Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Pump Commissioning Checklist - SafetyCulture

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

12/15/2019 Pump Commissioning Checklist - SafetyCulture

GO DIGITAL TODAY
Convert your paper
checklists into digital forms
Scan this QR code to use this
paper checklist on your
smartphone or tablet. Visit
www.iauditor.com

Pump Commissioning Checklist

Pump Commissioning

Is the completion of equipment installation in all respect as per respective


drawings/documents?

Yes No N/A

Are bearings and hydraulic coupling lubricated with speci ed lubricant?

Yes No N/A

Are the couplings between in perfect alignment?

Yes No N/A

Are coupling bolts and guard installed?

Yes No N/A

Is the rotor free in its bearings?

Yes No N/A

Is the pump/engine rotating direction correctly? (The orientation of the pump


must match the arrow.)

Yes No N/A

https://public-library.safetyculture.io/products/pump-commissioning-checklist?src=sc&amp_dev=7f762473-ce47-4ec0-8a6c-cbe6bf138794R 1/3
12/15/2019 Pump Commissioning Checklist - SafetyCulture

Are instrumentation and protection devices checked by simulation? Are


measuring and monitoring instruments okay?

Yes No N/A

Is the Oil Flushing of Oil Circuit over successfully? Is new oil lled in the hydraulic
coupling and oil circuit?

Yes No N/A

Is the reverse rotation detection switch on hydraulic coupling and protection


okay?

Yes No N/A

Are holding-down bolts tted securely?

Yes No N/A

Are leakage lines for drain, wind, and gland directed correctly to prevalent drains?

Yes No N/A

Are the automatic recirculation valves and back pressure valve correctly tted in
the recirculation line?

Yes No N/A

Are oil coolers, oil pipes, and cooling water pipelines installed properly as per
Piping and Instrumentation Diagram (P&ID) and General Arrangement (GA)?

Yes No N/A

Are mechanical seals checked?

Yes No N/A

https://public-library.safetyculture.io/products/pump-commissioning-checklist?src=sc&amp_dev=7f762473-ce47-4ec0-8a6c-cbe6bf138794R 2/3
12/15/2019 Pump Commissioning Checklist - SafetyCulture

Are the Discharge Valves of Pumps kept closed?

Yes No N/A

Are Line Vents kept opened?

Yes No N/A

Completion

Additional Comments

Enter text

Witnessed by: 

Installer Name & Signature 

Contractor Name & Signature 

https://public-library.safetyculture.io/products/pump-commissioning-checklist?src=sc&amp_dev=7f762473-ce47-4ec0-8a6c-cbe6bf138794R 3/3

You might also like