In an incremental model, all the requirements are gathered before starting the incremental
development process. In the Software Requirement Specification (SRS) document, the scope
is defined and fixed based on the requirements. The entire development contract will be
defined. However, the minor deviation is possible in the scope but not entirely.
In the evolutionary model, it is not the case. After an overall understanding of the system,
the development team does not really capture all the requirements but starts with some
core or riskier modules. Here the prescribed scope is not defined. Sometimes, the project
never converges as the project manager does not know how much time and effort are
required if the company signs this project or project contract for the first time.
Incremental Model
be complete soon.
7. Picking criteria for the incremental model: when the requirements are more or less
fixed and clearer to the customer. However, to mitigate risk, the development team
involves the customer for feedback, and after each increment, the product is given to
the customer for feedback. And feedback is incorporated in the subsequent increments
to achieve the final product which satisfies the customer’s requirements.
Evolutionary Model
1. The requirements are not clear, and it evolves during the development cycle.
2. At the initial stage, based on their understanding of the customer’s requirements, they
developed the core modules and functionalities and delivered them to the customer for
feedback.
3. This is called an iteration. In each iteration, they release a working software after
performing integration and level of testings.
4. The development team does not know how much has been completed and how much
needs to be complete in the near future.
5. Picking criteria for the evolutionary model: when the requirements are not clear.
1. These two models come under the Agile software development model:
2. Both the model releases solutions incrementally or iteratively take user feedback and
incorporate feedback in subsequent releases.
3. Customers can see and feel the solution at the very initial level.
Reference
1. Fundamentals of Software Engineering Book & NPTEL Video Lectures by Rajib Mall.
Share this:
Like this:
Like
https://notepub.io/notes/software-engineering/software-development-life-cycle/what-are-the-differences-between-the-incremental-and-evolutionary-software-develop… 2/4
07/05/2021 SDLC - Incremental vs Evolutionary Software Development Process - Notepub
Software Engineering
SDLC – V Model
https://notepub.io/notes/software-engineering/software-development-life-cycle/what-are-the-differences-between-the-incremental-and-evolutionary-software-develop… 3/4
07/05/2021 SDLC - Incremental vs Evolutionary Software Development Process - Notepub
https://notepub.io/notes/software-engineering/software-development-life-cycle/what-are-the-differences-between-the-incremental-and-evolutionary-software-develop… 4/4