13-5m Annular Bop Operation Manual
13-5m Annular Bop Operation Manual
13-5m Annular Bop Operation Manual
FOR
Respected users:
It is necessary to read this Operation Manual before you use this blowout
preventer. This manual introduces the structural principle and the technical
parameters of each part as well as the basic operational procedure, provides
the information of components and the information of wearing parts, and
provides the methods of installation, use and storage and some necessary
maintenance and test procedures.
The model of annular blowout preventer provided to you is (with √ mark):
□ FH35-35:(P/N):02-1000
(Serial Number):
□ FH35-35/70:(P/N):02-1000A
(Serial Number):
Please properly keep the above information for the convenience of future
In case of any problem in using this product, please contact our company,
Tel: 0317-2727577
Fax: 0317-2723183
E-mail: rjxgs@htxx.com.cn
http://www.hbrs.com.cn
www.rs.hb.cnpc.com.cn
1
13 5/8”-5000psi Annular BOP
Catalog
1. APPLICATION.......................................................................................................... 3
7. MAINTENANCE ..................................................................................................... 14
2
13 5/8”-5000psi Annular BOP
1. APPLICATION
Annular BOP must be used with hydraulic control system.It is usually with
ram type BOP,but it can also be used independently. It can be used for
following operations:
It can seal on almost any shape of size-Kelly,drill pipe, tool joints, drill
When there is no drilling tool in hole, it can completely shut off the hole.
allowed.
2. TECHNICAL PARAMETER
××× ××——××
14MPa(2,000psi), 21MPa(3,000psi)
35MPa(5,000psi) 70MPa(10,000psi)
3
13 5/8”-5000psi Annular BOP
Temperature
Code of API Working temperature scope
grade code
T75 75 -59~121℃(-75~250 ºF)
T20 20 -29~121℃(-20~250 ºF)
T0 00 -18~121℃(0~250 ºF)
4. Temperature grades of non-metal material contacting well fluid:
Use two letters to indicate up and down limits:
4
13 5/8”-5000psi Annular BOP
3. WORKING PRINCIPLE
Closing action begins when hydraulic fluid is pumped into the closing
chamber of the BOP below the piston. As the piston rise, it pushes the
element up, and the element’s spherical shape causes it to close in at the
piston rise, it pushes the element up, and the element’s spherical shape
5
13 5/8”-5000psi Annular BOP
continues to rise, the element seals around the drill string or shuts off the well
bore. Steel segments in the element move into the well bore to support the
rubber as it contains the well pressure below. Opening action begins when
hydraulic fluid is pumped into the opening chamber of the BOP above the
piston. As the piston comes down, the element returns to its original position
by its elasticity.
4. STRUCTURE FEATURE
There are wear rings at the dynamic seal surface between the piston and
the lower housing & the lower housing and support ring. Wear rings eliminate
metal-to-metal contact between the piston and the lower housing.
All dynamic seals are lip type, especially made to seal against moving
parts with minimum wear and no leakage.
6
13 5/8”-5000psi Annular BOP
The dynamic seal for sealing water pressure adopts Yx-ring. The seal is reliable
without leakage.
4.5. Piston
The section of the piston is “Z”form with the features of short stroke, small
height and large size in radial direction.
4.7.1 This kind of rubber is just like a half ball. It is made of radial
supporting ribs (steel segment) and rubber. The rib is made of alloy-steel.
When the rubber is opened, the ribs will be away from the hole to return to
original position. Even if the rubber worn seriously, it will not block the hole.
4.7.2 Turn over of the rubber is limited. When a hole is closed, the
pressure of the hole forces the rubber turn over, but the steel segment can
resist the turn over, causing the rubber being at safe status. So it can stand
high pressure without damage.
4.7.3 Funnel effect. During tripping out, well pressure and pipe movement
are in the same direction. Rubber compresses firmly against the steel
segment at the top of the element, but rubber at the bottom is slightly
compressed. This creates a” funnel effect” that makes it easy for a tool joint to
enter the sealing element. When tripping in, well pressure and pipe movement
oppose each other. Well pressure compresses the rubber portion of the
element against the steel segments as the tool joint moves down into the
7
13 5/8”-5000psi Annular BOP
4.7.4 Well pressure assists the closing of the sealing element. This makes
4.7.5 The steel segments molded into the rubber make metal-to-metal
sliding contact with the sphere of the housing. This provides lower coefficient
reduced.
4.7.6 When there is drilling tools in the well, take out of the old sealing
element from the BOP by cutting it. Cut the new sealing element between two
steel cores. Pull the sealing element out and cover on the tools in the hole,
▲! Attention: When there is need to change the packing element, the drilling tools
are in the well. First, it must be sure that the drilling tools has been reliable seal by
ram BOP or there is no pressure in the well or there is no pressure trend, and then
8
13 5/8”-5000psi Annular BOP
9
13 5/8”-5000psi Annular BOP
10
13 5/8”-5000psi Annular BOP
Before installation of BOP, you must read the manual before this section. The former
sections introduce structure, function and operation method of each part & attentions in
details. Then, install and use the BOP according to the following procedure.
