Phase 1: 1. Clearing and Grubbing
Phase 1: 1. Clearing and Grubbing
Phase 1: 1. Clearing and Grubbing
PHASE 1
I. SITE WORK
2. Sub-grade Preparation
II. EARTHWORKS
1. Excavation
2. Embankment
1. Perimeter Fence
2. Entrance Gate
3. Slope Protection
1. Foundation
2. Columns
3. Tie Beams
6. Slab on Fill
V. MASONRY WORKS
1. Exterior Partition
2. Interior Partition
1. Water Supply
3. Septic Tank
SUMMARY