Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

10 JSA Excavation, Lowering, Back Filling

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

HSE-ICG/PCJ-3075-CA/JSA.

010
Date:

PetroChina International Jabung Ltd. Job Safety Analysis

Job: Excavation, Lowering And Back Filling Sabar #2 Pad Title of person Analyzed by:
who does the job: Supervisor, HSE, Operator, Rigger,
Surveyor, Helper, Flag man

Work Crew Leader


Department : Section: Reviewed by: Approved by:
PT. IndoCipta Gemilang Construction Work Crew Supv: Area Supv: F/S Supv:

Construction Manager

Personal protective equipment (PPE) : Write down correct specifications of personal protective

Put on PPE required for a safe job. equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / boots √
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary √ 17. Rubber boots
3. Goggles – ordinary 8. Dust mask 13. Gloves - 18. Prot. Clothing /
Chemicals Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – Thermal 19. Body harnesses, L-
lenses line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Preparation  Miscommunication  Use Standard PPE (Safety Helm  Prepare Permit To Work
 Misunderstanding ,safety glasses ,coverall, safety  Pre-job safety meeting.
 Failure shoes)  Discuss JSA to workers before job
 Discuss emergency response
preparedness to workers if
emergency situation happen
 Good communication with
personnel
 Everyone has permission to stop
the job when any unsafe condition.
1) Persiapan  Miskomunikasi  Gunakan PPE standard  Persiapan Izin Kerja
 Kesalahpahaman (Helm,Kacamata, coverall,  Melakukan pembicaraan
 Terjadi kegagalan sepatu) keselamatan sebelum bekerja
 Membicarakan JSA kepada pekerja
sebelum bekerja
 Membicarakan tanggap darurat ke
pekerja jika terjadi situasi darurat
 Komunikasi yang baik antar
personil
 Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan pekerja
di segala kondisi.
2) Preparation of Tools, and Equipment  Pinch point  Use Standard PPE (Safety  Ensure all the equipment has been
and Safety Sign  Miscommunication Helm,safety glasses,coverall, inspected and check by PCI and fit
 Misunderstanding safety shoes) for use
 Failure  Be careful when pick up tools
 Watch body position
 Everyone must pay attention at all
times

