Central Level Project Implementation Unit (EDU) : National Reconstruction Authority
Central Level Project Implementation Unit (EDU) : National Reconstruction Authority
Central Level Project Implementation Unit (EDU) : National Reconstruction Authority
7680
450 7680 450
2650 2150 2650
490 750 2150 900 2150 750 490
3000
5025
450
450
PARTITION BRICK WALL 1000
INCINERATOR
450 150
650
150
650
V2 V1 V2
750
230
230
550
450
1
FRONT ELEVATION
3830
4280
5530
5530
Water Trough
Water Trough
D3 D3 D3 D3
3600
3370
3370
TOILET FEMALE TOILET
MALE TOILET 1920x3370
4930
2420x3370 2420x3370
230
1250
1250
230
D2 D1 D2
2
800
V2 V2 450
1100
1100
600 490 750 510 900 1150 1000 230 900 510 750 490 450 2500 2680 2500 450
1100 mm Wide Corridor 1100 mm Wide Corridor
3000
3600 1200 2340 300 300
1100
1100
Up INCINERATOR
1410
ROOF PLAN
250
A-02
250
5400
450
X
A-02 A-02
BACK ELEVATION
GROUND FLOOR PLAN X Y
Area = 31.19 Sq. M.
3000
3000
375
INCINERATOR
VENTILATION V1 (1 NO.)
750
550
450
450
(Scale= 1:25)
750
2100
2100
2100
1.
375
2. V2 750x 325 4 MS Frame
3. D1 1000 x 2100 1 UPVC/ Wood/ Frame & Shutter
VENTILATION V2 (4 NO.) 4. D2 900 x 2100 2 UPVC/ Wood/ Frame & Shutter
(Scale= 1:25)
0 0.25M 0.5M 0.75M 1M 1.25M 5. D3 750 x 2100 4 UPVC/ Wood/ Frame & Shutter
DOOR D1 (2 NO.) DOOR D2 (2 NO.) DOOR D3 (4 NOS.) 1:25
1250
RCC LINTEL (125x150)
150 158
RCC SILL (230x75) +1725 SILL LEVEL
UPVC DOOR
2875
D2
D3 +1137 DOWEL LEVEL
2558
75 mm Thick Precast
Slab Cover
2100
2100
75
+662 DOWEL LEVEL
525 12575
452
950
1373
150x150 Opening
150
712
On Wall To Drop Waste
CORRIDOR FEMALE TOILET 650 ± 0.00 PLINTH LEVEL
150
280 75
-450 GROUND LEVEL
350 350
35
300
HARDEN CEMENT CONCRETE FLOORING
HARDEN CEMENT CONCRETE FLOORING
300
300
75 THICK P.C.C. (1:2:4) 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
150MM THICK GRAVEL SOLING
300
2 1 COMPACTED EARTH
RUBBLE STONE MASONRY (1:6)
+3000 TOP BEAM LEVEL COMPACTED EARTH
125
400 350
625
450
RCC LINTEL (350x150) RCC LINTEL (230x150)
150
150
375
V1
75
3000
513
D1
2100
75
150
50
125 125
75 THICK P.C.C. (1:2:4)
HARDEN CEMENT CONCRETE FLOORING
300
300
150 600 150 150MM THICK GRAVEL SOLING 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
50 50 COMPACTED EARTH
300
900
WALL SECTION AT X-X 900
COMPACTED EARTH
(Scale= 1:40)
Date : May019 Sheet No:
Government of Nepal TITLE :
Scale : 1:40
National Reconstruction Authority 2M/F-1D Toilet- SECTIONS
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) Designed by :
Checked by :
Approved by :
2
I
A-03
650
230 525 125 75
1
125 75
200x200 Metal Door
To Prevent Smoke
Entering Latrine
Tile Upto 600mm Height
450 From Slab Level
J
300 100
600
J
1000
Conical Cap
750
A-03
A-03
50Ø Hole On Two Sides
225
100 100
150x150 Opening
On Wall To Drop Waste
150
75125
277
750
± 0.00 LVL. 450
550
135
8Ø MS Grill mesh (630x505)
at 25mm Spacing For
Burning Waste MS Clamp Secured To Wall Tile Upto 600mm Height
I
INCINERATOR PLAN A-03
-450 LVL. From Slab Level
(Scale= 1:25) Cement Punning Over Screed
300
ISNB 135 MS Pipe 350 100mm Thick RCC Slab
225
300 100
100
Conical Cap Cement Plaster ± 0.00 LVL.
