All Hira
All Hira
All Hira
1. Concrete Pouring of Diapragm Wall with the help of 10 " Dia Tremie Pipe
2. Lifting of Mechanical Grab Excavator and Placing it at required job location by 75 MT Crane
3. Water proofing membranes works.
4. Rain water pipe fixing
5. Erection of Side cladding with the help of MEN LIFTER.
6. CALIBRATION OF BATCHING PLANT
7. Production of concrete with Bin system Batching Plant
8. Production of concrete with Batching Plant with skip arrangement.
9. BATCHING PLANT
10. REINFORCEMENT
11. Assembly of structural steel
12. RCC/PCC / SCREED
13. Loading and Unloading Structural Material
14. BACK FILLING
15. EXCAVATION FOR BUND WALL
16. Lifting of main beam at various height with help of Crane
Note: Contact for any Query about HIRA to.
Mr. Chandrakant Patil
y 75 MT Crane Safety Engineer
Cont no.: 07567118585
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Lifting of Mechanical Grab Excavator and Placing it at required job location by 75 MT Crane
CONTROLLED
Sly ACTIVITY HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK FINAL RESPONSIBILITY
No (JOB STEPS IN SEQUENCE) ASSESSMENT
RATING
2 Grab excavator will be lifted 1.Uneven and loose body injury/ 1.Before using crane the area should
vertically by 1.5 to 2 m from surface/ toppling of Property damage checked and leveled properly.
the static position to clear the crane 5 5 25 2 2 4 Tolerable ACCEPTABLE
bed.
3 Move the grab excavator in 1.Free swing of crane/hit body injury/ 1) Proper attention should be paid for
right direction so that any to structure or person Property damage any interaction.
interaction of swinging of the 4 4 16 2 2 4 Tolerable ACCEPTABLE
crane is not occurred.
5 Position the Grab Excavator 1.free swing of grab 1.Double leg sling should be used with
properly to start excavation excavator/hit to body injury/ guide rope at both ends.
process. structure and person 4 4 16 2 2 4 Tolerable ACCEPTABLE
Property damage
Site Engineer /
Project Manager
2.Improper 2.Barrication should be provided
barrication/body injury around working area and unauthorized
body injury 4 4 16 entry should be strictly stopped. 2 2 4 Tolerable ACCEPTABLE
Name:
Designation:
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Concrete Pouring of Diaphragm Wall with the help of 10 " Dia Tremie Pipe
Sl No
ACTIVITY (JOB STEPS IN CONTROLLED FINAL
SEQUENCE)
HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK
RISK RATING ASSESSMENT
RESPONSIBILITY
2 Proper pouring of concrete 1. Improper handling of 1. The trunk of the pumper should be
on to the tremie pipe material / Fall of material properly fixed to avoid splash.
Body injury / fall
of material / 3 3 9 2. The area should be well barricaded and 2 2 4 TOLERABLE ACCEPTABLE
property damage unauthorized entry should be restricted to
avoid injury
Name:
Designation: DPM
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Water proofing membranes works. FORMAT NO:
ACTIVITY CONTROLLED
Sly FINAL
(JOB STEPS IN HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
No ASSESSMENT
SEQUENCE) RATING
1 Surface Preparation / Hand injury / 1)Area shall have adequate TOLERABLE ACCEPTABLE
Pre-cleaning Inhalation of ventilation.
gas/Dust Body injury 3 3 9 2)Use of PPE (Hand 2 1 2
gloves, Goggles)
Site Engineer / Project
2 Liquithane Hand injury / 1)Worker should be well TOLERABLE ACCEPTABLE Manager
preparation mixing of Inhalation of trained .
two components. gas/Dust Body injury / Burn 3 2 6 2 2 4
2)Use of PPE (Hand gloves,
Goggles , etc) .
3 Liquithane applied. Hand injury / 1)Area shall have adequate TOLERABLE ACCEPTABLE
Inhalation of Body injury / Fume ventilation.
gas/Dust mist 4 4 16 2)Use of PPE (Hand 2 2 4
inhalation/Death gloves,Goggles) .