 Stay focused
 Ensure tools ready to use
 Ensure all document for already
accepted and reviewed by PCI
 Proper Safety Sign and barricade
will be install prior execution
 During Mobilization to the work
location, ensure that proper access
and safe for heavy equipment
layout and position
 The equipment layout do not
interfere with another traffic or
transportation
 Check list all equipment and tools
will be use before work activity.
2) Mempersiapkan Izin Kerja dan alat-alat  Terjepit  Gunakan PPE standard  Pastikan semua peralatan yang
 Miskomunikasi (Helm,Kacamata, coverall, dipergunakan untuk pekerjaan
 Kesalahpahaman sepatu) sudah lulus inspeksi oleh PCI dan
 Terjadi kegagalan baik untuk digunakan.
 Berhati-hati ketika mengambil
peralatan
 Memperhatikan posisi tubuh
 Setiap orang harus
memperhatikan pekerjaannya dan
lingkungannya setiap waktu
 Tetap focus
 Memastikan semua peralatan siap
untuk digunakan
 Memastikan semua dokumen telah
disetujui dan ditinjau kembali oleh
pihak PCI
 Tanda Tanda Keselamatan dan
barricade terpasang sebelum
aktivitas dimulai.
 Pastikan operator & equipment
telah tersertifikasi oleh disnaker
 Ketika mobilisasi alat berat ke
lokasi dipastikan lokasi
penempatan alat berat yang aman
dan tidak menganggu aktivitas lalu
lintas transportasi
 Periksa semua peralalatan dan
alat-alat yang akan digunakan
selama pekerjaan.
3) Trenching  Excavator swing and collision  Use Standard PPE (Safety  Ensure the excavator position is
Helm,safety glasses,coverall, not at the edge of the soil heap.
 Hit by excavator bucket on existing
safety shoes)  Make sure the position of
pipe on location
excavator is stable
 Fallen down to the excavated hole  Ensure the workers position out of
 Hit by excavator bucket, radius bucket swing
personnel injury  Make sure the operator of view is
 Erosion not blocked
 Working whit full concentration
 Lack of lighting ( work at night )
 Endure the excavator is operated
on hard land base
 Ensure that working area is safe
for excavator movement
 Provide signalman to handle
excavator activity
 Provide barricade and warning
board at the working area
 CTR provide certificate for
Operator
 Uninvolved personnel to keep
away from working area
 Daily check the excavator condition
before use
 Ground disturbance should be
done as per PCI regulation.
 The buried lines and live cable
shall be clearly marked before start
 Use manual handling if required.
 Ensure all the worker competent
and authorize to perform the
activity
 Provide stick for check pipe
available on location.
 Provide portable light (work at
night)
 Medic must standby when work at
night
 Provide Rain Coat
 Install safety sign
 Provide traffic control
3) Penggalian  Excavator terperosok  Gunakan PPE standard  Pastikan excavator berada tidak di
(Helm,Kacamata, coverall, posisi pinggir/tepi tumpukan
 Terkena cangkul dari excavator
sepatu) tanah/galian.
pada lokasi pipa yang sudah ada.
 Patikan posisi excavator stabil
 Terjatuh kedalam galian  Memastikan pekerja jauh dari
 Tertabrak cangkul ketika radius cangkul/swing dari
mengayun, cidera personil excavator
 Tanah longsor  Pastikan pandangan dari operator
tidak tertutup
 Minimnya pencahayan penerangan
 Bekerja dengan penuh konsentrasi
(bekerja malam hari)
 Pastikan excavator beroperasi di
tanah landasan yang keras/padat
 Pastikan area excavator aman dari
pergerakan.
 Sediakan barricade dan rambu
rambu keselamatan .
 Semua certificate peralatan dan
operator harus disediakan.
 Pekerja yang tidak terlibat
diharapkan tidak berada dilokasi
penggalian.
 Pemeriksaan checklist harian
excavator harus dilakukan dan
peralatan aman untuk digunakan.
 Pengecekan kondisi tanah yang
berhubungan dengan jalur proses,
listrik dan instrument dibawah
tanah harus dilakukan.
 Tandai jalur proses dan listrik yang
live didalam tanah dan gunakan
metode manual untuk penggalian.
 Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan penggalian
tanah.
 Gunakan stik/tongkat pengecek
pipa tersedia di lokasi.
 Sediakan lampu portable (saat
malam)
 Medic harus standby saat kerja
 Sediakan jas hujan
 Pasang rambu penggalian
 Sediakan tim pengatur lalu lintas
4) Lowering Pipe to Entrenchment and  Pinch point  Use Standard PPE (Safety  Ensure that excavation has been
Install lifting gears on pipe (Web Sling,  Miscommunication Helm,safety glasses,coverall, prepared for the unloading pipes
Shackle)  Misunderstanding safety shoes)  Adjust the position of excavators
to follow overview of the planning
 Failure
work that will be done.
 The equipment is fallen down  Ensure that no body
(Excavator) passing/working under the object,
 Personnel Injury except if consider necessary by
 Lack of lighting ( work at night ) Lifting Supv. and the number of
personnel shall be as minimum as
possible and lifting gears use
properly
 Control and make sure that
sling(s), or lifting gears required
are installed properly and certified
before lifting the pipeline.
 Control/check and make sure that
part line quantity of lifting
equipment is capable for lifting
object.
 Pre lift the object with gradual
increase.
 Only experienced & qualified /
trained personnel are handling
lifting devices.
 Provide portable light (work at
night)
 Provide Rain Coat
 Install safety sign
 Provide traffic control
 Use radio for communication
between supervisor /foreman and
operator when lowering pipeline.
4) Penurunan Pipa kedalam galian dan  Terjepit  Gunakan PPE standard  Pastikan galian telah siap untuk
pemasangan alat angkat pada pipa (Web  Miskomunikasi (Helm,Kacamata, coverall, aktifitas penurunan pipa.
Sling, Shackle)  Kesalahpahaman sepatu)  Atur posisi excavator mengikuti
gambar perencanaan pekerjaan
 Terjadi kegagalan
yang akan di lakukan.
 Peralartan terperosok (Excavator)  Pastikan tidak ada pekerja lewat /
 Cidera personil bekerja di bawah objek, kecuali
 Minimnya pencahayan penerangan jika dianggap perlu oleh Rigging
(bekerja malam hari) Supv. dan jumlah personil harus
seminimal mungkin dan pastikan
menggunakan dengan benar
peralatan angkat tersebut
 Kontrol dan pastikan bahwa
sling(s) and shackle(s)terpasang
dengan benar dan bersertifikasi
sebelum melakukan penganktan.
 Kontrol dan memastikan bahwa
kuantitas bagian pengangkatan
peralatan yang mampu
 Lakukan pengangkatan objek
dengan bertahap.
 Hanya yang berpengalaman dan
berkualitas/tenaga terlatih yang
dapat menangani peralatan
pengangkatan
 Sediakan lampu portable
 Sediakan jas hujan
 Pasang rambu keselamatan
 Sediakan pengatur lalu lintas
 Gunakan radio komunikasi antara
pengawas dan operator saat
penurunan pipa
5) Back Filling  Excavator swing and collision  Use Standard PPE (Safety  Ensure the excavator position is
Helm,safety glasses,coverall, not at the edge of the soil heap.
 Hit by excavator bucket on existing
safety shoes)  Make sure the position of
pipe on location
excavator is stable
 Fallen down to the excavated hole  Ensure the workers position out of
 Hit by excavator bucket, radius bucket swing
personnel injury  Make sure the operator of view is
 Erosion not blocked
 Working whit full concentration
Lack of lighting ( work at night )
 Endure the excavator is operated
on hard land base
 Ensure that working area is safe
for excavator movement
 Provide signalman to handle
excavator activity
 Provide barricade and warning
board at the working area
 CTR provide certificate for
Operator
 Uninvolved personnel to keep
away from working area
 Daily check the excavator condition
before use
 Ground disturbance should be
done as per PCI regulation.
 The buried lines and live cable
shall be clearly marked before start
 Use manual handling if required.
 Ensure all the worker competent
and authorize to perform the
activity
 Provide ladder and stick for check
pipe available on location.
 Provide portable light (work at
night)
 Install safety sign
 Provide traffic control
5) Pengisian galian kembali  Excavator terperosok  Gunakan PPE standard  Pastikan excavator berada tidak di
(Helm,Kacamata, coverall, posisi pinggir/tepi tumpukan
 Terkena cangkul dari excavator
sepatu) tanah/galian.
pada lokasi pipa yang sudah ada.
 Patikan posisi excavator stabil
 Terjatuh kedalam galian  Memastikan pekerja jauh daru
 Tertabrak cangkul ketika radius cangkul dari excavator
mengayun, cidera personil  Pastikan pandangan dari operator
 Tanah longsor tidak tertutup
 Bekerja dengan penuh konsentrasi
 Minimnya pencahayan penerangan
 Pastikan excavator beroperasi di
(bekerja malam hari)
tanah landasan yang keras/padat
 Pastikan area excavator aman dari
pergerakan.
 Sediakan barricade dan rambu
rambu keselamatan .
 Semua certificate peralatan dan
operator harus disediakan.
 Pekerja yang tidak terlibat
diharapkan tidak berada dilokasi
penggalian.
 Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
 Pengecekan kondisi tanah yang
berhubungan dengan jalur proses,
listrik dan instrument dibawah
tanah harus dilakukan.
 Tandai jalur proses dan listrik yang
live didalam tanah dan gunakan
metode manual untuk penggalian.
 Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan penggalian
tanah.
 Gunakan tangga dan stik/tongkat
pengecek pipa tersedia di lokasi.
 Sediakan lampu portable
 Pasang rambu
 Sediakan pengatur lalu lintas
5) Working at Night  Poor illumination  Use Additional Lamp, Use  Ensure Additional lights are
Standard PPE (Safety Helm,safety available
 Injury person
glasses,coverall, safety shoes), • Ensure availability of drinking
 Tripping water
Enough Rest. Availability Mineral
 Animal attack Water • Ensure replacement of shift
workers for night shifts

