PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

0+000 1.000
20 20 0.500 15.00
40 20 6.200 62.00 5.00
60 20 4.900 111.00
80 20 6.300 112.00
10 20 0.900 0.600 72.00 6.00
12 20 1.800 0.400 27.00 10.00
14 20 0.200 0.600 20.00 10.00
16 20 0.100 1.100 3.00 17.00
18 20 0.500 0.400 6.00 15.00
20 20 0.800 0.800 13.00 12.00
22 20 0.900 0.400 17.00 12.00
24 20 0.200 0.500 11.00 9.00
26 20 0.200 0.100 4.00 6.00
28 20 0.800 10.00 1.00
30 20 2.900 37.00
32 20 1.200 41.00
34 20 0.200 0.600 14.00 6.00
36 20 0.500 0.500 7.00 11.00
38 20 0.900 14.00 5.00
40 20 3.100 40.00
42 20 2.700 58.00
44 20 3.800 65.00
46 20 1.800 56.00
48 20 2.300 41.00
50 20 4.800 71.00
52 20 2.000 68.00
54 20 3.400 54.00
56 20 1.800 52.00
58 20 1.600 34.00
60 20 6.700 83.00
62 20 0.500 72.00
64 20 1.300 0.100 18.00 1.00
66 20 3.000 13.00 31.00
68 20 2.600 26.00 30.00
70 20 1.000 36.00
72 20 2.700 37.00
74 20 5.800 85.00
76 20 2.800 86.00
78 20 1.900 47.00
80 20 3.000 49.00
82 20 2.300 53.00
84 20 0.100 1.200 24.00 12.00
86 20 1.200 13.00 12.00
88 20 0.500 17.00
90 20 1.600 21.00
92 20 2.900 45.00
94 20 2.000 0.100 49.00 1.00
96 20 2.400 44.00 1.00
98 20 3.200 56.00
1+000 20 0.700 39.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 6.600 73.00
4 20 5.000 116.00
6 20 2.600 76.00
8 20 0.400 1.200 30.00 12.00
10 20 0.500 9.00 12.00
12 20 1.200 17.00
14 20 2.400 36.00
16 20 1.100 35.00
18 20 1.200 0.200 23.00 2.00
20 20 1.500 27.00 2.00
22 20 3.100 46.00
24 20 3.400 65.00
26 20 2.100 55.00
28 20 16.300 184.00
30 20 0.300 0.500 166.00 5.00
32 20 0.200 0.400 5.00 9.00
34 20 2.000 1.000 22.00 14.00
36 20 0.200 22.00 10.00
38 20 0.100 0.300 3.00 3.00
40 20 2.000 21.00 3.00
42 20 0.100 1.500 21.00
44 20 5.600 1.400 57.00
46 20 5.000 106.00
48 20 2.100 71.00
50 20 1.000 1.200 31.00 12.00
52 20 0.600 0.200 16.00 14.00
54 20 0.350 0.400 9.50 6.00
56 20 0.500 8.50 4.00
58 20 0.300 0.350 8.00 3.50
60 20 1.900 22.00 3.50
62 20 5.500 74.00
64 20 1.100 66.00
66 20 1.800 29.00
68 20 3.500 53.00
70 20 0.600 41.00
72 20 1.400 20.00
74 20 4.000 54.00
76 20 1.300 53.00
78 20 1.300 0.200 26.00 2.00
80 20 1.400 27.00 2.00
82 20 10.600 120.00
84 20 1.600 0.100 122.00 1.00
86 20 0.600 22.00 1.00
88 20 2.600 32.00
90 20 2.000 0.200 46.00 2.00
92 20 3.500 55.00 2.00
94 20 1.100 0.100 46.00 1.00
96 20 0.400 15.00 1.00
98 20 4.00
2+000 20 0.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 0.300 0.900 3.00 9.00