1310
100
300
550
450
MS Clamp Secured To Wall
350
277
300
350 100mm Thick RCC Slab
75
Cement Plaster
525 125 75
300
452
ISNB 135 MS Pipe
900
950
WATER TROUGH SECTION DETAIL AT Y
1310
1415
150
150x150 Opening
On Wall To Drop Waste (Scale= 1:25)
650
525
± 0.00 LVL.
Handrail 8Ø MS Grill mesh (630x505)
75 mm Thick Precast Slab Cover At 25mm Spacing For
75
Burning Waste
280 125x75 RCC Band 900
315
75
40 mm Harden Cement
75 Concrete Slope Flooring -450MM LVL. WATER TROUGH SECTION DETAIL AT Z
350
(Scale= 1:25)
715
300
200
100 mm Gravel Soiling
Compacted Earth
200
750
180 180
550
550
125mm Thick Brick Wall
350
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- INCINERATOR & WATER
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) TROUGH DETAILS Designed by :
Checked by :
Approved by :
3
A B C D
7800
2650 2150 2650
75
PARTITION BRICK WALL
125
INCINERATOR
725
725
450 490 750 2150 900 75 75
125 413 490
750
350
230
1
619
280
554
240
240
240
610 538 TPH GRAB BAR 610 538
635
1147 125 1148 1148 1147
1235
1235
WC
750
750
SPRAY
400
400
400
400
830
FT
546
700 447 573 700 700 573 447 700
3600
3310
Foldable Hinge
3370
1092
MALE TOILET FEMALE TOILET
Water Trough
2420x3370 2420x3370
546
1250
1250
Water Trough 1920x3370
5050
FT H.C.C. Flooring Slope 1:50 H.C.C. Flooring
H.C.C. Flooring Slope 1:50 1920 2420
50 50 BASIN 50 50
750
750
604 604 650 650
550
700
650
150
554
619
2
230
230
600 490 750 450 960 1150 1000 230 900 510 750 490 450
1100
1100
1100 mm Wide Corridor Slope 1:50 1100 mm Wide Corridor
Up
1160
1410
250
250
5400
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- TOILET BLOW UP PLAN
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) Designed by :
Checked by :
Approved by :
4
CL
230
A M B C D
8650
2650 2150 2650 8Ø@150MM C/C STIRRUPS
425 350 2300 350 1800 350 2300 350 425 4 -12Ø
425
350 250 700
150
1300
1
100mmØ Concrete Core
300
M M M
4800
4800
3600
3600
3950
3950
750
150
475 350 475 475 350 475 475 350 475 475 350 475
1300
100MM HEIGHT SKIRTING
300
125 350 125 HARDEN CEMENT C
1300
2 STONE WORK 75MM THICK P.C.C. (1:2:4)
300
300
425
425
150MM BOULDER SOLING
200MM THICK GRAVEL SOLING
325 350 325 GRAVEL FILLING 150 600 150
N N COMPACTED EARTH
STONE MASONRY IN
CEMENT SAND MORTAR (1:6)
300
300
4950 900 2800
2650 2150 2650 50 50
8650
200 100
100MM THICK P.C.C. (1:2:4)
TRENCH PLAN
(Scale= 1:100) 150MM THICK GRAVEL SOLING
CL
150 1000 150
CL 1300
230
230 FOOTING DETAIL AT M-M
(Scale= 1:20)
150
150
750
1-16Ø (CONCRETE CORE)
750
300
100MM HEIGHT SKIRTING
300
300
300
300
300
300
300