Site Engineer / Project
Manager
4 Post Cleaning Hand injury / Use of PPE (Hand gloves, TOLERABLE ACCEPTABLE
Inhalation of Body injury 3 3 9 Mask ,Goggles) 1 2 2
gas/Dust
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
ACTIVITY (JOB
Sl CONTROLLED FINAL RESPONSIBILI
STEPS IN HAZARDS/RISK CONSEQUENCEPROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK
No RISK RATING ASSESSMENT TY
SEQUENCE)
1 Reaching to the place 1. Improper route to 5 5 25 1.Proper two no. of lifeline should 2 2 4
reach the top of working be use , fall arrestor should be use
place/fall of person 2. ladder should
be fixed with proper dimension and
Body Injury / ppe rope. TOLERABLE ACCEPTABLE
Fetal 3.Use of PPE (Hand
gloves, Goggles , etc) .
2 Use of tools at height 1. Improper arrengment 1) Carry tools in a gunny bag or tie
and Welding machine of lifeline , plateform, the tools with rope.
use for Fixing rain not use of Fallarrestor 2)Rope & pulley used for lifting
water pipe can cause fall of of material should be free from any
person and material defect.
Fatal 5 5 25 3)Worker should be well trained 2 2 4 TOLERABLE ACCEPTABLE
2. Electric and use of proper tool.
shock due to improper
tool use for drill/ welding 4)Use of PPE (Hand gloves,
. Goggles ,etc) , use of Fallarrestor. Site Engineer /
Project Manager
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Rain water pipe fixing
Sl No
ACTIVITY (JOB STEPS IN SEVERIT CONTROLLED FINAL
HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY RISK RESPONSIBILITY
SEQUENCE) Y RISK RATING ASSESSMENT
2 Use of tools at height 1. Improper handling of 1. Carry tools in a gunny bag or tie the tools
Electric drill. material / Fall of material with rope.
Serious injury 3 3 9 2.Rope & pulley used for lifting of material 2 2 4 TOLERABLE ACCEPTABLE
should be free from any defect. Site Engineer /
Manager
3 Fixing rain water pipe 1. Improper arrengment of 1)Worker should be well trained and use of
plateform. / fall of person and proper tool.
material Fatal 5 5 25 2)Use of PPE (Hand 2 2 4 TOLERABLE ACCEPTABLE
2.) Electric gloves, Goggles ,etc)
shock due to improper tool
use for drill.
4 Up & down movement of 1.Improper route 1. Full body harness should be used by all the
persons for work. worker and it will be anchored at suitable
position.
Fatal 4 5 20 2 2 4 TOLERABLE ACCEPTABLE
2. If possible ladder should be used for
moving up and down.
2. Stacking of loose material 1. No loose material should be kept at height
at scaffolding. regular supervison should be done.
5 Dismantling of scaffold 1.fall of scaffold material 1. The area where dismantling takes place Site Engineer /
while dismantling. should be barricaded and depute one person Manager
for communication to nearby area made.
Serious injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Erection of Side cladding with the help of MEN LIFTER.
1 Rreaching at job/height by Topple of man lifter , Fall of Before use of man lifter operator should
MEN LIFTER. person , Failure of lift . inspect the man lifter properly , proper Full
Fatal / Serious
5 4 20 body harness should be use and properly 2 2 4 TOLERABLE ACCEPTABLE
injury
hanker .
2 Lifting of sheet with the help of 1. Improper handling of 1.Rope & pulley used for lifting of material
PP rope material / Fall of material should be free from any defect.
Serious injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE
2. Tools like hand drill and screw should be
kept in bags and away from edge.
4 Removal of lifting arrangment 1.Improper route / Fall of 1. Full body harness should be used by all
person Fatal 5 5 25 the worker and it will be anchored at suitable 2 2 4 TOLERABLE ACCEPTABLE
position.
