Central Level Project Implementation Unit (EDU) : National Reconstruction Authority

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

Government of Nepal

National Reconstruction Authority


Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu

2M/F-1D Toilet- Brick


(May 2019)
X Y
A-02 A-02 X Y
A B C D 8580
A-02 A-02

7680
450 7680 450
2650 2150 2650
490 750 2150 900 2150 750 490

3000
5025

450

450
PARTITION BRICK WALL 1000
INCINERATOR
450 150

650
150

650
V2 V1 V2

750
230
230

550
450
1
FRONT ELEVATION

3830

4280
5530

5530
Water Trough

Water Trough
D3 D3 D3 D3

3600
3370

3370
TOILET FEMALE TOILET
MALE TOILET 1920x3370

4930
2420x3370 2420x3370

230

1250

1250
230

D2 D1 D2
2

800
V2 V2 450
1100

1100
600 490 750 510 900 1150 1000 230 900 510 750 490 450 2500 2680 2500 450
1100 mm Wide Corridor 1100 mm Wide Corridor

3000
3600 1200 2340 300 300
1100

1100

Up INCINERATOR

1410
ROOF PLAN
250

A-02
250

5400

450
X

A-02 A-02
BACK ELEVATION
GROUND FLOOR PLAN X Y
Area = 31.19 Sq. M.

1000 900 750


12mm SOLID MS SQUARE ROD
@75-100mm SPACING BETWEEN ROD
900

3000
3000
375
INCINERATOR

VENTILATION V1 (1 NO.)

750
550

450
450
(Scale= 1:25)
750
2100

2100

2100

SIDE ELEVATION SIDE ELEVATION


DOORS & WINDOWS SCHEDULE:
750
S.N. SYMBOL SIZES NOS. REMARKS
V1 900x 375 1 MS Frame
375

1.

375
2. V2 750x 325 4 MS Frame
3. D1 1000 x 2100 1 UPVC/ Wood/ Frame & Shutter
VENTILATION V2 (4 NO.) 4. D2 900 x 2100 2 UPVC/ Wood/ Frame & Shutter
(Scale= 1:25)
0 0.25M 0.5M 0.75M 1M 1.25M 5. D3 750 x 2100 4 UPVC/ Wood/ Frame & Shutter
DOOR D1 (2 NO.) DOOR D2 (2 NO.) DOOR D3 (4 NOS.) 1:25

(Scale= 1:25) TOTAL 12


(Scale= 1:25) (Scale= 1:25) 0 1M 2M 3M 4M 5M
1:100

Date : May019 Sheet No:


Government of Nepal TITLE :
Scale : 1:75
National Reconstruction Authority 2M/F-1D Toilet- GROUND FLOOR
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PLAN/ELEVATION Designed by :
Checked by :
Approved by :
1
110 mm Brick Layer
2 1
450 +3000 ROOF LEVEL

1250
RCC LINTEL (125x150)

RCC LINTEL (350x150) RCC LINTEL (230x150) +2250 LINTEL LEVEL

150 158
RCC SILL (230x75) +1725 SILL LEVEL

UPVC DOOR

2875
D2
D3 +1137 DOWEL LEVEL

2558
75 mm Thick Precast
Slab Cover

2100
2100

75
+662 DOWEL LEVEL
525 12575

452

950
1373
150x150 Opening

150
712
On Wall To Drop Waste
CORRIDOR FEMALE TOILET 650 ± 0.00 PLINTH LEVEL

150 150 150 150


± 0.00 LVL. ± 0.00 LVL.

150

280 75
-450 GROUND LEVEL
350 350

35
300
HARDEN CEMENT CONCRETE FLOORING
HARDEN CEMENT CONCRETE FLOORING

300

300
75 THICK P.C.C. (1:2:4) 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
150MM THICK GRAVEL SOLING

300
2 1 COMPACTED EARTH
RUBBLE STONE MASONRY (1:6)
+3000 TOP BEAM LEVEL COMPACTED EARTH

WALL SECTION AT Y-Y

125
400 350

900 (Scale= 1:40) 900


1250

625
450
RCC LINTEL (350x150) RCC LINTEL (230x150)

150
150

RCC SILL (230x75)

375
V1
75
3000

513

D1
2100

75

BRICK MASONARY (1:6)


400
75

-450 GROUND LEVEL


587

250 TOILET ± 0.00 PLINTH LEVEL


200 100 50

CORRIDOR ± 0.00 LVL.


