Method Study
Work Measurement
Work Sampling
Work Content
Time Study
Time study is a work measurement technique for recording the times
of performing a certain specific job or its elements carried out under
specified conditions, and for analysing the data so as to obtain the
time necessary for an operator to carry it out at a defined rate of
performance.
Qualified Worker
A qualified worker is one who has acquired the skill, knowledge and
other attributes to carry out the work in hand to satisfactory standards
of quantity, quality and safety.
Element
Work Cycle
Rating
Standard Performance
Standard performance is the rate of output which qualified workers will
naturally achieve without over-exertion as an average over the
working day or shift, provided that they know and adhere to the
specified method and provided that they are motivated to apply
themselves to their work.
Basic Time
Basic time is the time for carrying out an element of work at standard
rating, i.e.
(Observed time x observed rating)/ Standard rating
Selected Time
Relaxation Allowance
Predetermined Time
Work Specifications
For example,
1. If total manpower is 1000 and total available machine is 500.
Then Man:Machine = 1000:500 = 2:1
2. If total manpower is 800 and total available machine is 500. Then
Man:Machine = 800:500 = 1.6:1
How calculate department wise ratio?
Instead of whole factory manpower, one can measure MMR only for
sewing department. In this case, include only those employees who
work under sewing section. Like, operators, helpers, pressmen,
feeder, line checker, table checkers, line supervisors, work study
boys, maintenance personnel, production writer, floor incharge etc.
Assume that total manpower in sewing floor is 630. So man to
machine ratio for sewing floor will be = 630:500 = 1.26:1
Sum of (D1:D2:D3:D4....:D10) = 2
D1=2*630/1000=1.26
D2=2*30/1000=0.06
...
D5 =2*100/1000=0.2
D10=2*10/1000=0.02
OCS's Answer:
Factories those measure this ratio and use to control cost have a
benchmark man to machine ratio. When MMR increases in a
particular month, factory checks where manpower increases.
Manpower may increase in sewing floor such as maker man,
pressman and helpers or number of staffs. Department head need to
confirm if that additional manpower is required permanently or
requirement is style base. According to that new MMR is updated.
Step 1: Select one operation for which you want to calculate SAM.
Note all movements used by the operator in doing one complete cycle
of work. See carefully again and recheck your note if all
movement/motion are captured and correct. (for example, motions are
like - pick up parts one hand or two hands, align part on table or
machine foot, realign plies, etc.)
Step 3: List down all motion sequentially. Refer the synthetic data for
TMU (Time measuring unit) values. For synthetic data, you can refer
GSD (without license use of GSD code prohibited but for personal use
and study one can refer GSD code and TMU values) or Sewing
Performance Data table (SPD).
Now you got TMU value for one operation (for example say it is 400
TMU). Convert total TMU into minutes (1 TMU=0.0006 minute). This is
called as Basic Time in minutes. In this example, it is 0.24 minutes.
Step 1: Select one operation for which you want to calculate SAM.
In all work study books there is only a reference to Standard Time. SMV and SAM are neither
defined nor mentioned. In American published books SAM is mentioned, while in European
published books SMV is mentioned. Similarly, factories in Asia which are under the influence of
European consultants use the term SMV, while factories in South America which are under the
influence of American consultants use the term SAM.
When SAM is used as an extension to SMV, i.e. it is the allocated time for a task rather than the
measured time. SAM is SMV plus policy allowances, if any. It is worth mentioning that these
calculations are from experienced experts and consultants and not from any text book.
While in earlier schools of thoughts, units for both are in minutes, the third school of thought (but
not really used in garment industry) talks about completely different things. Standard Allowed
Minutes means time (in minutes) that is assigned to a specific operation after doing time study or
using PMTS. While Standard Minute Value means the Cost Factor (in cost/minute) that is
multiplied with SAM to get the cost of the operation.”
Cutting SAM can be determined in the same way as you calculate
stitching SAM of a garment. In cutting SAM calculation, consider
cutting room sub-processes such as spreading, marking, cutting,
fusing, re-laying, re-cutting, sorting, numbering and bundling as
operations. Whether you like to determine only cutting SAM or all
other processes also will depend on you. I have explained procedures
for finding SAM for all cutting processes.