5) Pekerjan Pada Malam Hari  Penerangan yang buruk  Gunakan Lampu Tambahan,  Pastikan lampu tambahan tersedia
 Orang yang cedera Gunakan PPE standard  Pastikan ketersediaan air minum
 Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift
 Serangan binatang sepatu), istirahat yang cukup, untuk shift malam
Tersedianya Air Mineral

6) Housekeeping  Bad housekeeping  Use Standard PPE (Safety  Ensure housekeeping implemented
Helm,safety glasses,coverall, before and after working hours.
safety shoes)  All the hazardous waste stored on
location
 Provide trash bin for organic waste
and anorganic waste at location
6) Kebersihan  Housekeeping yang buruk  Gunakan PPE standard  Pastikan housekeeping dilakukan
(Helm,Kacamata, coverall, sebelum dan sesudah jam kerja
sepatu)  Semua limbah B3 dari pengelasan
dikumpulkan dalam tempat
penyimpanan limbah B3.
 Sediakan tempat sampah untuk
sampah organic dan unorganik
Note : - Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
- Do manual excavation near the existing pipeline.
- Good communication between operator and signalman, ensure the operator follow instruction/sign from signalman.
Catatan : - Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.
- Lakukan penggalian manual di dekat jalur pipa existing
- Komunikasi yang baik antara operator excavator dengan signalmen, yankinkan operator mengikuti instruksi/ tanda dari signalman.