Assignment Question
Assignment Question
INTRODUCTION
For this project, you will be required to put into practice the tasks associated with the
Systems Analysis and Design module.
It is essential that individual members of the group realise their responsibility to their
peers and behave in a professional manner.
OBJECTIVES
The objectives of this assignment are to:
1. Provide knowledge of the basic techniques of systems analysis and design.
2. Provide students with the understanding of the roles and responsibilities of system
analyst and project manager within each phase of the systems development lifecycle
(SDLC).
3. Introduce the various stages and activities involved in developing a system using
through systems development lifecycle (SDLC).
4. Provide students with relevant skills on the application of tools and techniques in
planning and gathering information.
5. Provide the knowledge of how an input, output and interface design will determine
whether the system will be accepted by the user or not.
6. Instil the importance of teamwork and good management skills.
LEARNING OUTCOMES
Asia Pacific University of Information Technology and Innovation
CT026-3-1 System Analysis and Design Page 2 of 7
1. Apply to appropriate standard, the key techniques of analysis and design for a
given case study.
2. Describe how the techniques and framework of activities, including key user
interface issues, are used together to develop a system.
ASSESSMENT
This assignment contributes to 50% of module assessment
_______________________________________________________________________
Berjaya Fitness (BF) is a fitness and health centre located in Shah Alam which is owned
by Mr, Halim. It provides fitness facilities such as gymnasium, fitness classes, personal
coaching, etc. to its members and other fitness enthusiasts. Members would need to
subscribe to a membership plan for a certain period of time. Once they had paid for the
subscription they would be able to enjoy the facilities during the centre operating hours
including book personal coaching sessions. As for non-members they would have to pay
the entrance fees if they wish to use the centre facilities.
On the other hand, for the management purposes, staff have to prepare weekly sales
reports on number of members and profit. Another tedious task is the facilities inventory.
As the current practice, the inventory for the facilities are also done manually. Every
week, the staff have to spend time to check for the facilities and place request for services
if needed.
Throughout the years, the number of members have been increasing; and it has found that
using manual system is not efficient for the growing business. He has decided to hire a
professional developer to help him to analyze and design a solution, which would help to
increase the performance of his fitness centre.
Mr. Halim has allocated RM 10,000 for the project and the estimated timeline is 6
months. As the selected company, you have to come out with a Project Planning Report
that consists of the following contents.
Dr. Willy has requested a management system for his clinic to assist all the aspects of
management and operations of clinic. Currently, the management of the clinic is done
manually. All records such as the patient records, medicine and sales are stored in files.
In case where the patient is unsure whether they have previously received any treatment
in the clinic or not, the staff will register the patient again. Due to this practice, data
retrieval has become complicated and this has led to the data inconsistency and
redundancy.
In managing the daily tasks, a patient will be registered by the staff and the patient will be
assigned a specific waiting queue number. When the patient gets their turn, the doctor
will diagnose the patient and prescribe medication and/or medical leave on his card.
Later, the staff will collect the medication card from the doctor and manually calculate
the price of the medicine prescribed. The receipt will be issued to the patient, patient
proceed to the counter to pay and take the medicine.
On the other hand, for the clinic management purposes, the staff have to prepare daily
sales reports on number of patients and the sales. Another tedious task is the medicine
inventory. Every week, the staff have to spend time to check for the medicine in the store
and place order to supplier.
Dr. Willy has a budget of RM 15,000 and the project need to be completed within 8
months. In order to make this idea into practice, Dr. Willy has decided to hire your
company. Your task is to come up with Project Planning Report that consists of the
following contents.
Table of Contents
The table of contents should have the topic title and reference page number attached to
each topic.
1) Introduction
a) Include the introduction of your company (Name, Logo, Vision, and Mission &
Motto).
b) Overview of the business process of the new proposed management system.
2) Problems and Proposed Solutions
a) Identify the problems in the existing systems including the cause and the effects
of it.
b) Identify the aim and objectives of the proposed system.