5 Completion of job 1. Impopre route / Fall of 1. Full body harness should be used by all
person the worker and it will be anchored at suitable
Fatal 5 5 25 position while coming down BY MEN LIFTER 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
1 Cleaning all load cells Hand injury / Inhalation 1)Area shall have adequate Tolerable ACCEPTABLE
of gas/Dust Body ventilation. 2)Use
3 3 9 of PPE (Hand gloves, Mask , 2 1 2
injury
Goggles)
2 Keeping weights and Improper placing of 1) Safe distance should be Tolerable ACCEPTABLE
release the loads . load, slip of cell can maintained. Site Engineer / Project
cause body injury Body
4 4 16 2)Operator should be well trained . 2 2 4 Manager
injury 3)Use of PPE (Hand
gloves, Mask , Goggles)
3 Post Cleaning Hand injury / Inhalation 1)Use of PPE (Hand gloves, Mask , Tolerable ACCEPTABLE
of gas/Dust Body Goggles)
2 3 6 1 2 2
injury
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Production of concrete with Bin system Batching Plant
ACTIVITY (JOB CONTROLLE FINAL
S. CONSEQUENC PROBABILI SEVERI PRESENT CONTROL PROBABIL SEVERIT RESPONSIBI
STEPS IN HAZARDS/RISK RISK RISK D RISK ASSESSME
No ES TY TY MEASURE ITY Y LITY
SEQUENCE) RATING NT
1 Aggregates are 1)Manual poring of 1. Proper lifting and placing of
dumped in the plant cement into hopper so cement bag .
area. fall of person, inhalation 2. Proper tool use for cutting
body injury. 4 3 12 cement bag.
3. Use of proper PPE (Safety
goggles ,face mask, hand
gloves)
ACCEPTAB
Body injury/Fetal 2 2 4 TOLERABLE
2) Worker may come in 1. All rotating parts like gears, LE
contact with the rotating chains & rollers should be
parts of the machines. 3 3 9 guarded or barricaded.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Production of concrete with Batching Plant with skip arrangement. FORMAT NO:
2 Pulls the aggregates 1) Injury due to unsafe 1. All rotating parts like gears,
up to the walls work. chains & rollers should be guarded
or barricaded.
2) Worker may
come in contact with 2. Proper ramp for concrete
the rotating parts of unloading in bucket / pump should
the machines. be provide.
Body injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : BATCHING PLANT
CONTROLL FINAL
S. ACTIVITY (JOB STEPS CONSEQUENC PROBABILIT SEVERIT PROBABILI SEVERIT RESPONSIBILI
HAZARDS/RISK RISK PRESENT CONTROL MEASURE RISK ED RISK ASSESSMEN
No IN SEQUENCE) ES Y Y TY Y TY
RATING T
1 Cement are conveyed 1)Manual poring of 1. Proper lifting and placing
by head load from cement into hopper of cement bag.
go-down to cutting so fall of person 2. Proper tool use for cutting
platform ,inhalation body 4 3 12 cement bag.
injury. 3. Use of proper PPE (Safety
goggles ,face mask, hand
gloves )
body
2) Worker may come 2. All rotating parts like gears, 2 2 4 TOLERABLE ACCEPTABLE
injury/Fatal
in contact with the chains & rollers should be
3 3 9
rotating parts of the guarded or barricaded.
machines.
3)Inhalation of 1.Use of proper PPE (Safety
cement can cause 5 4 20 goggles ,face mask, hand
silicosis . gloves )
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : REINFORCEMENT
Sl ACTIVITY (JOB STEPS IN HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK CONTROLLED RISK FINAL RESPONSIBILIT
No SEQUENCE) RATING ASSESSMENT Y
2 Unloading a)Fall of the load 1.The Crane capacity should be tested before
body injury/ Property lifting the load.