4 20 3.00 9.00
6 20 0.100 0.000 1.00 0.00
8 20 1.00 0.00
10 20 0.00
12 20 0.000 0.000 0.00 0.00
14 20 1.600 0.000 16.00 0.00
16 20 0.200 0.000 18.00 0.00
18 20 0.000 0.000 2.00 0.00
20 20 0.000 0.00 0.00
22 20 0.00
24 20 0.000 0.000 0.00 0.00
26 20 0.00 0.00
28 20
30 20
32 20
34 20 0.000 0.000 0.00 0.00
36 20 0.00 0.00
38 20 0.000 0.000 0.00 0.00
40 20 0.000 0.000 0.00 0.00
42 20 0.000 0.000 0.00 0.00
44 20 0.000 0.000 0.00 0.00
46 20 0.000 0.000 0.00 0.00
48 20 0.000 0.000 0.00 0.00
50 20 0.000 0.00 0.00
52 20 0.000 0.00
54 20 0.000 0.00
56 20 0.000 0.000 0.00 0.00
58 20 0.000 0.000 0.00 0.00
60 20 0.00 0.00
62 20
64 20
66 20
68 20
70 20
72 20 0.000 0.000 0.00 0.00
74 20 0.000 0.000 0.00 0.00
76 20 0.000 0.00 0.00
78 20 0.00
80 20 0.00
82 20 0.000 0.000 0.00 0.00
84 20 0.000 0.000 0.00 0.00
86 20 0.00 0.00
88 20
90 20
92 20 0.000 0.00
94 20 0.000 0.00
96 20 0.000 0.00
98 20 0.000 0.00
3 + 000 20 0.000 0.000 0.00 0.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 0.000 0.000 0.00 0.00


4 20 0.000 0.000 0.00 0.00
6 20 0.000 0.000 0.00 0.00
8 20 0.000 0.000 0.00 0.00
10 20 0.000 0.000 0.00 0.00
12 20 0.000 0.00 0.00
14 20 0.000 0.000 0.00 0.00
16 20 0.000 0.000 0.00 0.00
18 20 0.000 0.00 0.00
20 20 0.000 0.00
22 20 0.000 0.00
24 20 0.000 0.000 0.00 0.00
26 20 0.00 0.00
28 20 0.000 0.00
30 20 0.000 0.00
32 20 0.000 0.00
34 20 0.000 0.000 0.00 0.00
36 20 0.000 0.000 0.00 0.00
38 20 0.00 0.00
40 20
42 20 0.000 0.00
44 20 0.000 0.00
46 20 0.000 0.000 0.00 0.00
48 20 0.000 0.000 0.00 0.00
50 20 0.000 0.00 0.00
52 20 0.000 0.00
54 20 0.000 0.00
56 20 0.000 0.00
58 20 0.000 0.00
60 20 0.000 0.00
62 20 0.00
64 20
66 20 0.000 0.00
68 20 0.000 0.00
70 20 0.000 0.00
72 20 0.000 0.000 0.00 0.00
74 20 0.000 0.000 0.00 0.00
76 20 0.000 0.000 0.00 0.00
78 20 0.000 0.00 0.00
80 20 0.000 0.00
82 20 0.00
84 20 0.000 0.00
86 20 0.000 0.00
88 20 0.000 0.00
90 20 0.000 0.00
92 20 0.000 0.000 0.00 0.00
94 20 0.000 0.00 0.00
96 20 0.000 0.00
98 20 0.000 0.00
4+000 20 0.000 0.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 0.000 0.00
4 20 0.000 0.000 0.00 0.00
6 20 0.000 0.00 0.00
8 20 0.000 0.00
10 20 0.000 0.00
12 20 0.000 0.00
14 20 0.000 0.00
16 20 0.000 0.00
18 20 0.000 0.00
20 20 0.000 0.00
22 20 0.000 0.00
24 20 0.000 0.000 0.00 0.00
26 20 0.000 0.00 0.00
28 20 0.000 0.00
30 20 0.000 0.000 0.00 0.00
32 20 0.000 0.000 0.00 0.00
34 20 0.000 0.00 0.00
36 20 0.000 0.00
38 20 0.000 0.00
40 20 0.000 0.00
42 20 0.000 0.00
44 20 0.000 0.00
46 20 0.000 0.000 0.00 0.00
48 20 0.00 0.00
50 20
52 20
54 20
56 20
58 20
60 20
62 20
64 20
66 20
68 20 0.000 0.00
70 20 0.000 0.00
72 20 0.000 0.00
74 20 0.000 0.00
76 20 0.000 0.00
78 20 0.000 0.000 0.00 0.00
80 20 0.00 0.00
82 20
84 20
86 20
88 20
90 20 0.000 0.000 0.00 0.00
92 20 0.000 0.00 0.00
94 20 0.000 0.000 0.00 0.00
96 20 0.000 0.000 0.00 0.00
98 20 0.000 0.00 0.00
5+000 20 0.000 0.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 0.000 0.00
4 20 0.00
6 20 0.000 0.00
8 20 0.000 0.00
10 20 0.000 0.000 0.00 0.00
12 20 0.000 0.000 0.00 0.00
14 20 0.000 0.000 0.00 0.00
16 20 0.100 1.00 0.00
18 20 1.100 0.000 12.00 0.00
20 20 11.00 0.00
22 20
24 20
26 20 0.800 0.000 8.00 0.00
28 20 0.300 0.000 11.00 0.00
30 20 1.500 18.00 0.00
32 20 2.700 42.00
34 20 1.600 43.00
36 20 0.800 0.000 24.00 0.00
38 20 1.300 21.00 0.00
40 20 0.800 21.00
42 20 1.400 0.000 22.00 0.00
44 20 2.600 40.00 0.00
46 20 0.400 0.000 30.00 0.00
48 20 1.000 14.00 0.00
50 20 1.600 26.00
52 20 1.200 28.00
54 20 3.200 44.00
56 20 1.600 48.00
58 20 1.200 28.00
60 20 1.200 0.000 24.00 0.00
62 20 1.500 0.000 27.00 0.00
64 20 3.900 0.700 54.00 7.00
66 20 1.300 0.300 52.00 10.00
68 20 1.400 27.00 3.00
70 20 0.500 19.00
72 20 1.200 17.00
74 20 0.100 0.100 13.00 1.00
76 20 0.900 0.400 10.00 5.00
78 20 0.900 0.100 18.00 5.00
80 20 0.600 15.00 1.00
82 20 0.700 13.00
84 20 2.700 34.00
86 20 0.900 0.300 36.00 3.00
88 20 1.900 28.00 3.00
90 20 3.100 50.00
92 20 1.300 0.200 44.00 2.00
94 20 13.00 2.00
96 20
98 20 1.500 15.00
6+000 20 0.600 0.600 21.00 6.00
PLANILA DE METRADOS DE MOVIMIENTO DE TIERRAS

