The document is an inspection test record for a high voltage cable system. It lists 15 inspection and test items to verify various aspects of the cable installation including: that the correct cables were installed in the proper locations and secured appropriately; terminations and joints are correct; insulation resistance and continuity tests were performed successfully; and the system is clean with no defects. Upon completion, the record must be signed off by representatives from the designing, installing, and accepting organizations.
The document is an inspection test record for a high voltage cable system. It lists 15 inspection and test items to verify various aspects of the cable installation including: that the correct cables were installed in the proper locations and secured appropriately; terminations and joints are correct; insulation resistance and continuity tests were performed successfully; and the system is clean with no defects. Upon completion, the record must be signed off by representatives from the designing, installing, and accepting organizations.
The document is an inspection test record for a high voltage cable system. It lists 15 inspection and test items to verify various aspects of the cable installation including: that the correct cables were installed in the proper locations and secured appropriately; terminations and joints are correct; insulation resistance and continuity tests were performed successfully; and the system is clean with no defects. Upon completion, the record must be signed off by representatives from the designing, installing, and accepting organizations.
The document is an inspection test record for a high voltage cable system. It lists 15 inspection and test items to verify various aspects of the cable installation including: that the correct cables were installed in the proper locations and secured appropriately; terminations and joints are correct; insulation resistance and continuity tests were performed successfully; and the system is clean with no defects. Upon completion, the record must be signed off by representatives from the designing, installing, and accepting organizations.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 2
JX NIPPON OIL & GAS EXPLORATION
INSPECTION TEST RECORD (ITR) - A
HIGH VOLTAGE CABLE E22-A
Project No Project Title Facilities INFORMATION Tag No. System/ Sub System No. Cable Core/ Size Cable From Cable To Ref. Drawing Nos. Voltage INSPECTION / TEST OK N/A P/L NO 1 Documents required: a) Cable layout drawing b) Cable schedule and drum list 2 Verify to ensure that all construction / installation activities have been completed. 3 Cable installed, identified, dressed and secured, cable rack / tray segregation and bending radius as per project specifications and design. Verify and confirm single core cables are using trefoil clamps, cable gland and gland plate made of nonmagnetic material. 4 Glanding, phase identification and termination kits correctly installed to vendors specifications. 5 Verify cable type and size in accordance with cable schedule. 6 Verify terminations are tight. Record torque if applicable. 7 Insulation Resistance Test. Measure and record insulation resistance (IR) of each conductor with all other conductors and shields grounded. Subsequently, measure IR for phase to phase conductor with other conductor and shield grounded. Refer PTS 63.10.08.11 for suitable test voltage and acceptable insulation reading.
Test Point Insulation Remarks
Resistance R-YBE Y-RBE B-RYE
Discharge all conductors to ground for a minimum period of 1 minute.
(Note: Hi-pot test to be done during pre-commissioning and commissioning only).
8 The cable continuity to be tested using a suitable multi-meter, set to
ohms. Measured resistance to be compared with the datasheet value. Measured cable resistance ……………... Ω 9 Gland body to earth path resistance (Max 0.1Ω) 10 Cable joints, if any are completed, identified and the location is marked in cable schedule and relevant layout drawings. 11 Cable joints, if any are completed, identified and the location is marked in cable schedule and relevant layout drawings. JX NIPPON OIL & GAS EXPLORATION
INSPECTION TEST RECORD (ITR) - A
HIGH VOLTAGE CABLE E22-A
INSPECTION / TEST OK N/A P/L NO 12 Cable joints, if any are completed, identified and the location is marked in cable schedule and relevant layout drawings. 13 Record any defects/shortcomings in the system punch-list. 14 Verify no dust inside enclosure /cabinet / panel and insulation surfaces are clean. 15 Verify instruments & its accessories /electrical equipment/panel externally clean. COMMENT(S) AND ADDITIONAL INFORMATION
COMPLETED BY VERIFIED BY ACCEPTED BY
DESIGNATION DESB Representative NIPPON Inspector Discipline Engineer COMPANY JX NIPPON JX NIPPON NAME SIGNATURE DATE