250 150

150
50

650 -450 GROUND LEVEL


350 350
250 2200 HARDEN CEMENT CONCRETE FLOORING
500

125 125
75 THICK P.C.C. (1:2:4)
HARDEN CEMENT CONCRETE FLOORING
300

300

150 600 150 150MM THICK GRAVEL SOLING 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
50 50 COMPACTED EARTH
300

900 COMPACTED EARTH


100MM THICK P.C.C. (1:2:4)
150MM THICK GRAVEL SOLING RUBBLE STONE MASONRY (1:6)

900
WALL SECTION AT X-X 900
COMPACTED EARTH
(Scale= 1:40)
Date : May019 Sheet No:
Government of Nepal TITLE :
Scale : 1:40
National Reconstruction Authority 2M/F-1D Toilet- SECTIONS
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) Designed by :
Checked by :
Approved by :
2
I
A-03

650
230 525 125 75
1

125 75
200x200 Metal Door
To Prevent Smoke
Entering Latrine
Tile Upto 600mm Height
450 From Slab Level
J

300 100

600
J

1000
Conical Cap

750
A-03
A-03
50Ø Hole On Two Sides

225

100 100
150x150 Opening
On Wall To Drop Waste
150

75125

277

750
± 0.00 LVL. 450

550
135
8Ø MS Grill mesh (630x505)
at 25mm Spacing For
Burning Waste MS Clamp Secured To Wall Tile Upto 600mm Height
I
INCINERATOR PLAN A-03
-450 LVL. From Slab Level
(Scale= 1:25) Cement Punning Over Screed

300
ISNB 135 MS Pipe 350 100mm Thick RCC Slab

225
300 100

ISNB 135 MS Pipe

100
Conical Cap Cement Plaster ± 0.00 LVL.

1310

100
300

550
450
MS Clamp Secured To Wall

350
277

75 mm Thick Precast -450 LVL.


Slab Cover Cement Punning Over Screed
250 150 325

300
350 100mm Thick RCC Slab

75
Cement Plaster

525 125 75

300
452
ISNB 135 MS Pipe
900

950
WATER TROUGH SECTION DETAIL AT Y
1310

1415
150
150x150 Opening
On Wall To Drop Waste (Scale= 1:25)
650
525
± 0.00 LVL.
Handrail 8Ø MS Grill mesh (630x505)
75 mm Thick Precast Slab Cover At 25mm Spacing For

75
Burning Waste
280 125x75 RCC Band 900
315
75

40 mm Harden Cement
75 Concrete Slope Flooring -450MM LVL. WATER TROUGH SECTION DETAIL AT Z
350
(Scale= 1:25)
715

300

150x150 Opening With


1415

200x200 Metal Flap On Y


Latrine Side Z A-03
Harden Cement Concrete Flooring A-03
750 50 mm Thick P.C.C. (1:2:4)
310

200
100 mm Gravel Soiling
Compacted Earth
200

125x75 RCC Band


280

750
180 180
550

550
125mm Thick Brick Wall
350

350mm Thick Cross Wall


350mm Thick Cross Wall
900
Harden Cement Concrete Flooring
SECTION AT J-J TYPICAL WATER TROUGH ELEVATION
SECTION AT I - I 50 mm Thick P.C.C. (1:2:4)
(Scale= 1:25) (Scale= 1:25)
100 mm Gravel Soiling
(Scale= 1:25) Compacted Earth

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- INCINERATOR & WATER
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) TROUGH DETAILS Designed by :
Checked by :
Approved by :
3
A B C D
7800
2650 2150 2650

75
PARTITION BRICK WALL

125
INCINERATOR

725

725
450 490 750 2150 900 75 75
125 413 490
750

350

230
1

619
280
554

240

240

240
610 538 TPH GRAB BAR 610 538

635
1147 125 1148 1148 1147

1235

1235
WC

750

750
SPRAY

400

400

400

400
830
FT

546
700 447 573 700 700 573 447 700

3600
3310

Foldable Hinge

3370
1092
MALE TOILET FEMALE TOILET

Water Trough
2420x3370 2420x3370
546

1250

1250
Water Trough 1920x3370

5050
FT H.C.C. Flooring Slope 1:50 H.C.C. Flooring
H.C.C. Flooring Slope 1:50 1920 2420
50 50 BASIN 50 50
750

750
604 604 650 650

550

700
650
150
554

619
2
230

230
600 490 750 450 960 1150 1000 230 900 510 750 490 450
1100

1100
1100 mm Wide Corridor Slope 1:50 1100 mm Wide Corridor

2280 300 300


1100

Up

1160

1410
250

250
5400

GROUND FLOOR BLOWOUT PLAN


(Scale= 1:50)

