Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

QSV 401 - Measurement of Civil Engineering Works: Course Particulars

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

QSV 401 – Measurement of Civil Engineering Works

COURSE PARTICULARS
Course Code: QSV 401
Course Title: Measurement of Civil Engineering Works
No. of Units: 2
Course Duration: One hour of lecture and one hour of tutorials per week for 15 weeks.
Status: Compulsory
Course Email Address: qsv401@futa.edu.ng
Course Webpage: http://www.qsv.futa.edu.ng/courseschedule.php?coursecode=QSV%20401
Prerequisite: NIL

COURSE INSTRUCTORS
Professor D. R. Ogunsemi
Room 04, 1st Floor, SET Building,
Dept. of Quantity Surveying,
Federal University of Technology, Akure, Nigeria.
Phone: +2348034708799
Email: drogunsemi@futa.edu.ng

and
Mr. O. Adeniyi
Room 15, 1st Floor SET Building Phase II,
Dept. of Quantity Surveying,
Federal University of Technology, Akure, Nigeria
Phone: +2348067117231
Email: oadeniyi@futa.edu.ng

COURSE DESCRIPTION
In order to achieve realistic estimating, computation of quantities need to be accurate. This
course is meant to embed students with the skills of taking off and bill of quantities preparation
for civil engineering works. Students with adequate knowledge of taking-off for building works
are likely to have an edge in the course. Although the course is meant to impart useful skills on
the students with regard to drawing interpretation, taking off and bill of quantities preparation,
additional effort will be made to explain the construction of the civil engineering works for
which taking-off is to be done. This is to ensure better understanding. Among the topics to be
taught are scope of civil engineering works and methods of measurement, measurement of site

1
investigation and site clearance, measurement for excavation and earthworks, embankments and
cuttings, retaining walls, pililng, roads, railway work, bridges and culverts.

COURSE OBJECTIVES
The objectives of this course are to:
 provide students with taking-off skills for civil engineering works; and
 equip students with the basic skills of bill of quantities preparation for civil engineering
works.

COURSE LEARNING OUTCOMES / COMPETENCIES


Upon successful completion of this course, the students will be able to:
(Knowledge based)
 describe the differences between civil engineering works and building works
administration;
 understand how to use BESMM3 for taking off and preparation of bills of quantities for
civil engineering works;
 interprete drawings, take off, and prepare bill of quantities for civil engineering works.
(Skills)
 take off and prepare bill of quantities for:
o Site investigation and site clearance;
o Excavation, dredging and fillings;
o Geotechnical process;
o Earthworks, embankment and cutting;
 take off and prepare bill of quantities for:
o Retaining walls;
o Piling, underpinning, road and railway work, bridges and culvert;
o other small civil works.

GRADING SYSTEM FOR THE COURSE


This course will be graded as follows:
Class Attendance 5%
Assignments 15%
Test(s) 20%
Final Examination 60%
TOTAL 100%

2
GENERAL INSTRUCTIONS
Attendance: It is expected that every student will be in class for lectures and also participate in
all practical/tutorial classes. Attendance records will be kept and used to determine each person’s
qualification to sit for the final examination. In case of illness or other unavoidable cause of
absence, the student must communicate as soon as possible with any of the instructors, indicating
the reason for the absence.

Academic Integrity: Violations of academic integrity, including dishonesty in assignments,


examinations, or other academic performances are prohibited. You are not allowed to make
copies of another person’s work and submit it as your own; that is plagiarism. All cases of
academic dishonesty will be reported to the University Management for appropriate sanctions in
accordance with the guidelines for handling students’ misconduct as spelt out in the Students’
Handbook.
Assignments and Group Work: Students are expected to submit assignments as scheduled.
Failure to submit an assignment as at when due will earn you zero for that assignment. Only
under extenuating circumstances, for which a student has notified any of the instructors in
advance, will late submission of assignments be permitted.

Code of Conduct in Lecture Rooms: Students should turn off their cell phones during lectures or
better still put it in silent mode. Students are prohibited from engaging in other activities (such as
texting, watching videos, chatting, gisting etc.) during lectures. Food and drinks are not
permitted during lectures except otherwise approved by the tutor.

READING LIST
4
Seeley, I. H. And Murray G. P. (2001). Civil Engineering Quantities. Palgrave, New York.
4, 2, 1
Nigerian Institute of Quantity Surveyors (2008). Building and Engineering Standard
Method of Measurement. NIQS, Nigeria.
3
Reynolds G. J. (1980). Measurement of Civil Engineering Works, Granada, USA, digitized
2008

Legend
1- Available in the University Library
2- Available in Departmental/School Libraries
3- Available on the Internet.
4- Available as Personal Collection
5- Available in local bookshops.

3
COURSE OUTLINE
Week Topic Remarks
1&2 The scope of civil engineering works and method of Expectations of students from the
measurement. course will be documented.
 Review of works involved
 Contract documents
 Daywork schedule
 Method Related Charges
o Definition and general explanations
o Advantages and Disadvantages
o Reasons for introduction
o Practical application

 The use of Building and Engineering Standard Relevant/related sections of the two
3 Method of Measurement 3(BESMM3) and standard methods of measurement
Civil Engineering Standard Method of will be compared.
Measurement for the taking off and bill of
quantities preparation for civil engineering Meaning of Bill of Engineering
works. Measurement and Evaluation
 Measurement of Site investigation and site (BEME) and its relationship with
clearance Bill of Quantities (BOQ) will be
discussed

Measurement for a number of site


investigation methods will be done.

 Excavation, dredging, fillings geotechnical


4 process.

5&6  Earthworks, embankments and cuttings. Both open earthworks and


backfilled excavations will be
considered.

The following methods of


quantities computation will be
considered: Average end area,
prismoidal, simpson’s rule, 1234 (
grid average) method. The use of
computer programmes and mass
diagram will also be discussed.

4
7&8  Earthworks, embankments and cuttings Assignment will be given
(continued)

MID-SEMESTER TEST
9  Retaining wall Quick review of the construction
process will be done.

Process of Bill of Quantities (BOQ)


preparation will be revisited and
some peculiarities of civil works
BOQ will be highlighted.

10 Railway works

11 & 12  Piling Students will be divided into


 Underpining groups; they will be expected to
look for a civil engineering work
drawing, bring it to the instructor
for approval and prapare a standard
bill of quantities for it.

13 & 14  Road works


 Bridges and Culverts Quick review of works done so far
in the semester will be done, in
preparation for the main revision
class (week 15)

15 REVISION This is the week preceding the final


examination. At this time,
evaluation will be done to assess
how far the students’ expectations
for the course have been met. All
outstanding clarifications in respect
of previously taught topics will be
done.

You might also like