6.1.1 Following systems are required at well site to use the annular BOP.
2. A control line to the opening (upper) port and a control line to the
1. Inspect if the gasket grooves of well head flange and BOP flange is
point.
11
13 5/8”-5000psi Annular BOP
uniformly.
6.1.4 After annular BOP installed on well head, inspect the following
1. Inspect oil pipes to see if they are in compliance with BOP switch
direction; provide 10.5MPa control pressure to test each ram twice (open and
close), draining air from the pipes. If annular BOP switch movement is not the
same direction as the mark on the hand rod of control platform, reverse the
connection pipes.
connection bolt is fixed once again avoiding unbalanced distribution. See the
6.2. Operation
process, and can also operate, repair, maintain and clear troubles.
After reaching objective interval, the annular BOP should be opened and
closed one time every day to see if they are flexible lock in normal condition.
Stripping operations are undoubtedly the most severe application for any
12
13 5/8”-5000psi Annular BOP
drill string is moved through the preventer under pressure. To prolong sealing
with 18°tool joints should be used, and the tripping rate could not
exceed 0.2m/s.
(3) If conditions will not allow leakage during stripping operations, the
maintain a seal.
still exists, it is said that the rubber has been worn seriously. It must
6.3. Attention
must be treated.
3. When a blowout happens with drill string in the well, the annular
BOP can be used to control the well pressure, but it can’t be used
for a long time. First it can reduce the service life of the rubber,
13
13 5/8”-5000psi Annular BOP
second this kind of BOP has no locking system. Normally, don’t use
the BOP to shut off a well without any thing in it.
working pressure.
4. When the BOP is in close position, it is allowed to move the drill tool
rubber damage.
7. Hydraulic oil must be used to open and close the BOP and keep
clean.
8. After usage or test or before maintenance, the water and dirty in the
body of BOP should be clean out.
7. Maintenance
damaged parts in time, anoint so as to prevent rust after cleaned each seal
surface, (suggest to oil them by synthetic complex aluminium grease), and oil
connecting thread part by thread grease. The oil should not melt under 50℃.
Packing element & each seal parts and seal surface are the key parts in a
BOP. If damaged, BOP is useless in sealing well. So it is very important to
keep it well, and replace it in time if there is damage in sealing parts or
surface.
Replacement procedures are as following:
14
13 5/8”-5000psi Annular BOP
(3) Screw the eyebolts into the sealing element and lift it out. If there is
drill tool in it, the new element should be first cut open with rubber
cutter. The cut surface should be smooth. The old sealing element
should be cut open too, and lift it out and exchange it with the new one.
(See figure 3)
7.1.2. Disassembly of adapter ring and piston
(1) Remove the pipe plugs from the inlet and outlet of hydraulic oil.
Remove the upper housing and sealing element. Then screw the
(2) Screw the eyebolts into the piston and lift it out.
Remove the packing element. Then screw the eyebolts into the dust-proof
1.Check the adapter ring, piston and wear ring on the body (lower
repaired.
2.Check the seal rings of the adapter ring, piston and casing. If there are
15
13 5/8”-5000psi Annular BOP
3.Oil the inner surface of the casing, piston and adapter ring.
6.Grease the inner surface of the upper housing and the supporting
surface of the piston. Coat the connection bolts with thread oil.
rubber part and force it into a small box. This accelerates aging in the
5. Keep the storage area as dry as possible and wipe off any oil, grease
16
13 5/8”-5000psi Annular BOP
(1) If the seal element can not be closed to position, it can be opened
time.
(3) If a BOP has opened for a long time, some foreign matter may be
This is because the BOP has closed for a long time, the rubber has
(1) All the pipes should be blown with pressure air before connected.
(2) There is leakage in the oil pipes. The BOP has not operated for a
17
13 5/8”-5000psi Annular BOP
Appendix:
List 1 RECOMMENDED TORQUES FOR DIFFERENT SIZES OF BOLTS
AND SCREWS (ENGLISH UNIT)
Wrench Wrench
Nut size Nut size
size S size S
ENGLISH ENGLISH
Metric Metric
UNIT UNIT
M12 1/2-13UNC 22 M42×3 1 5/8-8UN 65
M16 5/8-11UNC 27 M45×3 1 3/4-8UN 68
M20 3/4-10UNC 32 M48×3 1 7/8-8UN 74
M22 7/8-9UNC 36 M50×3 2-8UN 77
M24 1-8UN 41 M52×3 77
M27 41 M58×3 2 1/4-8UN 88
M30×3 1 1/8-8UN 46 M64×3 2 1/2-8UN 98
M33×3 1 1/4-8UN 50 M70×3 2 3/4-8UN 105
M36×3 1 3/8-8UN 55 M76×3 3-8UN 115
M39×3 1 1/2-8UN 60 M80×3 125
18
13 5/8”-5000psi Annular BOP
19