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- TOILET BLOW UP PLAN
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) Designed by :
Checked by :
Approved by :
4
CL

230

A M B C D
8650
2650 2150 2650 8Ø@150MM C/C STIRRUPS
425 350 2300 350 1800 350 2300 350 425 4 -12Ø

475 350 475

475 350 475


425

425
350 250 700

150
1300
1
100mmØ Concrete Core

300
M M M
4800

4800
3600

3600
3950

3950

750
150
475 350 475 475 350 475 475 350 475 475 350 475
1300
100MM HEIGHT SKIRTING

300
125 350 125 HARDEN CEMENT C

475 350 475

475 350 475

475 350 475


75MM THICK PCC ONCRETE FLOORING

1300
2 STONE WORK 75MM THICK P.C.C. (1:2:4)

300

300
425

425
150MM BOULDER SOLING
200MM THICK GRAVEL SOLING
325 350 325 GRAVEL FILLING 150 600 150
N N COMPACTED EARTH
STONE MASONRY IN
CEMENT SAND MORTAR (1:6)

300

300
4950 900 2800
2650 2150 2650 50 50
8650

200 100
100MM THICK P.C.C. (1:2:4)
TRENCH PLAN
(Scale= 1:100) 150MM THICK GRAVEL SOLING

CL
150 1000 150
CL 1300
230
230 FOOTING DETAIL AT M-M
(Scale= 1:20)

4 -12Ø 8Ø@150MM C/C STIRRUPS


8Ø@150MM C/C STIRRUPS ± 0.00 PLINTH LVL
± 0.00 PLINTH LVL 4 -12Ø

150
150

- 450 GROUND LVL


300

- 450 GROUND LVL

750
1-16Ø (CONCRETE CORE)
750

300
100MM HEIGHT SKIRTING
300

100MM HEIGHT SKIRTING


125 125 HARDEN CEMENT CONCRETE FLOORING
125 125 HARDEN CEMENT
75MM THICK P.C.C. (1:2:4)
CONCRETE FLOORING
75MM THICK P.C.C. (1:2:4) 200MM THICK GRAVEL SOLING

300

300
300

300

200MM THICK GRAVEL SOLING COMPACTED EARTH


150 150
50 50 COMPACTED EARTH STONE MASONRY IN
200 100

CEMENT SAND MORTAR (1:6)


STONE MASONRY IN

300

300
CEMENT SAND MORTAR (1:6) 100MM x100 MM THICK PCC SOLING
50 50

100
200 100
100MM THICK P.C.C. (1:2:4)

150MM THICK GRAVEL SOLING


150 700 150
1000 150 1000 150
FOOTING DETAIL AT N-N 1300
(Scale= 1:20) FOOTING DETAIL AT CONCRETE CORE
(Scale= 1:20)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- TRENCH PLAN & DETAILS
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) Designed by :
Checked by :
Approved by :
5
A M B C D A B C D A B C D
7680 S 7680 1 7680
2650 2150 2650 2650 2150 2650 2650 2150 2650
230 2420 230 1920 230 2420 230 230 2420 230 1920 230 2420 230 230 2420 230 1920 230 2420 230

1 230
1

230

230

230
1

230

230
3 NOS.-12mmØ (T/O)
M M M S R R 1
3830

3830

3830

3830
3600

3600

3600

3600

3830

3830
3370

3370

3370

3370

3600

3600
3370

3370

225 125
350
2-L-8mmØ
N @100mm c/c

3 NOS.-12mmØ (T/O)
2 2
230

230

230

230
2 230

230

230
SECTION -1-1

1160

1160

1160
N (Scale= 1:25)
4860 230 2710 4860 230 2710 4860 230 2710
2650 2150 2650 2650 2150 2650 2650 2150 2650
7680 7680 7680
LINTEL BAND LAYOUT PLAN SILL BAND LAYOUT PLAN ROOF LVL BEAM PLAN
AT 2100 MM LVL AT 1725 MM LVL AT 2558 MM LVL
(Scale= 1:100) (Scale= 1:100) As Per door/
A B 2 -10Ø
C D (Scale= 1:100)
7800 window length
75 75
1200 250 1200 2150 1200 250 1200 230
2300 1800 2300