Spreading SAM
Conduct time study and measure cycle time for fabric spreading.
Convert cycle time into standard time. Spreading time will vary
depending on layer length (and/or number of markers) and type of
fabric. To be specific record spreading SAM based on lay length and
fabric type. Also record number layer-man involved in layering. Once
you have standard minutes for spreading of a layer, you can easily
calculate total time required for spreading a lay by multiplying number
of layers in a lay. Refer to the following table to record spreading
SAM.
Cutting SAM
Conduct time study for cutting operation. Total cutting time of a lay will
depends on garment components, linear length to be cut for garment
patterns, marker size and type of fabric. Cutting time also depends on
cutting equipments. Record time study data in the following table.
Study cutting time for all sizes in a lay and find average SAM. Cover
all sizes in time study. Create database of cutting SAM with different
combination of cutting for future use.
Re-cutting SAM
Re-cutting is also done by other equipment such as hand scissors or
band knife machine than straight knife cutting machine. Follow same
procedures of determining cutting SAM for re-cutting SAM. For re-
cutting process SAM can be presented per lay or per garment. Also
consider whether all components need to re-cut or only few
components.
For the other cutting room processes like, Sorting, ticketing and
bundling determine SAM as per unit as mentioned in the following
table.
Initially you need to collect standard time for all cuts to create a
database. Once you have created a database with different
combination of lay length, marker size, garment sizes you can use
SAM from your database for future styles.
Buyer expect to receive full quantity from supplier that has been
ordered. This is most important factor that buyer uses for vendor
evaluation. This indicator is calculated as = Total order quality/ Total
shipped quantity. Target of Order to Ship ratio is always 1. It is good if
factory can ship higher than order quantity (only if buyer accepts extra
quantity).
5. On time Delivery:
How much shipment did not meet target shipment date is analyzed at
the end of each month? Target on time delivery of each style is to
meet shipment delivery date. If not meet reasons of not meeting
delivery date are analyzed. It is calculate as = Total orders shipped on
time/Total orders shipped on the month. For example, if factory
shipped 18 styles on time out of total 20 styles shipped in month then
On time delivery of that month is =18/20*100% = 90%
Time gap between previous style over (last piece out from the line)
and first piece output of the current style is known as style change
over time. Shorter changeover time is considered as better
performance level. It varies style to style and production systems.
Time of Change over time of each style is recorded and average
changeover time of the factory is measured.
8. Quality to Production:
Down time is one of the top most reasons for less factory efficiency.
Factory analyses major down times to control and improve machine
and operator utilization. Top 5 reasons for down time (also known as
non-productive time, Off-standard time) are line setting, operation
sitting idle, no feeding, machine breakdown and no planning for line.
Ask yourself.
Normally managers just look into key figures. Even if they want read
all reports they can’t do that because it would consume lot of time.
Instead of reports they would prefer to call you and ask for reasons
when they find any issue in the report.
So, why you are wasting your time making long reports and wasting
papers for printing those long reports daily morning?
In this post, I will show you how to make your production reports
effective as well as more interesting. You can make a short report
using one of the following methods -
Instead of printing multiple reports make one dashboard and send the
dashboard via e-mail. Such keyboard displays everything that need to
be communicated.
KPI Dashboard
(Click on the image to enlarge)
On the above dashboard I have included 6 graphs. From these graphs
you can check status and factory performance.
I have made one template for data entry and graphs on excel sheet.
Collected data required for following reports and entered into the
template.
Once data entered, I get all graphs on the excel template. Graphs are
then copied in a Power point slide. My dashboard is ready.
Similar ways you can create graphs for your key reports. Take screen
shot of the graphs. Prepare one power point slide show (pps format).
Or you can show graphs on the spread sheet (excel sheet) in a
separate worksheet. Spread sheet is a better option as you have all
information the same location/file. When someone needs to see
reports in details can open tables for respective reports.
