Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PP Ds On s4 Hana

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10
At a glance
Powered by AI
The key takeaways are that SAP has consolidated various supply chain planning solutions like APO, IBP, and PP/DS into its S/4HANA product. This has simplified the architecture and reduced costs. However, there are still some differences compared to traditional APO implementations.

SAP introduced the IBP solution in 2014 which integrated traditional systems like EIS, SCIC, DP and SNP. From 2016, planning modules like PP/DS, TM and EWM were embedded into S/4HANA. This consolidated various solutions and simplified the architecture.

Some differences are elimination of master data redundancy, no need for active CIF integration, embedded optimizer support, and tables now start with /sapapo/ prefix. However, some functionality like resource creation is no longer supported in PP/DS transactions.

PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.

com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

PP/DS on S/4 HANA (Advanced Planning) Insights

Venkadesh Seetharaman

Supply chain is the effective way of managing the flow of demand and supply to maximize the customer value and
achieve a sustainable competitive advantage. APICS Dictionary States Supply Chain Management as “the design,
planning, execution, control, and monitoring of supply chain activities with the objective of creating net value,
building a competitive infrastructure, leveraging worldwide logistics, synchronizing supply with demand, and
measuring performance globally.” In recent years, we have seen a drastic change in the way that supply chain system
works with SAP and there are many misconception or assumptions around the Integration of different supply chain
systems like APO, IBP, and CIF Architectures. Below picture depicts how SAP has re-defined its architecture.

1 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

In the Year of 2014, a new system called IBP is invented which works on cloud and traditional systems like SAP EIS,
SAP SCIC, DP, and SNP have moved into IBP throughout the time it has seen drastic changes until its latest release
1811. Similarly, from the Year of 2016, Planning and Warehouse modules like PP/DS, TM, EWM is embedded to S/4
HANA On-Premise system and has seen a drastic change. In this blog we will cover the Architectural, Functional and

2 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

Technical Changes done with Advanced Planning in S/4 HANA.

Introduction to Advanced Planning


“Production Planning is setting the overall level of manufacturing output… and other activities to best satisfy the
current planned level of sales… while meeting general business objectives of profitability, productivity…etc. as
expressed in overall business plan”

APICS Dictionary

SAP PP/DS also known as Production Planning and detailed scheduling is popular in industries wherever it requires
complex manufacturing and scheduling. Until the release of SAP S/4 HANA 1610 Production Planning and Detailed
Scheduling is carried out in a separate supply chain box also known as SAP APO which is integrated to SAP ECC or
S/4 HANA via Core Interface. S/4 HANA on PP/DS has overcome some of the below challenges faced in classic APO-
PP/DS.

Master data Redundancy.


Continuous CIF Monitoring is required to Fix inconsistent data
Huge Impact in Planning, In-case of MRP dependency between APO, ECC, S/4 HANA.

Advanced Planning Architecture


Advanced Planning has seen a significant change when it comes to architecture from SAP S/4 HANA1610 Release and
considerable process improvements have been brought until the latest release SAP S/4 HANA 1809. The below
picture depicts the change in the Architecture in context to Advanced planning.

But CIF is now eliminated for Transactional data transfers, and hence no more active integration model is required
for Transactional data.

3 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

To Size Live cache memory requirements, the HANA version of Quick Sizer can be used in SAP S/4 HANA PP/DS.
And S/4 HANA Embedded Advanced Planning supports Optimizer for complex scheduling. The Optimizer
Installation requires separate Hardware for Installation.

To use Advanced Planning in SAP S/4 HANA, activation is required in the configuration node, this requires a separate
license “Manufacturing for Planning and Scheduling”.

Advanced Planning Integration


S/4 HANA is integrated with different Supply Chain Systems within S/4 HANA and as well as with other Supply chain
SAP Systems. In this Blog, let us see Integrations that are relevant for Advanced Planning and Scheduling.

Advanced Planning and APO Integration with S/4 HANA

To Integrate S/4 HANA with Advanced planning system and as well as APO system the CIF Settings for data transfer

4 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

Logical System, Logical System assignment to Client, Define RFC Destination, RFC Destination Assignment to
various Application Cases, Business System Groups, Assign the Logical System and Queue Type to the Business
System Group still needs to be defined.

The Application Specific Settings and Enhancements can be defined in the below node path for any Application
specific data integration.

For Migrating APO with any of its successor products (S/4 HANA for PP/DS & GATP, IBP for DP and SNP), an
automated approach is not possible as suggested by SAP (Refer Note: 2456834).