230
230 230 230 230
1375 4550 1375

OUT
230

230
1 2 -10Ø
2 -10Ø

75
8 @150mm c/c 8 @150mm c/c
8 @150mm c/c

8 @150mm c/c
8Ø @150mm c/c Stirrups
8 @150mm c/c

8 @150mm c/c
1200

1200
1200
2 No. 8Ø Bar 2 No. 8Ø Bar 2 No. 8Ø Bar
TYPICAL VERTICAL 8Ø @150mm c/c Stirrups

REINFORCEMENT DETAIL
(FOR DOORS & WINDOWS)
(Scale= 1:20)
TYPICAL SILL DETAIL
3950

3950
1200

1200
3250

3250
SECTION AT R-R
(Scale= 1:20)
8 @150mm c/c

8 @150mm c/c

8 @150mm c/c
2 No. 8Ø Bar 230 230
2 No. 8Ø Bar 2 No. 8Ø Bar
1200

1200
1200

1200

8 @150mm c/c 8 @150mm c/c 8 @150mm c/c 1375


2 -10Ø 2 -10Ø
2
230

230
8Ø @150mm c/c Stirrups
1375 375 900 1150 1000 1375

150

150
2 -12Ø 2 -12Ø
1296

1100

8Ø @150mm c/c Stirrups

4800 2650
230
2650 2150 2650
7800
TYPICAL LINTEL DETAIL TYPICAL LINTEL DETAIL
SECTION AT M-M SECTION AT N-N
DOWEL REINFORCEMENT PLAN & DETAILS (Scale= 1:20) (Scale= 1:20)
AT 662 MM, 1137 MM LVL
(Scale= 1:50)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LINTEL, SILL & BEAM BAND
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PLAN & DETAILS, DOWEL
REINFORCEMENT DETAILS
Designed by :
Checked by :
Approved by :
6
A B C D

2650 2150 2650

900

900
1080

1080
663 663

480 480

3600

3600
480 795 795 480

1080

1080
900

900
2

2650 2150 2650

SLAB REINFORCEMENT PLAN


(Scale= 1:50)

A 2650
B 2150
C 2650
D
795 645 645 795
400
450 10mmØ@150mm c/c 10mmØ@150mm c/c
8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 400
450
125

(DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR)

480 663 538 538 663 480


10mmØ@150mm c/c 10mmØ@150mm c/c

SLAB SECTION -X-X


(SCALE = 1:30)

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SLAB REINFORCEMENT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) DETAILS Designed by :
Checked by :
Approved by :
7
Ø75 WW TO WWC WWC WWC
SOAK PIT A Ø75 WW B C Ø75 WW D
Ø110 S
MH
Ø110 S Ø110 S
MH A B C D
Ø20 CW TO Ø25 CW Ø25 CW INLET FROM
Ø75 WW

Ø75 WW

Ø75 WW
Ø110 S TO

Ø110 S Ø110 S
SEPTIC TANK Ø110 S Ø110 S
ADMIN/ LAB OUTLET EXTERNAL SYSTEM/SOURCE
Ø75 S

Ø75 S
Ø1
10

Ø25 CW
S 1000 LITERS TANK
0S
INCINERATOR INCINERATOR ON 3M HIGH MS STAGING
Ø1 1
10
S Ø1 (TANK TO BE LOCATED ON

Ø75 WW
HIGHER ELEVATION)
1 1 Ø20 CW Ø20 CW Ø20 CW Ø20 CW
Ø75 S

Ø20 CW
Ø20 CW
Ø75 S

Ø20 CW

Ø15 CW
Ø15 CW
Ø75 WW Water Trough

Water Trough
Ø75 WWWater Trough

Water Trough
Ø75 WW

Ø20 CW
MALE TOILET FEMALE TOILET MALE TOILET FEMALE TOILET
Ø75 S

Ø75 S

Ø20 CW
Ø20 CW
Ø20 CW Ø20 CW
2 2
1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor

Up Up

SOIL, WASTE PIPE LAYOUT WATER SUPPLY PIPE LAYOUT

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- WATER SUPPLY, SOIL, WASTE
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PIPE LAYOUT & WATER Designed by :
Checked by :
Approved by :
8
1900
300 350 1200 350 300