How we can increase the efficiency in piece rate basis factory? ...
asked by Shaila
Once you improve operator’s sewing skills you will see improvement
in line efficiency. If you don't know how to train sewing skills to your
operators you can hire an expert.
Here I would like to share Paul’s story on skill improvement for low
performing experienced operators. This story will explain you that
through training you can bring lot of improvement operators earning
and line performance.
In that factory most of sewing operators were working for many years.
So they were experienced to their job. Operators were paid based on
number of pieces they were producing. The factory was running piece
rate system.
All experienced operators who earlier ignored for skill training, met
Paul and requested him to send the young trainer to train them better
skills so that they can also earn more money.”
To produce more pieces, operators must have feeding full time so that
they can continuously run their machine. In piece rate factory you may
have unbalanced WIP. Work on improving line balancing to improve
line efficiency. Read my earlier post on line balancing - How to
Balance a Traditional Sewing line?
In the following Figure, production per hour of two lines has been
shown. Following Line chart indicates that Line B is better balanced
than Line A.
Table-2: Filled format
Step 5: In this step you will learn how select an operator from skill
inventory and allocate them for the operation one by one. All
calculations are done for one hour.
In the above sheet (Table -2) for the 1st operation (Mark Neck trim
and run stitch) operator Radha has been selected as her efficiency is
highest (81%) among 3 operators can perform this task. Based on her
past experience (skill inventory) she can produce 88 pieces per hour.
So she can meet the hourly production target and her spare time is
0.04 hour in an hour. With this much spare time we don’t give her any
other job.
For the second operation (Join shoulders) operator Seema has been
selected. Her potential efficiency to the job is 93% and she can make
124 pieces per hour. But we need only 85 pieces to maintain
continuous feeding flow in the line. To make 85 pieces Seema needs
to spend only 0.69 hour. Balance 0.31 hour can be allocated for other
operation that can performed 4TOL machine. Her excess capacity will
be used later where it is needed.
Similar ways calculate and fill details for 3rd, 4th 5th and 6th
operations. Anil who is allocated for operation “serge margin” has
spare time of 0.45 hours and Nirmal who has been allocated for
operation “Top stitch on neck seam” has spare time of 0.36 hours.
For the 7th operation ‘Attach Sleeve’ we will utilize Anil’s spare time
(0.45 hour) as he is working on similar type of machine (4TOL). At
77% efficiency Anil can produce 59 pieces if works for full hours (out
of 85 pieces). In his spare time he can only produce 27 pieces.
Balance quantity 58 pieces (85 – 27) need to be made by another
operator. Here, Sunita (4TOL operator) is selected to make balance
quantity. In an hour she can make 62 pieces (short fall was 58
pieces). Thus Anil and Sunita’s combined output meets hourly target.
Roma, who is given operation “Sew side seam with labels”, can make
66 pieces in an hour. Balance 19 pieces will to be given to another
operator. Seema, who is doing an operation ‘Join shoulder”, has spare
time of 0.31 hours. As she is working similar machine type (4TOL),
Roma’s work is shared with Seema. At 90% efficiency Seema can
make 64 pieces and in her spare time (0.31 hour) she can make 20
pieces. Combined output of Roma and Seema meets the hourly
production target.
Similar ways 9th operation “Sleeve hem” allocated to Komal and his
excess work has been shared with Nirmal. As Nirmal has spare time
of 0.36 hours.
The last operation has been allocated to Sivani, who can produce 91
pieces in one hour.
Tools required:
i) Stop watch
ii) Spread sheet or Calculator
Step 2: Target setting: With the above capacity data set your target
output per hour from one line. Generally it is calculated using following
formula (Target per hour= Total no of operators X 60 /garment SAM).
Check current hourly operator production report. Draw a straight line
with target output data on the line graph.
As you did not specifically ask which one you need, I am explaining
both.
An example:
Assume that total actual salary of a typical line is INR 6000.00, the line
made 400 pieces and garment SAM 22 minutes.
