Lats Cad User's Manual: LG Electronics
Lats Cad User's Manual: LG Electronics
Lats Cad User's Manual: LG Electronics
LATS CAD
User’s Manual
CAD Drawing & System Check Simulation Program’s Tutorial & Manual
LG Electronics
DEC. 24, 2019
Table of Contents
Table of Contents 2
System Requirement 6
Software .......................................................................................................................................... 6
Installation 7
Procedure for using LATS CAD................................................................................................. 7
Program installation..................................................................................................................... 7
Following 8
User Registration .......................................................................................................................... 8
LATS Execution ............................................................................................................................10
LATS CAD Window.....................................................................................................................11
Project Management .................................................................................................................12
Project Creation ...........................................................................................................12
Space Information Creation.....................................................................................................15
Building Creation (Using Excel Sheet) ...................................................................15
Building Creation (Using Master Menu)................................................................17
Floor Management......................................................................................................18
Room Management....................................................................................................19
Area Designation .........................................................................................................20
Environment Setting ...................................................................................................23
Equipment Positioning ..............................................................................................................24
Indoor Unit Positioning .............................................................................................24
Outdoor Unit Positioning ..........................................................................................27
AHU Positioning .........................................................................................................................29
Pipe Connection..........................................................................................................................34
Riser Hole Positioning ................................................................................................34
Refrigerant Pipe Connection ....................................................................................36
Branching Pipe Connection ......................................................................................38
Drain Pipe Connection ...............................................................................................39
Material Index...............................................................................................................41
Drawing Check ............................................................................................................................42
Drawing Check _Pipe Design Check.......................................................................42
System Check ...............................................................................................................43
Checking Drain Validation ........................................................................................47
Refrigerant System Diagram Drawing ..................................................................................49
Building Board Composition ....................................................................................49
Schematic(Refrigerant) Diagram Equipment Arrangement..............................50
Control Diagram Drawing ........................................................................................................52
Layer Arrangement......................................................................................................52
Outdoor Unit Property Information Change........................................................52
Controller Positioning ................................................................................................53
Control Cable Model Setting ...................................................................................54
Control Wiring..............................................................................................................54
Wiring remote control ...............................................................................................55
Control Riser Hole Positioning ................................................................................56
Control Remarks ..........................................................................................................56
Checking Communication line Validation.............................................................57
List of Control Equipment.........................................................................................58
Schematic(Control) Diagram Equipment Arrangement.....................................59
Others 163
Utilizing Automatic Save Function...................................................................................... 163