PROYECTO : MEJORAMIENTO CANAL SHUNTURCANCHA

ESTACA DIST. Area Corte Area Rell. VOLUMEN DE CORTE (M3.) VOLUMEN
(ML.) (M2.) (M2.) Tierra Suelta Roca Suelta Roca Fija RELLENO (M3.)

2 20 1.100 17.00 6.00


4 20 1.600 0.100 27.00 1.00
6 20 1.300 0.200 29.00 3.00
8 20 0.100 0.300 14.00 5.00
10 20 1.000 11.00 3.00
12 20 2.400 34.00
14 20 3.400 58.00
16 20 34.00
18 20
20 20
22 20
24 20 0.400 0.500 4.00 5.00
26 20 30.700 311.00 5.00
28 20 68.000 987.00
30 20 51.000 1190.00
32 20 510.00
34 20
36 20
38 20 1.400 14.00
40 20 0.400 18.00
42 20 66.000 660.00 4.00
44 20 76.000 1420.00
46 20 29.500 1055.00
48 20 0.200 2.700 297.00 27.00
50 20 2.00 27.00
52 20
54 20
56 20
58 20 1.500 0.300 15.00 3.00
60 20 5.300 68.00 3.00
62 20 0.500 53.00 5.00
64 20 2.800 0.500 28.00 10.00
66 20 5.500 83.00 5.00
68 20 2.300 78.00
70 20 0.100 0.100 24.00 1.00
72 20 0.100 0.300 2.00 4.00
74 20 0.800 0.150 9.00 4.50
76 20 0.300 11.00 1.50
78 20 1.100 14.00
80 20 0.900 0.150 20.00 1.50
82 20 1.600 0.100 25.00 2.50
84 20 1.600 32.00 1.00
86 20 1.500 0.100 31.00 1.00
88 20 1.300 0.250 28.00 3.50
90 20 1.400 0.200 27.00 4.50
92 20 1.800 32.00 2.00
94 20 0.100 0.200 19.00 2.00
96 20 0.600 7.00 2.00
98 20 2.100 0.300 27.00 3.00
7+000 20 1.400 0.300 35.00 6.00
TOTAL 10,854.00 173.00 1,686.00 605.00
HOJA DE METRADOS-BOCATOMA