Advanced Planning and IBP Integration with S/4 HANA

IBP and Advanced Planning in S/4 HANA can be used together, considering that there is no data dependency.
Similarly, Integration of Orders generated out of IBP to Advanced Planning is not supported.

IBP for Supply and Demand are integrated with S/4 HANA through CPI-DS and IBP for Response is integrated via
SDI.

Innovations in Advanced Planning

5 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

Advanced Planning in SAP S/4 HANA PP/DS has addressed Key challenges faced with SAP APO. Some of the Key
Innovations to mitigate the challenges are listed below.

CIF Simplification for Master and Transactional data.


Planning and Scheduling Applications can utilize on one single HANA Database, Live cache is now the part of

SAP HANA Database.


BI Component of APO available – Functionality of Process Chains.
Integrated Material Requirements Planning and Unified Execution Log in MRP Live.
Single Mass Order Conversion report for both S/4 HANA and APO Relevant materials.
Performance Improvement for Order Publication to PP.
New Fiori APPS Introduced with Enhanced UI (Monitor Capacity Utilization, Production Scheduling Board,
Optimal Orders for Shipment).

Comparison with APO – PP/DS & Advanced Planning & Production Planning
(Integration / Key Benefits)

6 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

7 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

8 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

Things to consider with Advanced Planning


There are few things to consider when using Advanced planning with PP/DS that includes.

When using multiple systems like Embedded EWM, TM, Advanced Planning consideration must be done when
defining Logical Systems.
S/4 HANA Material Master is Key master data now for all embedded Modules, so configuration of MM-view
changes will impact Advanced Planning view.
MRP Type “X0” is not mandatory for Advanced Planning Relevant Materials.
Free Attributes of Product and Location Master of Advanced Planning is not standard unlike APO-PP/DS. An
Enhancement is required to activate New attributes.
All Advanced Planning Transactions and Tables are starting with /sapapo/xxx like APO-PP/DS except few
changes
Resource creation is no longer supported in Advanced Planning transaction.
Forecast is either entered Manually in Advanced Planning or Maintain PIR in MD61 of S/4 HANA
Consideration must be done whether to go with Characteristic Dependent Planning or Variant Configuration,
any change in the later could lead to huge data loss.
Capacity Utilization can be used only for Production Resources.
Automatic creation of Transportation lanes is not supported and must be maintained manually.
Class Types (23/300) will get integrated to Advanced Planning Class Type (230/400) by maintaining an active
integration model for Organizational Area.
A separate activation in the configuration node is required to use Fiori Apps for Advanced Planning (Production
Scheduling Board, Capacity Utilization App, Optimal Order Shipments)
Orders created with Classic MRP (MD01, MD02) are not supported in Fiori apps

S/4 HANA Embedded PP/DS (Advanced Planning) have significantly reduced cost with less administration and
maintenance work, covering all native functionalities of APO – PP/DS though there is a separate licensing involved.
Now it will be beneficial to customers who is not using APO before but looking for PP/DS functionality and for
customer who is already using APO – PP/DS.

Links and References

https://launchpad.support.sap.com/#/notes/2712349– PP/DS cookbook -1809/1709

https://launchpad.support.sap.com/#/notes/2647972– Simplification list:PP/DS on S/4HANA 1809

https://launchpad.support.sap.com/#/notes/2674488– Release Information note:1809

https://launchpad.support.sap.com/#/notes/2666947– Restrictions and Implementation recommendation PP/DS


on S/4 HANA 1809

9 of 10 19-02-2021, 22:36
PP/DS on S/4 HANA (Advanced Planning) Insights | SAP Blogs https://blogs.sap.com/2019/01/17/ppds-on-s4-hana-advanced-planning-insights/

https://launchpad.support.sap.com/#/notes/2674523– Release Information Fiori apps-1809

https://launchpad.support.sap.com/#/notes/2393581– Extensibility features for SCM related Fields-1610

https://launchpad.support.sap.com/#/notes/2456834 – Transition guide for SAP APO

https://www.sap-press.com/production-planning-with-sap-apo_3927/ Production Planning with SAP APO-Jochen


Balla/Frank Layer

https://www.sap-press.com/introducing-production-planning-and-detailed-scheduling-pp-ds-with-sap-
s4hana_4582/

https://blogs.sap.com/2018/02/12/ppds-for-sap-s4hana-advanced-planning-a-powerful-planning-and-scheduling-
tool/

https://www.youtube.com/watch?v=MWP2zvwupoA -SAP S/4 HANA in PP/DS

10 of 10 19-02-2021, 22:36

You might also like