MRS Format

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

Doc. No.

: ( R0) Date : 02/06/2021 Page 01 Of 01


Material Reconciliation Statement- Plumbing Divertor
Project : Month : Up to 02.06.2021 Ra Bill No : RA 06
Excess Action
Theortical Reasons
Average Total Actual Difference in Infra Allowable Excess Wastage Suggested to
No. Description Unit Closing Stock consumption as Wastage Wastage in % for Excess
Rate Receipt Consumption Quantity (site) Wastage% Wastage % Amount in Prevent Excess
per Statement -2 Wastage
Lacs Wastage
10=
1 2 3 4 5 6 7= (5-6) 8 9= (7-8) 11 12= (10-11) 13 14 15
((9/8)x100)

1 Nos 0.00 0.00 0.00 0.00 #DIV/0! 0.00 #DIV/0! #DIV/0!

Sign of QS Engineer Sign. Of Project Incharge


Density M-10 M-20 M-25 M-30 M-35
Kg 50Kg/28.8Bag Kg 50Kg/28.8Bag
Cement 1440.00 228 4.56 251 5.02 279 5.58 309 6.18 345 6.90
Flyash 800.00 80 0.10 90 0.11 100 0.13 110 0.14
20 mm 1550.00 821 0.53 725 0.47 736 0.47 682 0.44 717 0.46
10mm 1570.00 547 0.35 483 0.31 490 0.31 555 0.35 478 0.30
Sand 1620.00 684 0.42 706 0.44 642 0.40 664 642 0.40
M-40

391 7.82
130 0.16
702 0.45
468 0.30
600 0.37