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
BOCATOMA 01.03.01 EXCAVACION EN MATERIAL SUELTO
MURO DE ENCAUZAMIENTO MARG. DERECHA 1.00 11.45 1.90 0.80 17.40 17.40 M3
0.40 01.04.07 ENCOFRADO Y DESENCOFRADO
11.45 I 1.00 11.45 3.40 38.93
II 1.00 11.45 3.40 38.93
III 2.00 11.45 0.50 11.45 89.31 M2
II
01.04.04 CONCRETO F'C = 175 Kg/Cm2 + 30% P.G.
I a 1.00 11.45 0.50 3.40 19.47
3.40 I a II
b 1.00 11.45 0.60 0.50 3.44
a c 1.00 11.45 0.70 0.50 4.01
d 1.00 11.45 0.60 0.13 0.86
0.25 d d
III 0.50 e 1.00 11.45 0.60 0.25 1.72 29.48 M3
c
0.25 e bb 01.03.02 RELLENO CON MATERIAL PROPIO
a 1.00 11.45 0.40 0.50 2.29

0.60 d 1.00 11.45 0.50 0.50 2.86 5.15 M3


0.60 0.70
01.04.06 SOLADO PARA ZAPATAS
1.00 26.80 1.90 50.92 50.92 M2
MURO DE ENCAUZAMIENTO MARG. DERECHA 01.03.01 EXCAVACION EN MATERIAL SUELTO
0.40 1.00 9.75 1.90 0.80 14.82 14.82 M3
01.04.07 ENCOFRADO Y DESENCOFRADO
I 1.00 9.75 3.40 33.15
3.40 II 1.00 9.75 3.40 33.15
III
III 2.00 9.75 0.50 9.75 76.05 M2
I
II 0.25 01.04.04 CONCRETO F'C = 175 Kg/Cm2 + 30% P.G.
9.75 a a 1.00 9.75 0.50 3.40 16.58
b 1.00 9.75 0.60 0.50 2.93
c 1.00 9.75 0.60 0.25 1.46
e
d 1.00 9.75 0.70 0.50 3.41
III d b c 0.25 e 1.00 9.75 0.25 0.13 0.30 24.68 M3
01.03.02 RELLENO CON MATERIAL PROPIO
e 1.00 9.75 0.30 0.60 1.76
0.70 0.60 0.60 d 1.00 9.75 0.70 0.30 2.05 3.80 M3

MURO AGUAS ABAJO DE LA COMP. DE LIMPIA 01.03.01 EXCAVACION EN MATERIAL SUELTO


1.00 1.50 1.80 0.70 1.89 1.89 M3
0.40 1.00 0.40 01.05.04 ENCOFRADO Y DESENCOFRADO
I 2.00 1.50 3.10 9.30
1.50
II 2.00 1.50 3.60 10.80 20.10 M2
I 01.05.01 CONCRETO F'C = 175 Kg/Cm2
3.10 a 2.00 1.50 3.10 0.40 3.72
II
b 1.00 1.50 1.80 0.40 1.08 4.80 M3
a
a

0.50
b

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 2
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
MURO AGUAS ABAJO DE LA COMP. DE LIMPIA 01.03.01 EXCAVACION EN MATERIAL SUELTO
b 1.00 2.20 1.80 0.70 2.77
0.40 1.00 0.40 d 1.00 2.30 1.80 0.70 2.90 5.67 M3
01.05.04 ENCOFRADO Y DESENCOFRADO
2.20
I 2.00 2.20 2.55 11.22
I 2.00
II II 2.00 2.20 3.05 13.42
a 3.10 a III 2.00 2.30 2.00 9.20

