Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Inspection of DTR Structure 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SOUTHERN POWER DISTRIBUTION COMPANY OF A.P.

Limited
Operation Division :: Anantapur

Inspection of Distribution Transformer Structure

Name of the Officer: Designation:


Name of Section: Sub-Division:
Name of Distribution: Structure Code:
Name of 33/11KV SS: 11KV Feeder Name:
Authorised Load: Un-Authorised Load:
Date of erection/
Date of Inspection:
Period in Service
Date of Failures: 1st Failue 2nd Failue 3rd Failue 4th Failue Land Mark:

DTR Particulars: Make Sl.No Capacity Year Whether New Repaired

DTR Load R1 Y1 B1 N1 R2 Y2 B2 N2
in Amps
Time: R3 Y3 B3 N3

Sl.No Inspection Details Normal Defective Remarks

1 DTR Structue Condition Plinth D.P Str.

2 Is DTR Structure height is 8 feet? Height of Str.in feet

3 11KV A.B.Switch Condition Not Available

4 11KV H.G. Fuse Set Condition Not Available

11KV Jumpers Condition from HG


5 Bross Conductor
Fuse Set to H.V bushings
L.T. Side AB Cable from DTR LV to
6 No No.of LT Ckts
Distribution Box Condition
L.T. Distribution Box/Open Fuse
7 Boxes Open fuses
Board (Write Nos. in Check Box)
L.T. Connections Condition from Dist.
8 Cable Open wiring
Box to L.T.Lines

9 Is Distr. Box/Board height is 6 feet? ht of box/board in feet

10 Condition of HV Bushings Oil Leaks: Yes No

11 Condition of LV Bushings Oil Leaks: Yes No

Earth Electrodes Condition


12 Earth Pipes: GI CI
(Write Nos. in Check Box)
No. 8 G.I wire earth connections with
13 No.of Earth Connections
G.I bolts, nuts and washers
Is earth connections given to DTR
14 Body ABS Box
body, AB Switch and Distri. Box?

15 L.T. Poles Condition Leaning Damaged

16 L.T. Lines Condition Loose Spans Damaged

17 Special Remarks
Signature of Inspecting Officer

You might also like