4 5 20 2.The weight being lifted should be less than 2 2 4 TOLERABLE ACCEPTABLE SITE ENGINEER/
damage MANAGER
crane capacity.
b)Hitting of 1.The ends of the load should be tied with rope Name:
personnel due to to control the sway.
way. Contact no:
2.The workman should use proper PPE.
body injury/ Property
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
damage 3.The work should be carried out under proper
supervision.
4.Stack material on sleeper after loading.
3 a) Fall of the steel 1.The weight being lifted should be less than
Placing of Reinforcement Steel
bar men capacity.
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
2.The workman should use proper PPE.
body injury/ Property
b)Hitting of damage 1.The ends of the load should be tied with rope
personnel due to to control the sway.
way. 3 3 9 2 2 4 TOLERABLE ACCEPTABLE
2.The workman should use proper PPE.
Name
Designation
Page 15 of 40
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE :Assembly of structural steel
PROB SEV CONTROLL FINAL
Sl ACTIVITY (JOB STEPS CONSEQ RESPON
HAZARDS/RISK PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE ABILI ERIT RISK ED RISK ASSESSMEN
No IN SEQUENCE) UENCES SIBILITY
TY Y RATING T
1 Unloading the item 1.Crane failure 1. Ensure the crane and load
parts of length 10- 2.Sling Failure lifting appliances are load tested
12m (variable) from because of loose D and certified by a competent
the Trailer/ Tractor shackles, broken person and available with valid
sling etc documents.
3. Body part caught 2. Ensure proper training
in between. imparted to workers like riggers,
4. Fall of the entire Body signalman, fitters, welders and
load and injury to the injury/ 4 3 12 helpers. 2 2 4 TOLERABLE ACCEPTABLE
Property
persons near by. damage 3. Ensure proper supervision.
4. Use proper SWL rated slings&
‘D’ shackles
5. Ensure that the max safe load
of the crane is more than the
weight of the load to be lifted.
6. Use Proper PPE (viz., Safety
Helmet, Safety Shoe, Hand Gloves
etc.)
2 Assembling of 1.Body parts caught 1. Proper clearance (of both Site
Column parts to in between persons and objects) should be Engineer /
Manager
form a 40m-length 2.Shock Hazard ensured in the vicinity.
part by welding. 3.Radiation 2.Proper Earthing
4.Flash (Eye injury) Body 3. Welding glass should be free
injury/ from damage.
Property
5 4 20 4. The welding machine should be 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : PCC / SCREED
CONTROLLE
Sl ACTIVITY (JOB STEPS IN PROBABI PROBABI FINAL RESPONSIBI
HAZARDS/RISK CONSEQUENCES SEVERITY RISK PRESENT CONTROL MEASURE SEVERITY RISK D RISK
No SEQUENCE) LITY LITY ASSESSMENT LITY
RATING
1 Placing of concrete Due to tool and tacles Use proper PPE.
by manualy improper handeling body injury/
Property 4 5 20 2 2 4 TOLERABLE ACCEPTABLE
damage
body injury/
Property 4 4 16 3. When the floor is in up 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Rainforcemant /Structural Material loading & unloading by crane from trailer,truck .
3 Loading and unloading of a) Fall of material due to 1)Load should known and
material with crane damage D-shackle,sling according to it sling should be
and pulley. selected .
2) Inspect all slings, 2 2 4 TOLERABLE ACCEPTABLE
D-shackle for any wear and tear
before its use .
e) Collision of lifted material body injury/ 1) before carrying of the lifting Site Engineer /
with other material resulting Property operation check the route that the Manager
in material damage. damage material has to be lifted. 2 2 4 TOLERABLE ACCEPTABLE
3 5 15
2) Signalman should give proper
signal to crane operator 2 2 4 TOLERABLE ACCEPTABLE
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Loading and Unloading Structural Material
Sl ACTIVITY (JOB STEPS CONTROLLED FINAL
HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
No IN SEQUENCE) RISK RATING ASSESSMENT
1 Positioning of crane/Hydra a) Accident due to 1) Training to signalman should be
collision with personnel . ensured before taking up the work. 2 2 4 TOLERABLE ACCEPTABLE
body injury/
3 4 12
Property damage 2) Signalman should give proper
signal to crane operator 2 2 4 TOLERABLE ACCEPTABLE
3 Loading and unloading of a) Fall of material due to 1) Inspect all slings, D-shackle for
material with crane damage D-shackle,sling any wear and tear before its use .