C
SLO
PE
A IN-LET A

1000

450
P-05
OUT LET P-05
Sand Filling
PE TO SOAK PIT
SLO OPENING
(c X d) 150mm Brick Wall B 600x600 R.C.C
1200 B
350mm Stone Masonary P-05 P-05 Removable Cover
350mm Stone Masonary
in Cement Mortar
in Cement Mortar A
190 600 350 1100 150 900 350
3640 600x600 R.C.C
PLAN OF SOAK PIT COVER SLAB
Removable Cover PLAN OF BOTTOM REINFORCEMENT
PLAN OF SEPTIC TANK
120mm Thk. R.C.C Slab B 8 Ø (DIST)
Removable Cover
GL 475
PLAN OF SOAK PIT
250 100 75mm Thk. P.C.C(1:3:6) 125mm Thk. R.C.C Slab
IN-LET
150

150
d
C A
820

300

OUT LET

As Per Site
150
50 GL

150
450

TO SOAK PIT
Effluent Level

860
150mm Brick Wall IN-LET
SECTION AT Z-Z
2070

100mm Thk. P.C.C (1:3:6) STEP

1200
150mm Gravel Soling 350mm Stone Masonary
in Cement Mortar 350mm Stone Masonary
in Cement Mortar
150
1:40 SLOPE 1:40 SLOPE
Gravel Packing 3NOS-10 Ø

H
Sand Filling (TYPICAL TOP BARS)

150mm Thk. P.C.C (1:3:6)


150mm Gravel Soling SECTION AT A-A

475 (L/4)
N Stonework

S
375

SECTION AT B-B 1900


INLET OUTLET

230
450

M
INLET OUTLET PLAN OF SOAK PIT COVER SLAB

450
P INLET OUTLET R
375

PLAN OF TOP REINFORCEMENT

230
375 450 375 375 450 375 3NOS 10 T CORNER BARS
(TOP & BOTTOM BARS) TYPICAL BARS
375 600 375 PLAN
CI Cover PLAN
PLAN GL RCC Slab CI Rain Inlet Cover

500
100

8 Ø @ 8"C/C
GL RCC Slab
MAX. 1500

Stonework
100
VARIES

CI Manhole Cover 8 Ø @ 6"C/C


MAX. 1500

INLET Stonework X X
VARIES

GL RCC Slab 625


OUTLET INLET P-05 P-05
100

Stonework
100

PCC 1:3:6 OUTLET


MAX. 1500
VARIES

100

12mm Cement Plaster PCC 1:3:6 500


INLET IN 1:4 C/M Rammed Earth
Rammed Earth
Cement Plaster
OUTLET Cement Plaster
100

1:4 With Punning


1:4 With Punning
PCC 1:3:6
SECTION M-M SECTION R-R 190 600 350 1100 150 900 350
SECTION P-P 2500
GL GL PLAN OF SEPTIC TANK
100MAX. 1500100
100MAX. 1500100

SEWER MANHOLE 12mm Cement Plaster 12mm Cement Plaster REINFORCEMENT DETAIL OF SEPTIC TANK COVER SLAB
VARIES
VARIES

In 1:4 C/M In 1:4 C/M


FOR DEPTH UPTO 1.5M PCC Benching PCC Benching
625 625
B
ST

CB
SECTION N-N SECTION S-S B 500
500 A
WASTE CHAMBER RAIN INLET CHAMBER
MANHOLE & CHAMBERS SECTION AT X-X

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SOAK PIT & SEPTIC TANK
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) DETAILS Designed by :
Checked by :
Approved by :
9
SB-1/S1 SB-2/S1 SB-5/S1 SB-6/S1
L1 L1 L1 L1

SB-8/S1 SB-3/S1 SB-7/S2 Cable From Main Panel Board


SB-1/DB SB-2/DB L1 SB-5/DB 2 Nos 2.5 Sq mm Cu wire Multistranded + 1X 1.5
Sq mm Cu Wire
SB-2/S1 SB-4/S1 SB-6/DB
L1 L1 6 A DP MCB WITH
ENCLOSURE
MALE TOILET FEMALE TOILET
To Toilet Light Ckt

TOILET LIGHT DISTRIBUTION SYSTEM


SB-7/DB
SB-8/DB
SB-2/DB SB-3/DB SB-4/DB
SB-7/S1 L1 L1

Up

LEGENDS
S.No. Symbols Description Mounting Height
1. 6 W LED Square Panel Light of 360 Lumen Attached to the Ceiling

6 A DP MCB WITH ENCLOSURE 2.5 m above the Ground Level


2.

TOILET 1-3(T) PLAN


LIGHT LAYOUT

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LIGHT, POWER & DB LAYOUT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PLAN Designed by :
Checked by :
Approved by :
10