Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
100% found this document useful (1 vote)
639 views4 pages

ABTS-II - 10 - Onkar Khaire - Auditorium Drawing

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 4

DOWN

F FIRE
EXIT
UP
1.35 M

FIRE EXIT
M LOBBY
WOMEN'S
TOILET
EXIT A.H.U EXIT 1.35 M

FOYER
1.35 M

M
EXIT

GREEN
ROOM

TICKET
CENTRE
ENTRANCE
BACKSTAGE STAGE PROSCENIUM FOYER ENT RY UP
-1.2 M -1.2 M -2.1 M 1.35 M 1.35 M 0.00 M
CONTROL
ROOM
A A'
TICKET
CENTRE

GREEN
ROOM

EXIT
F

FOYER
1.35 M

EXIT STORAGE EXIT MEN'S


TOILET
1.35 M

M
FIRE EXIT
LOBBY

F FIRE UP
1.35 M

EXIT
DOWN

GROUND FLOOR PLAN (scale 1:100)

CHECK V.P.S.O.A.BARAMATI STAMP


ONKAR ANIL KHAIRE
AUDITORIUM PLANS 4TH YR B.ARCH.2020-21
ROLL NO : 10
SUB : ABTS-II
WOMEN'S
TOILET
5.85 M

FOY ER
5.85 M

STAGE

PROSCENIUM PROJECTION
BALCONY ROOM
A 4.8M
5.85 M
A'

FOYER
5.85 M

MEN'S
TOILET
5.85 M

FIRST FLOOR PLAN (scale 1:100)

CHECK V.P.S.O.A.BARAMATI STAMP


ONKAR ANIL KHAIRE
AUDITORIUM PLANS 4TH YR B.ARCH.2020-21
ROLL NO : 10
SUB : ABTS-II
FLY GALLERY

FLY GALLERY

PROJECTION
ROOM
5.85 M

ENTRANCE
FOYER
CONTROL
ROOM
BACK STAGE ENTRANCE
-1.2 M 1.35 M 1.35 M 1.35 M

0.00 M

STAGE
-1.2 M

PROSCENIUM
-2.1 M

SECTION AT : AA' (scale 1:100)

HANGERS

9 MM CARPET
25 MM STONE TILE

25 MM SCREEDING
AIR GAP
WIRE MESH TO HOLD
THE RESILIENT MATERIAL
TUNGSTEN
HALOGEN LIGHT GLASS WOOL
WIRE MESH CONCRETE FLOOR SLAB
GLASS WOOL PLYWOOD
BRK. WALL
PERFORATED FIBRE
CEILING DETAIL
ACOUSTICAL
BOARD THICK FIBROUS MATERIAL
PLASTER
12MM THK
PLYWOOD CASING DETAIL OF FLOORING

DETAIL PLAN OF SIDE PANELS

THICK CARPET
ABSORPTIVE PANEL
FOAM RUBBER
SCALE 1:10
R.C.C. SLAB

STAIR DETAIL WOOD WOOL BOARD


M.S. HANGER
TUNGSTEN HALOGEN LIGHT
230 BRICK WALL
PLYWOOD CASING
AIR GAP 50 X 50 TW FRAMEWORK
WIRE MESH
T.W. BOARDING
T.W. FRAME 20 MM THK STIFFENER
GLASS WOOL
P.C.C. SLAB
PERFORATED FIBRE BOARD
PLYWOOD DIFFUSIVE WALL
REFLECTOR SCALE 1 : 10
STAGE DETAIL
REFLECTED CEILING PLAN

CHECK V.P.S.O.A.BARAMATI STAMP


ONKAR ANIL KHAIRE
SECTION AND DETAILS 4TH YR B.ARCH.2020-21
ROLL NO : 10
SUB : ABTS-II
TO FIRE HYDRENT

DIESEL PUMP

U.G.T.

DOWN
FIRE TANK TO SPRINKLER SYSTEM

F FIRE
ELECTRICITY PUMP
F EXIT
UP
1.35 M

FIRE EXIT
M
M LOBBY
WOMEN'S
TOILET
EXIT A.H.U EXIT 1.35 M

FOYER
1.35 M

M
EXIT

GREEN
ROOM

TICKET
CENTRE
ENTRANCE
BACKSTAGE STAGE PROSCENIUM FOYER ENT RY UP
-1.2 M -1.2 M -2.1 M 1.35 M 1.35 M 0.00 M
CONTROL
ROOM

TICKET
CENTRE

GREEN
ROOM

EXIT
F

FOYER
1.35 M

EXIT STORAGE EXIT MEN'S


TOILET
1.35 M

M
FIRE EXIT
LOBBY

F FIRE UP
1.35 M

EXIT
DOWN
G.I. PIPE

SPRINKLERS

PUMP

HYDRENT

FIRE FIGHTING PLAN (scale 1:100)

CHECK V.P.S.O.A.BARAMATI STAMP


ONKAR ANIL KHAIRE
AUDITORIUM PLANS 4TH YR B.ARCH.2020-21
ROLL NO : 10
SUB : ABTS-II

You might also like