0.50 b 0.40 1.00 0.40 IV 2.00 2.30 2.50 11.50 45.34 M2


01.05.01 CONCRETO F'C = 175 Kg/Cm2
2.30
a 2.00 2.20 2.55 0.40 4.49
2.00
III IV b 1.00 2.20 1.80 0.50 1.98
c c c 2.00 2.30 2.00 0.40 3.68
0.50 d d 1.00 2.30 1.80 0.50 2.07 12.22 M3

MURO AGUAS ABAJO DE LA COMP. DE LIMPIA 01.03.01 EXCAVACION EN MATERIAL SUELTO


0.40 1.00 5.60 1.90 0.80 8.51 8.51 M3
01.04.07 ENCOFRADO Y DESENCOFRADO
I 1.00 5.60 2.40 13.44
2.40 II 1.00 5.60 2.40 13.44
III
III 2.00 5.60 0.50 5.60 32.48 M2
I
II 0.25 01.04.04 CONCRETO F'C = 175 Kg/Cm2 + 30% P.G.
5.60 a a 1.00 5.60 0.50 2.40 6.72
b 1.00 5.60 0.60 0.80 2.69
c 1.00 5.60 0.25 0.25 0.35
e
d 1.00 5.60 0.70 0.50 1.96
III d b c 0.25 e 1.00 5.60 0.25 0.13 0.18 11.89 M3
01.03.02 RELLENO CON MATERIAL PROPIO
e 1.00 5.60 0.60 0.25 0.84
0.70 0.60 060 d 1.00 5.60 0.70 0.30 1.18 2.02 M3

BOCAL DE CAPTACION(Ventana de Captación) 01.03.01 EXCAVACION EN MATERIAL SUELTO


Muros 1.00 1.90 1.25 1.10 2.61
Pisos 1.00 2.10 0.65 0.50 0.68 3.30 M3
0.40
1.50 01.05.04 ENCOFRADO Y DESENCOFRADO
I 2.00 1.90 3.40 12.92 12.92 M2
0.25 I 01.05.01 CONCRETO F'C = 175 Kg/Cm2
0.60 c a 1.00 1.50 3.40 0.30 1.53
3.40
0.50 b 1.00 1.50 1.25 0.60 1.13
N.T c(Pisos) 1.00 0.20 3.40 0.25 0.17 2.83 M3
a

b 0.60 01.03.02 RELLENO CON MATERIAL PROPIO


0.50 2.00 1.90 0.50 0.50 0.95 0.95 M3
0.50 01.04.06 SOLADO PARA ZAPATAS
1.00 1.90 1.25 2.38 2.38 M2

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha:Agost-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 3
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
MURO AGUAS ABAJO DE LA COMP. DE REGUL. 01.03.01 EXCAVACION EN MATERIAL SUELTO
b 1.00 1.75 1.40 0.70 1.72
0.20 1.00 0.20 d 1.00 1.20 1.40 0.70 1.18 2.89 M3
01.05.04 ENCOFRADO Y DESENCOFRADO
1.75
I 2.00 1.75 2.15 7.53
I 1.20
II II 2.00 1.75 2.35 8.23
a 3.10 a III 2.00 1.20 3.10 7.44

0.20 b 0.20 1.00 0.20 IV 2.00 1.20 3.30 7.92 31.11 M2


01.05.01 CONCRETO F'C = 175 Kg/Cm2
1.20
a 2.00 1.75 2.15 0.20 1.51
3.10
III IV b 1.00 1.75 1.40 0.20 0.49
c c c 2.00 1.20 3.10 0.20 1.49
0.20 d d 1.00 1.20 1.40 0.20 0.34 3.82 M3
01.04.03 MAMPOSTERIA DE PIEDRA e=0.25 m en C.S. F'c= 175 Kg/cm2
1.00 1.75 1.40 2.45
1.00 1.20 1.40 1.68 4.13 M2