CEMENT SAND MORTAR (1:6) 100MM x100 MM THICK PCC SOLING
50 50
100
200 100
100MM THICK P.C.C. (1:2:4)
1 230
1
230
230
230
1
230
230
3 NOS.-12mmØ (T/O)
M M M S R R 1
3830
3830
3830
3830
3600
3600
3600
3600
3830
3830
3370
3370
3370
3370
3600
3600
3370
3370
225 125
350
2-L-8mmØ
N @100mm c/c
3 NOS.-12mmØ (T/O)
2 2
230
230
230
230
2 230
230
230
SECTION -1-1
1160
1160
1160
N (Scale= 1:25)
4860 230 2710 4860 230 2710 4860 230 2710
2650 2150 2650 2650 2150 2650 2650 2150 2650
7680 7680 7680
LINTEL BAND LAYOUT PLAN SILL BAND LAYOUT PLAN ROOF LVL BEAM PLAN
AT 2100 MM LVL AT 1725 MM LVL AT 2558 MM LVL
(Scale= 1:100) (Scale= 1:100) As Per door/
A B 2 -10Ø
C D (Scale= 1:100)
7800 window length
75 75
1200 250 1200 2150 1200 250 1200 230
2300 1800 2300
230
230 230 230 230
1375 4550 1375
OUT
230
230
1 2 -10Ø
2 -10Ø
75
8 @150mm c/c 8 @150mm c/c
8 @150mm c/c
8 @150mm c/c
8Ø @150mm c/c Stirrups
8 @150mm c/c
8 @150mm c/c
1200
1200
1200
2 No. 8Ø Bar 2 No. 8Ø Bar 2 No. 8Ø Bar
TYPICAL VERTICAL 8Ø @150mm c/c Stirrups
REINFORCEMENT DETAIL
(FOR DOORS & WINDOWS)
(Scale= 1:20)
TYPICAL SILL DETAIL
3950
3950
1200
1200
3250
3250
SECTION AT R-R
(Scale= 1:20)
8 @150mm c/c
8 @150mm c/c
8 @150mm c/c
2 No. 8Ø Bar 230 230
2 No. 8Ø Bar 2 No. 8Ø Bar
1200
1200
1200
1200
230
8Ø @150mm c/c Stirrups
1375 375 900 1150 1000 1375
150
150
2 -12Ø 2 -12Ø
1296
1100
4800 2650
230
2650 2150 2650
7800
TYPICAL LINTEL DETAIL TYPICAL LINTEL DETAIL
SECTION AT M-M SECTION AT N-N
DOWEL REINFORCEMENT PLAN & DETAILS (Scale= 1:20) (Scale= 1:20)
AT 662 MM, 1137 MM LVL
(Scale= 1:50)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LINTEL, SILL & BEAM BAND
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PLAN & DETAILS, DOWEL
REINFORCEMENT DETAILS
Designed by :
Checked by :
Approved by :
6
A B C D
900
900
1080
1080
663 663
480 480
3600
3600
480 795 795 480
1080
1080
900
900
2
A 2650
B 2150
C 2650
D
795 645 645 795
400
450 10mmØ@150mm c/c 10mmØ@150mm c/c
8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 400
450
125
(DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SLAB REINFORCEMENT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) DETAILS Designed by :
Checked by :
Approved by :
7
Ø75 WW TO WWC WWC WWC
SOAK PIT A Ø75 WW B C Ø75 WW D
Ø110 S
MH
Ø110 S Ø110 S
MH A B C D
Ø20 CW TO Ø25 CW Ø25 CW INLET FROM
Ø75 WW
Ø75 WW
Ø75 WW
Ø110 S TO
Ø110 S Ø110 S
SEPTIC TANK Ø110 S Ø110 S
ADMIN/ LAB OUTLET EXTERNAL SYSTEM/SOURCE
Ø75 S
Ø75 S
Ø1
10
Ø25 CW
S 1000 LITERS TANK
0S
INCINERATOR INCINERATOR ON 3M HIGH MS STAGING
Ø1 1
10
S Ø1 (TANK TO BE LOCATED ON