and pulley. 2 2 4 TOLERABLE ACCEPTABLE
e) Collision of lifted body injury/ 1) before carrying of the lifting Site Engineer /
material with other Property damage operation check the route that the Manager
material resulting in material has to be lifted. 2 2 4 TOLERABLE ACCEPTABLE
material damage.
3 5 15
2) Signalman should give proper
signal to crane operator 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : BACK FILLING FORMAT NO:
Sl ACTIVITY (JOB STEPS IN HAZARDS/RISK CONSEQUEN PROBABI SEVERITY RISK PRESENT CONTROL MEASURE PROBABIL SEVERITY RISK CONTROLLED FINAL RESPONSIBI
No SEQUENCE) CES LITY ITY RISK RATING ASSESSMENT LITY
1 Clearing of site Tripping and cut injury 1. The area should be surveyed for
during housekeeping tripping hazards and workers shall be
Body injury/ briefed for the hazard.
Property 2 2 4 1 2 2 TOLERABLE ACCEPTABLE
damage 2. All persons working shall use PPE's
like helmet, shoes etc.
2 Backfilling by mechanical m/c & 1. Injury due to tools and 1. Experienced persons shall be
manualy tackles. deployed who are aware of handling
Body injury/ backfilling tools.
Property 5 5 25 2 2 4 TOLERABLE ACCEPTABLE Site Engineer /
damage 2. All persons working shall use PPE's Manager
like helmet, shoes etc.
Name
Designation
Page 24 of 40
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : EXCAVATION FOR BUND WALL FORMAT NO:
1 Clearing of site Tripping and cut injury 1) The area should be surveyed for tripping
hazards and workers shall be briefed for the
hazard.
Body
injury/Property 2 3 6 2 2 4 TOLERABLE ACCEPTABLE
damage
2)All persons working shall use PPE's like
helmet ,shoes etc.
2 Excavation 1) Injury due to tools and tackles. 1) Experienced persons shall be deployed who
are aware of handling excavation tools.
Body
injury/Property 3 2 6 2 2 4 TOLERABLE ACCEPTABLE
damage 2) Safe distance between crew members to be
maintained to avoid hit injury.
Site Engineer / Manager
5) Land slide due to bad 1) Keep 'Danger' sign board and cordon off the
weather/loose nature of soil Body injury 2 2 4 hazardous area. 2 2 4 TOLERABLE ACCEPTABLE
6) Body injury due to fall from 1) Use ladder with guard which is to be secure at
ladder. bottom and top by using mechanized (slips)
means.
Site Engineer / Manager
2)Ladder should be properly stacke at required
Body injury 3 2 6 angle. 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : EXCAVATION
1 Clearing of site Tripping and cut injury 1) The area should be surveyed for
Body tripping hazards and workers shall be
injury/Pro
4 4 16 briefed for the hazard. 2 2 4 TOLERABLE ACCEPTABLE
perty
damage 2)All persons working shall use PPE's
like helmet ,shoes etc.
2 Excavation 1) injury due to tools and 1) experienced persons shall be
tackles. deployed who are aware of handling
Body excavation tools.
injury/Pro
5 5 25 2 2 4 TOLERABLE ACCEPTABLE
perty 2) Safe distance between crew
damage members to be maintained to avoid hit
injury.
Fatal
5) Provide benching where depth is
more than 3 mtrs. Keep area de-
watered at all time.
