The Executive Engineer Division Hoshangabad (M.P.) Letter Acceptance
The Executive Engineer Division Hoshangabad (M.P.) Letter Acceptance
The Executive Engineer Division Hoshangabad (M.P.) Letter Acceptance
DIVISION
HOSHANGABAD {M.P.}
- \\.8.M. and B.T. Patch rcpair on Seonimahva Pipaliya approach road, Nandarwada
kol lajhir roacl, B Jamaui to Mahuadhana road, Lokhartalai to surajpur road,
Seonimalwa Samardha roail, Seonimalwa Samardha road to Bankabedi road'
(P.A.C. - 17.05 Lacs)
**++******+
- ".r Sir(s),
Your bid the work meltioned above has beetr accepted on bahalf ofthe Govemor of
for
l.i.rcih1'a Praclesh at your bided pcrcentage 26.99 below/abo+e or at par the Bill of Quantities
and
YouarereqUestedtosubmitwithinl5(Fifteen)daysfromthedateofissueofthis
etter.
il. The perfomance security / performance guarantee ofRs. (5% P'G') 62241 + l,.'99o/o Ld'
P.c:) ,492541- = 2ll495t- ( in figure Rupees Two Lacs Eleven. Thousand Four
Ilundrett Ninty Five Rupees in woids only). The performance security shall be in the
shape of term deposit receipt / bank guarantee of any nationalized / schedule commefcial
bark valid upto three months after the expiry of defects liability period'
b. Sign the contract agreemcnt.
please note that the time allowed for carrying out the work as entered in the bid is Three
months including / €xetudillg rainy season, shall be reckoned ftom the date of signing the
conffacI agfeement,
Signing the contmct agreeurent shall be reckoned as intimation to commencement ofwork
and oo sip*ite letter for commencement of work is required. Therefore, after signing
of the
ugraa-"nq you ur" directed to contact the Engineer-in-charge for taking the possession ofsite and
necessary instructions to start the work.
Yours FaithfullY