Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
26 views4 pages

Regression Statistics

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 4

12.1.

8
The pull strength of a wire bond is an important characteristic. The table below gives
information on pull strength Y, die height X_1, post height X_2, loop height X_3, wire
length X_4, bond width on the die X_5, and bond width on the post X_6. Fit a model to
these data using stepwise regression and explain each step you take to get to the
completed model. Use alpha =.05.
 
Y X1 X2 X3 X4 X5 X6
8 5.2 19.6 29.6 94.9 2.1 2.3
8.3 5.2 19.8 32.4 89.7 2.1 1.8
8.5 5.8 19.6 31 96.2 2 2
8.8 6.4 19.4 32.4 95.6 2.2 2.1
9 5.8 18.6 28.6 86.5 2 1.8
9.3 5.2 18.8 30.6 84.5 2.1 2.1
9.3 5.6 20.4 32.4 88.8 2.2 1.9
9.5 6 19 32.6 85.7 2.1 1.9
9.8 5.2 20.8 32.2 93.6 2.3 2.1
10 5.8 19.9 31.8 86 2.3 1.8
10.3 6.4 18 32.6 87.1 2 1.6
10.5 6 20.6 33.4 93.1 2.1 2.1
10.8 6.2 20.2 31.8 83.4 2.2 2.1
11 6.2 20.2 32.4 94.5 2.1 1.9
11.3 6.2 19.2 31.4 83.4 1.9 1.8
11.5 5.6 17 33.2 85.2 2.1 2.1
11.8 6 19.8 35.4 84.1 2 1.8
12.3 5.8 18.8 34 86.9 2.1 1.8
12.5 5.6 18.6 34.2 83 1.9 2
 
Copy the data in excel. Then go to data analysis and select Regression.

Select the Dependent and independent variables for confidence level of 95%

We then get the following output

SUMMARY OUTPUT              
                 
Regression Statistics              
Multiple R 0.840283              
R Square 0.706076              
Adjusted R
0.559114              
Square
Standard
0.902056              
Error
Observation
19              
s
                 
ANOVA                
Significance
df SS MS F      
  F
Regression 6 23.4566 3.909433 4.804487 0.010126743      
Residual 12 9.764455 0.813705          
Total 18 33.22105            
                 
Coefficient Standard Upper Lower Upper
t Stat P-value Lower 95%
  s Error 95% 95.0% 95.0%
Intercept 3.086299 8.237652 0.374658 0.714452 -14.8620035321.0346 -14.862 21.0346
X1 0.648169 0.594661 1.08998 0.297126 -0.6474868421.943825 -0.64749 1.943825
X2 -0.01093 0.275093 -0.03975 0.968948 -0.6103103650.588442 -0.61031 0.588442
X3 0.493873 0.143054 3.452359 0.004784 0.182185664 0.805561 0.182186 0.805561
X4 -0.12526 0.056171 -2.22994 0.045616 -0.247642328-0.00287 -0.24764 -0.00287
X5 -1.8203 2.222536 -0.81902 0.42874 -6.6627928783.022185 -6.66279 3.022185
X6 1.28012 1.485879 0.861524 0.405836 -1.9573313764.517572 -1.95733 4.517572
The overall model is significant since the significance value is < 0.05 = 0.0101

Of the 6 independent variables only X3 and X4 are significant since their p values are
<0.05 (0.004 and 0.045 respectively)
The R square is 70.6% while the adjusted R Square is 56%
The variables loop height X_3 and wire length X_4 only have a significant effect on the
Dependent variable Y
USE THE MODLE TO PREDICT THE PULL STRENGTH AT THE 7th DATA POINT?
WHAT IS THE RESIDUAL 1 FOR THIS POINT?
Note: Select the residuals in the window,
You can easily get the required residual output.

You might also like