Ø75 WW
HIGHER ELEVATION)
1 1 Ø20 CW Ø20 CW Ø20 CW Ø20 CW
Ø75 S
Ø20 CW
Ø20 CW
Ø75 S
Ø20 CW
Ø15 CW
Ø15 CW
Ø75 WW Water Trough
Water Trough
Ø75 WWWater Trough
Water Trough
Ø75 WW
Ø20 CW
MALE TOILET FEMALE TOILET MALE TOILET FEMALE TOILET
Ø75 S
Ø75 S
Ø20 CW
Ø20 CW
Ø20 CW Ø20 CW
2 2
1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor
Up Up
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- WATER SUPPLY, SOIL, WASTE
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PIPE LAYOUT & WATER Designed by :
Checked by :
Approved by :
8
1900
300 350 1200 350 300
C
SLO
PE
A IN-LET A
1000
450
P-05
OUT LET P-05
Sand Filling
PE TO SOAK PIT
SLO OPENING
(c X d) 150mm Brick Wall B 600x600 R.C.C
1200 B
350mm Stone Masonary P-05 P-05 Removable Cover
350mm Stone Masonary
in Cement Mortar
in Cement Mortar A
190 600 350 1100 150 900 350
3640 600x600 R.C.C
PLAN OF SOAK PIT COVER SLAB
Removable Cover PLAN OF BOTTOM REINFORCEMENT
PLAN OF SEPTIC TANK
120mm Thk. R.C.C Slab B 8 Ø (DIST)
Removable Cover
GL 475
PLAN OF SOAK PIT
250 100 75mm Thk. P.C.C(1:3:6) 125mm Thk. R.C.C Slab
IN-LET
150
150
d
C A
820
300
OUT LET
As Per Site
150
50 GL
150
450
TO SOAK PIT
Effluent Level
860
150mm Brick Wall IN-LET
SECTION AT Z-Z
2070
1200
150mm Gravel Soling 350mm Stone Masonary
in Cement Mortar 350mm Stone Masonary
in Cement Mortar
150
1:40 SLOPE 1:40 SLOPE
Gravel Packing 3NOS-10 Ø
H
Sand Filling (TYPICAL TOP BARS)
475 (L/4)
N Stonework
S
375
230
450
M
INLET OUTLET PLAN OF SOAK PIT COVER SLAB
450
P INLET OUTLET R
375
230
375 450 375 375 450 375 3NOS 10 T CORNER BARS
(TOP & BOTTOM BARS) TYPICAL BARS
375 600 375 PLAN
CI Cover PLAN
PLAN GL RCC Slab CI Rain Inlet Cover
500
100
8 Ø @ 8"C/C
GL RCC Slab
MAX. 1500
Stonework
100
VARIES
INLET Stonework X X
VARIES
Stonework
100
100
SEWER MANHOLE 12mm Cement Plaster 12mm Cement Plaster REINFORCEMENT DETAIL OF SEPTIC TANK COVER SLAB
VARIES
VARIES
CB
SECTION N-N SECTION S-S B 500
500 A
WASTE CHAMBER RAIN INLET CHAMBER
MANHOLE & CHAMBERS SECTION AT X-X
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SOAK PIT & SEPTIC TANK
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) DETAILS Designed by :
Checked by :
Approved by :
9
SB-1/S1 SB-2/S1 SB-5/S1 SB-6/S1
L1 L1 L1 L1
Up
LEGENDS
S.No. Symbols Description Mounting Height
1. 6 W LED Square Panel Light of 360 Lumen Attached to the Ceiling
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LIGHT, POWER & DB LAYOUT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Brick (May 2019) PLAN Designed by :
Checked by :
Approved by :
10