3) Project Planning
a) Using SDLC as guide, identify and briefly explain the task and activities engaged
in the project.
b) Create a Gantt chart showing your project scheduling.
c) Include a ‘Workload Matrix’, showing the percentage of each member’s
contributions.
4) Feasibility Study
Prepare a Feasibility Report which consists of.
a) Operational, Technical, Economic and Schedule Feasibility.
b) Use the PIECES framework to conduct the Operational feasibility of the system.
5) System Analysis
a) From the findings of your ‘Requirement Gathering’ (Individual Component),
create a list of Requirements (including functional and non-functional
requirements) for the new system.
6) Design Diagram
Show the processes and data engaged in the system through these diagrams;
a) Context Diagram
b) Level-0 DFD
c) ERD
7) Interface Design
a) Create a throw-away prototype for the proposed system. Include all the main
features that you have suggested as solutions for this system. You are not required
to upload the site or create any extra external components such as database,
animation, advertisements, etc. The prototype will be used for your presentation.
b) Discuss the concepts and principals that you have considered / applied into
creating the GUI of your system, including input and output interface design.
8) Requirement Gathering
a) For the initial state of the project, identify ONE method of information gathering
(investigation or requirement gathering) that you would use for this system.
Discuss the benefits and setbacks method chosen. You are advised to use different
methods among group members.
b) Explain the conduct of the investigation method including how it will be carried-
out, target users, location, etc. Create a set of questions that you can use for your
investigation. Display the questions only related the system development project.
9) Design
a) After the construction of DFD (Design Diagram), choose at least TWO different
components of DFD and design a Data Dictionary for each. You are advised to
use different set of components among group members.
b) After the construction of DFD Level 0, choose ONE of the process in your DFD
Level 0 and design DFD Level 1 for the selected process. You are advised to use
different process among group members.
10) Presentation
a) Each team member / individual should present his / her contribution of the
solution for the Assignment. Marks awarded here would depend on Project
Knowledge / Professionalism and Contribution of the individual.
DOCUMENTATION STANDARD:
• Your group needs to hand in the assignment on the due date mentioned on the cover
sheet of the assignment, with all the necessary components as suggested above.
Clearly separate and indicate the Group component and Individual component in your
documentation.
• Final Documentation has to be word processed, printed in A4 size paper (double
sided preferred) and professionally bound. The maximum of 5000 words is
recommended.
• Please consider the environment and don't print unnecessarily. Include all your work
(copy) into an optical disk, to be attached to the documentation. This could be used to
scan for plagiarism. Any additional / redundant materials could also be included into
the optical disk.
• Include the standard report components such as Cover Page, Table of Contents, and
Table of Figures, the list of references / bibliography and appendices where
necessary.
• Include a ‘Workload Matrix’, indicating the contribution of each individual for each
required component (shown in percentage) and should be signed off by each team
member, attached to the APPENDIX part of the final document.
• The presentation will be conducted according to the date & time allocated to each
group. Late submissions will not be assessed unless extenuating circumstances are
upheld.
PERFORMANCE CRITERIA
Distinction (75% and above)
This grade will be assigned to work where the documentation is complete and describes
in detail, with little or no errors, the following components: introduction, project
planning, feasibility study, usage of SDLC, system analysis and design in accordance
with excellent documentation standards. To obtain this grade, the candidate’s individual
assignment should show all techniques of process applied with little or no errors. All
deliverables of the individual component should be coherent with detailed description to
explain the selection and application of investigation techniques, good creation of data
dictionary. Overall documentation standards for both the group project as well as the
individual assignment should be of excellent quality.
This grade will be assigned to work where the documentation is complete and describes
briefly, with some errors, the following components: introduction, project planning,
feasibility study, usage of SDLC, system analysis and design in accordance with good
documentation standards. To obtain this grade, the candidate’s individual assignment
should show all Data dictionary with some errors. All deliverables of the individual
component should be coherent with detailed description to explain the selection and
application of investigation techniques. Overall documentation standards for both the
group project as well as the individual assignment should be of excellent quality.