.
Yours Faithfully,
Fachry Zaidan