CANAL DE ADUCCON 01.03.01 EXCAVACION EN MATERIAL SUELTO


2.00 4.50 0.60 0.50 2.70
0.20 0.60 0.20
1.00 4.50 1.40 0.15 0.95 3.65 M3
01.04.07 ENCOFRADO Y DESENCOFRADO
II a I a I 2.00 4.50 1.20 10.80
II 2.00 4.50 1.35 12.15 22.95 M2
b 01.04.01 CONCRETO F'C = 175 Kg/Cm2
1.20
b 1.00 4.50 0.60 0.15 0.41 0.41 M3
01.04.05 CONCRETO F'C = 175 Kg/Cm2 + 25% PM
0.15 a 2.00 4.50 0.35 1.35 4.25
0.50 c 4.50 c 2.00 4.50 0.60 0.50 2.70 6.95 M3
0.60 0.60
01.03.02 RELLENO CON MATERIAL PROPIO
c 1.00 13.00 1.00 0.65 8.45 8.45 M3
01.04.03 MAMPOSTERIA DE PIEDRA e=0.25 m en C.S. F'c= 175 Kg/cm2
1.00 4.50 0.60 2.70 2.70 M2

CANAL DE ADUCCON 01.03.01 EXCAVACION EN MATERIAL SUELTO


2.00 6.50 0.60 0.50 3.90
0.20 0.60 0.20
1.00 6.50 1.00 0.15 0.98 4.88 M3
01.04.07 ENCOFRADO Y DESENCOFRADO
II a I a I 2.00 6.50 1.00 13.00
II 2.00 6.50 1.15 14.95 27.95 M2
b 01.04.01 CONCRETO F'C = 175 Kg/Cm2
1.00
b 1.00 6.50 0.60 0.15 0.59 0.59 M3
01.04.05 CONCRETO F'C = 175 Kg/Cm2 + 25% PM
0.15 a 2.00 6.50 0.35 1.15 5.23
0.50 c 6.50 c 2.00 6.50 0.60 0.50 3.90 9.13 M3
0.60 0.60

01.07.02 JUNTAS WATER STOP DE 6"


2.00 3.00 6.00 6.00 ML
01.07.01 JUNTAS ASFALTICAS E = 1"
1.00 6.00 6.00 6.00 ML

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 4
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
BARRAJE FIJO 01.03.01 EXCAVACION MASIVA A MAQUINA
1.00 5.50 6.60 2.45 88.94
88.94 M3
1.50
01.04.07 ENCOFRADO Y DESENCOFRADO
4.00 I 1.00 6.60 2.30 15.18
6.60
d II 2.00 5.50 1.35 14.85
I
c III 1.00 6.60 1.80 11.88
III 41.91 M2
1.35 II 1.20 01.04.04 CONCRETO F'C = 175 Kg/Cm2 + 30% P.G.
1.80 a 2.30
a 1.00 6.60 2.30 0.50 7.59
b
1.00 b 1.00 6.60 0.90 1.00 5.94
c 1.00 4.00 6.60 1.35 35.64
0.50 d 1.00 1.50 6.60 1.30 12.87 62.04 M3
0.60

TRAMO INCLINADO(Disipador de Energía) 01.03.01 EXCAVACION MASIVA A MAQUINA


1.00 8.00 7.00 0.80 44.80
7.00 1.00 8.00 1.00 1.50 12.00
8.00 1.00 8.00 1.05 1.50 12.60 69.40 M3
01.04.07 ENCOFRADO Y DESENCOFRADO
I 2.00 7.00 0.80 11.20
I a
II 1.00 8.00 2.30 18.40 29.60 M2
II 1.60 2.30
0.80 01.04.02 MAMPOSTERIA DE PIEDRA e=0.80 m en C.S. F'c= 175 Kg/cm2
1.50
b a 1.00 7.00 9.00 63.00
c
1.50 b 1.00 8.00 1.50 12.00
0.50 c 1.00 8.00 1.50 12.00 87.00 M3
01.03.02 RELLENO CON MATERIAL PROPIO
0.50 1.00 7.00 8.00 0.50 28.00 28.00 M3

