This document is a budget plan (Rencana Anggaran Biaya or RAB) for the Bhanuswari Resort & Spa in Gianyar, Bali. The RAB outlines the estimated costs for various elements of the resort development which include:
1) Construction of villa blocks and public facilities such as pools, restaurants, and recreational areas totaling over Rp352 billion
2) Renovation of 12 existing Bhanuswari villas for Rp42 billion
3) A Rp20 billion upgrade of the entire Bhanuswari resort property
4) Rp27.8 billion in general and administrative costs including legal licenses, utilities, vehicles
This document is a budget plan (Rencana Anggaran Biaya or RAB) for the Bhanuswari Resort & Spa in Gianyar, Bali. The RAB outlines the estimated costs for various elements of the resort development which include:
1) Construction of villa blocks and public facilities such as pools, restaurants, and recreational areas totaling over Rp352 billion
2) Renovation of 12 existing Bhanuswari villas for Rp42 billion
3) A Rp20 billion upgrade of the entire Bhanuswari resort property
4) Rp27.8 billion in general and administrative costs including legal licenses, utilities, vehicles
This document is a budget plan (Rencana Anggaran Biaya or RAB) for the Bhanuswari Resort & Spa in Gianyar, Bali. The RAB outlines the estimated costs for various elements of the resort development which include:
1) Construction of villa blocks and public facilities such as pools, restaurants, and recreational areas totaling over Rp352 billion
2) Renovation of 12 existing Bhanuswari villas for Rp42 billion
3) A Rp20 billion upgrade of the entire Bhanuswari resort property
4) Rp27.8 billion in general and administrative costs including legal licenses, utilities, vehicles
This document is a budget plan (Rencana Anggaran Biaya or RAB) for the Bhanuswari Resort & Spa in Gianyar, Bali. The RAB outlines the estimated costs for various elements of the resort development which include:
1) Construction of villa blocks and public facilities such as pools, restaurants, and recreational areas totaling over Rp352 billion
2) Renovation of 12 existing Bhanuswari villas for Rp42 billion
3) A Rp20 billion upgrade of the entire Bhanuswari resort property
4) Rp27.8 billion in general and administrative costs including legal licenses, utilities, vehicles
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1of 2
RINGKASAN
RENCANA ANGGARAN BIAYA (RAB)
BHANUSWARI RESORT & SPA - GIANYAR BALI NO DESCRIPTION UNIT UNIT PRICE GRAND TOTAL ITEM A VILLAS BLOCK 20-1 20 UNIT 903,156,195 18,063,123,900 BLOCK 20-2 20 UNIT 903,156,195 18,063,123,900 BLOCK 10 10 UNIT 903,156,195 9,031,561,950 BLOCK BANQUET 1 UNIT 13,347,000,000 13,347,000,000 ONE BADROOM VILLA 10 UNIT 2,249,796,669 22,497,966,690 TWO BEDROOM VILLA C2 3 UNIT 3,373,307,502 10,119,922,506 TWO BEDROOM VILLA C2B 1 UNIT 3,675,191,006 3,675,191,006 THREE BEDROOM VILLA 1 UNIT 5,465,038,915 5,465,038,915 B PUBLIC FACILITIES : - TAMAN SARI ART & CULTURE 1 UNIT 12,684,931,680 12,684,931,680 SOFTCASE TAMAN SARI 1 UNIT 1,578,548,100 1,578,548,100 Tennis Court 3 UNIT 1,250,000,000 3,750,000,000 SPA TREATMENT PAVILION 2 UNIT 5,000,000,000 10,000,000,000 HARDSCAPE + LIGHTING 1 UNIT 638,846,000 638,846,000 POOL BAR & RESTO 1 UNIT 3,180,367,340 3,180,367,340 RIVER POOL 1 UNIT 4,207,131,944 4,207,131,944 LAGOON POOL 1 UNIT 6,385,999,500 6,385,999,500 KIDS POOL 1 UNIT 2,974,047,600 2,974,047,600 POOL BLOCK SUITE 1 UNIT 7,366,069,800 7,366,069,800 BRIDGE HOUSE 2 UNIT 1,108,158,800 2,216,317,600 LOVER ISLAND 1 UNIT 14,589,471,450 14,589,471,450 Lobby RESTAURANT 1 UNIT 14,511,360,000 14,511,360,000 BOH AT SUITES 1 UNIT 20,464,613,646 20,464,613,646 LAND SCAPE 1 UNIT 11,130,241,500 11,130,241,500 SPORT CENTER 2 UNIT 3,500,000,000 7,000,000,000 OPEN STAGE 1 UNIT 3,400,000,000 3,400,000,000 MEETING ROOM 1 UNIT 10,000,000,000 10,000,000,000 PEDESTRIAN STAGE 1 UNIT 8,000,000,000 8,000,000,000 10. Main Gate 1 UNIT 2,500,000,000 2,500,000,000 11. Lobby RESTAURANT 1 UNIT 11,511,360,000 11,511,360,000 12. Pura, Mosque, Mushalah 1 UNIT 2,500,000,000 2,500,000,000 C Bhanuswari Villa Renovation 12 UNIT 3,500,000,000 42,000,000,000 D Bhanuswari Class Upgrading 1 UNIT 20,000,000,000 20,000,000,000 E GENERAL & ADMINISTRATIVES : 1. Legal & Operational Licences 1 LS 3,500,000,000 3,500,000,000 2. Power & Electricity 1 UNIT 2,500,000,000 2,500,000,000 3. Buggy Car 6 UNIT 350,000,000 2,100,000,000 4. Vehicles 4 UNIT 300,000,000 1,200,000,000 5. Working Capital 2 MONTH 10,000,000,000 20,000,000,000 (352,152,235,027)