6) control wats flow.
d) fall of person due 1) impart safety instruction to all
to leaving the worker to guard against fall.
excavated area
ovenight Minor 2)proper demarcation around the pit
injury / 5 5 25 by tape/lighting and cordoning off the 2 2 4 TOLERABLE ACCEPTABLE
f) Body injury due to 1) use ladder with guard which is to be Site Engineer / Manager
fall from ladder. secure at bottom and top by using
mechanized (slips) means.
Minor
injury / 5 5 25 2)ladder should be tied from the top 2 2 4 TOLERABLE ACCEPTABLE
Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Dismantling of Overhead gantry crane FORMAT NO:
ACTIVITY CONTROLLED
Sly FINAL
(JOB STEPS IN HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
No ASSESSMENT
SEQUENCE) RATING
1 Pre-cleaning of crane and Hand injury / Inhalation of 1)Area shall have adequate clean and Tolerable ACCEPTABLE
near area . gas/Dust proper housekeeping .
Body injury 3 2 6 2)Use of PPE (Hand gloves, 2 1 2
Mask , Goggles)
2 Dismantled of Hook along Improper Selection of 1)Load should known and according to Tolerable ACCEPTABLE
with the wire ropes. sling , ,Material fall or fall it sling should be selected .
of person if not proper 2)Personr should be well
material handleling . trained .
Body injury 3 3 9 2 2 4
3)Proper tool should be used for
dismantled.
3)Use of PPE
(Hand gloves, Goggles , etc) .
3 Dismantling the main IF Proper supervision for 1)Skilled supervisor for the job. Tolerable ACCEPTABLE
trolley. the job is not done can 2)Use guide rope while shifting of
cause fall of material , members with crane Site Engineer / Project
person /body injury Body injury 3 3 9 3)Use of PPE (Hand gloves, Mask , 1 2 2 Manager
Goggles) .
4 Dismantled main beams IF Proper supervision for 1)Skilled supervisor for the job. Tolerable ACCEPTABLE
and Shifting of material. the job is not done can 2)Use guide rope while shifting of
cause fall of material , Body injury /Death 4 4 16 members with crane 2 2 4
person /body injury 3)Use of PPE (Hand gloves, Mask ,
Goggles) .
5 Post Cleaning Hand injury / Inhalation of Use of PPE (Hand gloves, Mask , Tolerable ACCEPTABLE
gas/Dust Goggles)
Body injury / Fume Site Engineer / Project
2 3 6 1 2 2 Manager
mist inhalation
Name
Designation
Work at Height
Hazard Identifi
JOB TITLE : Work at Height
ACTIVITY (JOB
S.
STEPS IN HAZARDS/RISK
No
SEQUENCE)
1 Lifting of
Shuttering
Material
&Reinforcement
at coloum.
2 Reinforcement
placing & binding
Page 30
Work at Height
3 Shuttering
Page 31
Work at Height
SIMPLEX INFRASTRUCTUR
TATA HOUSING PROJECT, SEC –
Hazard Identification & Risk Assessment and Co
CONSEQUEN PROBABILI
SEVERITY RISK
CES TY
Serious
injury or 5 5 25
Fatality Page 32
Work at Height
Serious
injury or 5 5 25
Fatality
Page 33
Work at Height
y: Rajiv Singh
Page 34
Work at Height
X INFRASTRUCTURES LIMITED
NG PROJECT, SEC – 72, GURGAON.
Assessment and Control Measure Worksheet (HIRA)
PROBABILI
PRESENT CONTROL MEASURE SEVERITY
TY
2 2
Page 35
Work at Height
2 2
Page 36
Work at Height
2 2
Approved By: S. K
Page 37
Work at Height
et (HIRA)
FINAL
CONTROLLED RESPONSIBIL
RISK ASSESS
RISK RATING ITY
MENT
ACCEPT
4 TOLERABLE
ABLE
Site
Engineer /
Page 38
Manager
Work at Height
Site
ACCEPT Engineer /
4 TOLERABLE Manager
ABLE
Page 39
Work at Height
ACCEPT
TOLERABLE
ABLE
ACCEPT
4 TOLERABLE
ABLE
Page 40