Therefore,
Cost per minute of the line = (6000 / (400 * 22)) = Re. 0.68
If you are new to calculate garment SAM, read this post “How to
calculate SAM of a Garment Operation”
2. Operator Efficiency%
Operator efficiency (On-standard) in percentage = (Total SAH Earned
X 100 / Total hours worked)
= 0.78 X 1750X100 / (60 X 12) = 22.75 X100 / 12 = 189.58%
3. Operator Earnings
Operator earning depends as per operator employment category. If
operator is a piece rate operator than he will earn based on SAH
earning i.e. R 7.50 X 22.75 = R 170.62
Case Study:
Product SAM = 23 minutes (Ladies blouse)
Hourly cost per operator = INR 24.00 approx (Operators monthly
salary 5000.00 INR)
Present output (on day 4 of line loading) = 300 pieces
45 operators work 11 hours day in producing those pieces.
So, present labor cost per piece = (Total cost of operators/number of
pieces produced) = (40*24*11)/300 INR = 35.64 INR. It seems fine.
According the standard minutes (SAM value of the garment), if line
performs at 100% efficiency then it would cost factory = (24*23/60) =
9.20 INR per pieces [cost per hour *SAM/60].
If you have good team of industrial engineers, they can work on the
above to meet your target (lowering the production cost). Otherwise
you can seek for professional help. Now-a-days you will find many
freelancers who can help you saving more money at your factory day
by day.
Industrial Engineers normally calculate direct labor cost (sewing) of
the product. Labor cost per unit directly related on the line efficiency
(performance). When line efficiency increases, production of the line
increases. See the graph on bottom right. So, the cost per garment
goes down when line efficiency increases.
Suppose efficiency increased upto 60%, at this efficiency level line will
make double garments i.e. 600 pieces per day. In this case operator's
daily salary remains same. So per garment labor cost now become =
USD (30*5/600) = USD 0.125
Add formula to the cells for auto calculation when you feed SMVs. Formula for each column has
been given in the following steps. Cells highlighted with grey colors are set with formula. A
basic operation bulletin contains following information.
Calculated Machine number = (SMV @ target efficiency * Daily production target/Total minutes
in a shift day)
You can also use pitch time for the calculation of calculated machine no. Formula:
All operations are studied by GSD expert for motion analysis. At the
same time all operations are videoed for future reference. Calculated
SAM of the operations for a Formal Shirt has been shown in the
following table. This has been defined by a GSD practitioner of a large
size Indian garment export company using GSD software.
Introduction:
To profitably run a garment production factory an effective operator
training system is essential; however many companies either have no
facility or one that is not fit for purpose to meet the demands of the
modern industry. Training can take two separate identities, the giving
of skills and knowledge to new recruits and the upgrading of the
abilities of existing workers.
High labour turnover in the first few days of training is often reported
but is something that can be actively attacked and reduced. It is a
symptom of poor selection, ineffective initial training or a combination
of both. Pre employment tests such as dexterity and eyesight are
essential but must be allied to structured trainability assessment. The
ability to absorb, remember and act upon information is crucial if
training is to be worthwhile but unfortunately not all applicants will
have these qualities. Not everyone can be trained to become a sewing
industry operator? Thirty minutes spent assessing a potential recruit
will save wasted time, effort and money by eliminating unsuitable
people.
After one week recruits will typically go to the lines but they must not
at this point be abandoned by training staff. Additional trainers should,
working on a 1:10 ratio support the new workers until they can achieve
the prescribed performance targets (75-80%). Supervisors do not
have the time and expertise to work with new workers. These trainers
may not, dependent upon the flow of new workers be fully occupied.
This is when they can work on the most cost effective phase of
systematic training regimes, the improvement of low performing
existing operators.
Conclusion:
A systematic training programme is an essential part of the
management structure of a garment production factory. Without such
a facility the manager will not be able to fully meet his objectives.
Many managers recognise by utilising data from labour cost control
systems that they have a training or skill problem in the lines but do
not have the assets to do anything about it. Trained instructors give
him that ability to positively address problems as part of a
performance improvement initiative.
= (2000*60/25)*50% Pieces
= (2000*60*50) / (25*100) Pieces
= 2400 Pieces
[Note: Production will vary according to the line efficiency and during
learning curve or in the initial days when style is loaded to the line]