Midterm Exam 51047: Industrial Waste Management & Control
Midterm Exam 51047: Industrial Waste Management & Control
Midterm Exam 51047: Industrial Waste Management & Control
MIDTERM EXAM
51047
Submitted by:
Diana Louise E. Arceo
201511280
Submitted to:
Engr. Aladino M. Abulencia
Instructor
Chemical Engineering Department
School Year 2019 - 2020
3
A wastewater treatment plant will receive a flow of 170 m /day with a raw wastewater BOD 5 of
278 and a BOD3 of 258. Treatment removes 91% of the BOD. The flow rate of the return sludge
and the wasted sludge are 5% and 0.05%, respectively of the Influent flow rate. Design the
3
volume (m ) required to run the plant as a "high rate" facility (F/M = 0.3 kg BOD/kg MLSSday).
The aeration basin MLSS concentration will be maintained at 1700 with 25% increase in the
wasted sludge. Design the volume of air required per day and the horsepower requirement of
the blower for the diffuser (the number depends on your design) with the piping of 8 inches in
diameter and a length of 1200 feet. The blower is at 1 atm and 30-degree C.
From Primary
Purifier Tank INFLUENT SECOND EFFLUENT
AERATION CLARIFIER
TANK TANK
Qo BOD5= SC= 267(1-0.88) =
XO 34.71 mg/L
Q = 140 m3/day
So
BOD5=S=267
= 0.3 kg BOD / kgMLSS day
MLSS = 2850 mg/L
3 3
QR = 140(0.05) =7 m /day QW = 140(0.0005) =0.07 m /day
SR=34.71 mg/L XW=1.25(2850)=3562.5 mg/L
SW=34.71 mg/L
Required:
Volume of Aeration tank = Vr
Volume of Air required = Q
Blower Power = Pb
Solution:
3
QO = 140 + 7 = 147 m /day
BOD Balance:
(140)(267) + (7)(34.71) = 147( )
Aeration Volume:
= ∙
255.9386 ∙ 147
= 0.3 ∙ =
2850 ∙
3
VR= 44.0035m
3
44.0035
2
= = 22.0018
2
Let:
Height = 2m
Length = 1.5width
Width = W
22.0018=W(1.5W)
Width = 3.8m ~ 4m
L=1.5(4) = 6m
6m
2m
4m
O2 Required:
0 −
2= ( )−1.42
=
=
5 (1− −5 )
3
−5
(1 − −3 )
267 (1 − )
= −3
247 (1 − )
= 0.7940
=1− −5(0.7940)
= 0.9811
3 3
255.9386 − 34.71
= 147 ( ) − 1.42(0.07 )(3562.5
0.9811
3
− 1000 1
2= 32792.9716 ( )( )
3
− 1 1000000
1000 1
2= 32.7930 ( )( )
1 32
2= 1024.7804
−
1024.7804 (0.08206 ) (30 + 273.15)
−
= = = 25492.9374
1
= = . =121.3949
.
3
1 1ℎ 3.28 3
=121.3949 ( )( )(
)
24 ℎ 60 1
Chemical Engineering Department
School Year 2019 - 2020
3
= 2.9748
Velocity of Air: 3
1
2.97 ( )
= 60
2 2 2
( )
4 12
=2.2689
Where:
hp = brake horsepower at blower shaft
3
Q = blower inlet volumetric flowrate, ft /min
Pi = blower inlet pressure, psia
n = blower efficiency
X = adiabatic factor = ( ) 0.283 − 1
Air Piping:
0.3048
3
(0.0508 )( 1 )(2.2689 )(1.166 )
=
0.06352 10 − 3 / −
= 644.8847
= 16
Chemical Engineering Department
School Year 2019 - 2020
16
= 644.8847 = 0.0248
, ℎ = ( )ℎ
Where:
ℎ=( )2
1.096
2.2689 2.2 1
ℎ=( ) (1.166 )( )( )3
3
1.096 3.28
14.7
ℎ = 0.3116 20 ( )( )
12 33.9 20
ℎ = 0.0113psia
12
1200 ( )
,ℎ = 0.0248 ( ) . 0113psia
,ℎ = 2.0178
Total Hydraulic Pressure = ( ℎ)( . )+ℎ
Total Hydraulic Pressure = (1000 3) (9.81 2) (2 )(96) (10132514.7 ) + 2.0178
0.283
3 275.2746
(14.7 ) −1
0.01524(2.9748 ) ( )
ℎ =
14.7
= 1.23hp
0.7