Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Matrik Baseline PT

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

MATRIK BASELINE RENCANA PENGGUNAAN/PINJAM PAKAI KAWASAN HUTAN SESUAI KATEGORI L1,L2,L3 BERDASARKAN KONDISI AWAL PENUTUPAN

Nama Perusahaan / Pengguna Kawasan : PT….................


Nomor / Tanggal Persetujuan Prinsip : …................
Luas : …..........................
Jenis Penggunaan Pinjam Pakai : Eksplorasi/Operasi Produksi Batubara dan Sarana Penun
Lokasi Pinjam Pakai Kawasan Hutan :
a. Provinsi : ….........
b. Kabupaten/Kota : …..................
c. Kecamatan/Desa : …..............................
0
Penutupan Lahan dan Luas (Ha)

No. Areal Terganggu T0/BL Luas Izin


Pinjam Pakai T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11

L1 577.27 0.00 0.00 0.00 0.00 0.00 0.00


Tambang = 0.00 = 0.00 Tambang = 20.00 Tambang = Tambang = Tambang = Tambang = Tambang = Tambang = Tambang = Tambang =
1. Bukaan Tambang Aktif Hutan =
Hutan = 0.00 Hutan = 0.00 Hutan = -20.00 Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan =

2 Site office Hutan Site office 0.00 Site office 3.00 Site office 3.00 Site office Site office Site office Site office Site office Site office Site office Site office

Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg = Jln Tmbg =
3 Jalan Tambang Hutan =
Hutan = 0.00 Hutan = 0.00 Hutan = 0.00 Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan =
L2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Disp Area = 0.00 Disp Area = 0.00 Disp Area = Disp Area = Disp Area = Disp Area = Disp Area = Disp Area = Disp Area = Disp Area = Dispo Areal =
1. Disposal Area Hutan =
Hutan = 0.00 Hutan = 0.00 Hutan = 0.00 Hutan = Hutan = Hutan = Hutan = Reklamasi = Reklamasi = Reklamasi = Reklamasi =
Berhasil Berhasil Berhasil
Top Soil = 0.00 Top Soil = 0.00 Top Soil = Top Soil = Top Soil = Top Soil = Top Soil = Top Soil = Top Soil = Top Soil = Top Soil =
2. Top Soil Hutan =
Hutan = 0.00 Hutan = 0.00 Hutan = 0.00 Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan =
Mineout = Mineout = Mineout = Mineout = Mineout = Mineout = Mineout =
3. Bukaan Tambang Selesai
(Mineout) Reklamasi = Reklamasi = Reklamasi = Reklamasi = Reklamasi =
Berhasil Berhasil Berhasil Berhasil Berhasil
Sapras yang sudah tidak
4 digunakan

5 Areal Pengembangan Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan = Hutan =
DISI AWAL PENUTUPAN

T12 T13 T14 T15 T16

0.00 0.00 0.00 0.00 0.00


Tambang =
Hutan =

Site office

Jln Tmbg =
Hutan =
0.00 0.00 0.00 0.00
Dispo Areal = Dispo Areal = Reklamasi = 0.00 Reklamasi Reklamasi
= 0.00 = 0.00
Reklamasi = Hutan = Hutan = 0.00 Berhasil Berhasil

Berhasil
Top Soil = Top Soil = Top Soil = Top Soil = Reklamasi = 0.00
Hutan = Reklamasi = Reklamasi = Reklamasi = Berhasil

Mineout = Mineout = Mineout = Mineout = Mineout = 0.00


Reklamasi = Reklamasi = Reklamasi = Reklamasi = Reklamasi = 0.00
Berhasil Berhasil Berhasil Berhasil Berhasil
Reklamasi
Berhasil 0.00

Hutan = Hutan = Hutan = Hutan = Hutan =

You might also like