EMPEDRADO DE PROTECCION AGUAS ARRIBA Y AGUAS ABAJO


01.03.01 EXCAVACION MASIVA CON MAQUINARIA
1.00 8.00 10.00 0.80 64.00
PLACA 01 1.00 5.00 7.00 0.80 28.00 92.00 M3
01.03.04 EMPEDRADO DE PROTECCION e = 0.80 M
5.00 1.00 8.00 10.00 0.80 64.00
1.00 5.00 7.00 0.80 28.00 92.00 M3
0.40 I
01.05.04 ENCOFRADO Y DESENCOFRADO
3.40
I 2.00 5.00 3.40 17.00 17.00 M2
N.T
01.05.02 CONCRETO F'C = 210 Kg/Cm2
a
a 1.00 5.00 3.40 0.40 6.80
b 1.00 b 1.00 5.00 1.40 1.00 7.00 13.80 M3
0.50
0.50

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 5
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CARPINTERIA MECANICA 01.06.01 COMPUERTA METALICA T-ARMCO 1.00X1.00 M C/MEC. DE IZAJE
Compuerta en barraje móvil 1.00 1.00 1.00
Compuerta en canal vertedor 1.00 UND.

01.06.02 COMPUERTA METALICA T-ARMCO 1.00X0.60 M C/MEC. DE IZAJE


1.00 1.00 1.00
4.00 1.00 UND.

1.00
0.60

1.00 1.00

01.06.03 BARANDAS DE PROTECCION Fº Gº DE 2" X 1.00 ALT.


0.70
6.00 3.50 21.00
8.00 1.15 9.20
0.33
1.15 30.20 ML
0.33

3.50

0.80
01.06.04 REJILLA DE PROTECCION EN LA VENTANA DE CAPTACION FºGº 1"
1.00 0.80 0.70 0.56
0.10 0.56 M2
0.70

01.06.05 REJILLA DE PROTECCION EN BARRAJE MOVIL FºGº 1"


1.00 1.40 1.15 1.61
1.40
1.61 M2

0.20
1.15

01.06.06 REJILLA DE PROTECCION EN VERTEDRO DE ENTRADA FºGº 1"


1.00 2.50 1.00 2.50
2.50 M2

2.50 01.06.07 ESCALERA TIPO GATO 0.30 X 3.10 M FºGº 3/4"


2.00 3.10
1.00 1.00 1.00
1.00 UND

2.50

Tapa Metálica 0.60 x 0.60 m


Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04
HOJA DE METRADOS-DESARENADOR

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
DESARENADOR-ALIVIADERO-CANAL DE LIMPIA 02.02.01 EXCAVACION EN MATERIAL SUELTO
TRANSICION DE ENTRADA Y SALIDA 2.00 1.50 1.15 0.93 3.19
3.19 M3
0.20 0.60 0.20 02.03.01 ENCOFRADO Y DESENCOFRADO
I 4.00 1.50 0.58 3.45
II 2.00 1.90 0.65 2.47

1.00
1.50 5.92 M2
c 0.15 02.03.02 CONCRETO F'C = 175 Kg/Cm2
I I
a 2.00 1.50 0.50 0.10 0.15
b 4.00 1.50 0.38 0.10 0.23
a b
0.60
1
II 0.10 0.38 M3
0.75
0.40 02.06.02 JUNTAS WATER STOP DE 6"
2.00 1.90 3.80 3.80 ML

POZA DECANTACION 02.02.01 EXCAVACION EN MATERIAL SUELTO


1.00 14.00 1.70 1.30 30.94
0.20 0.80 0.20
30.94 M3
14.00
01.04.01 ENCOFRADO Y DESENCOFRADO
I I 2.00 14.00 1.36 38.08
1.22 II 2.00 14.00 1.51 42.28 80.36 M2
II
01.04.02 CONCRETO F'c= 210 Kg/cm2
a 1.50 a a 2.00 14.00 1.36 0.20 7.62
b 1.00 14.00 1.20 0.20 3.36
10.98 M3
0.20 02.02.02 RELLENO CON MATERIAL PROPIO
b
1.00 14.00 1.00 0.80 11.20 11.20 M3

ALIVIADERO 02.02.01 EXCAVACION EN MATERIAL SUELTO


0.30 1.00 0.30
1.00 9.30 0.55 0.50 2.56
0.15
1.50 2.56 M3
02.03.01 ENCOFRADO Y DESENCOFRADO MUROS
0.15 2.50
2.00 9.25 0.85 15.73 15.73 M2
3.80
1.00 02.03.02 CONCRETO F'c= 175 Kg/cm2
a 1.00 9.25 0.85 0.15 1.18
0.15 4.80 0.15 b 1.00 9.30 0.55 0.50 2.56
0.15 c(Pisos) 1.00 4.80 1.00 0.15 0.72
CIMIENTOS = 9.30 ML 1.00 1.65 1.00 0.15 0.25
MUROS = 9.25 ML 4.70 M3
a 0.85
1.00
0.15 c
b 0.50
0.20 0.20

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 2
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CANAL DE LIMPIA 02.02.01 EXCAVACION EN MATERIAL SUELTO
1.50 2.00 4.00 0.30 0.45 1.08
0.80
d
1.08 M3
0.15
02.03.01 ENCOFRADO Y DESENCOFRADO MUROS
0.15
I 2.00 4.00 1.15 9.20
a 3.70 II 2.00 4.15 1.00 8.30

b 17.50 M2
0.30
0.45 0.15
0.30 0.60 0.30

02.03.02 CONCRETO F'c= 175 Kg/cm2


1.50 II a 2.00 4.30 1.00 0.15 1.29
I b 2.00 4.00 0.45 0.30 1.08
0.15 0.50 c(Pisos) 1.00 4.00 0.60 0.15 0.36 2.73 M3
c

ACCESORIOS 02.03.03 MAMPOSTERIA DE PIEDRA e=0.40 m en C.S. F'c= 175 Kg/cm2


d 1.00 1.35 0.80 1.08
1.08 M2

02.05.01 COMPUERTA METALICA C/MECANISMO DE IZAJE DE 0.60 X0.80 M


1.30 1.00 1.00 1.00
1.00 UND

0.80

0.60
Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CAIDA VERTICAL(06 UND) 03.05.02.1 EXCAVACION EN MATERIAL SUELTO
TRAMO DESPUES DE LA TRANSICION ENTRADA 6.00 0.75 1.90 0.60 5.13
6.00 1.80 0.15 0.20 0.32 5.45 M3
03.05.04.1 ENCOFRADO Y DESENCOFRADO
I 12.00 1.50 0.75 13.50
d II 12.00 1.50 0.60 10.80
1.50 d 0.75
III III 24.00 0.15 0.40 1.44 25.74 M2
03.05.04.2 CONCRETO F'C = 210 Kg/Cm2

c a 6.00 1.50 1.30 0.15 1.76


II 0.20
b 12.00 1.50 0.75 0.15 2.03
I c 6.00 1.80 0.15 0.20 0.32
d 12.00 0.95 0.15 0.15 0.26 4.36 M3
b a b 03.05.05.2 JUNTAS WATER STOP E 6"
d 12.00 3.30 39.60 39.60 ML

1.80

TRANSICION DE ENTRADA Y SALIDA 03.05.02.1 EXCAVACION EN MATERIAL SUELTO


0.15 1.50 0.15 12.00 1.00 1.30 0.75 11.70
12.00 1.00 0.25 0.15 0.45 12.15 M3
03.05.03.3 ENCOFRADO Y DESENCOFRADO
I 24.00 1.00 0.30 7.20
c 0.60
1.00 II 12.00 1.90 0.10 2.28
III III 0.15 III 24.00 0.30 0.75 5.40 14.88 M2
I I
d 0.25 e 03.05.03.2 CONCRETO F'C = 175 Kg/Cm2
a 12.00 1.00 0.95 0.10 1.14
a b b 24.00 1.00 0.38 0.10 0.90
0.60
1 c 24.00 0.30 0.15 0.75 0.81
II 0.10 d 12.00 2.10 0.15 0.25 0.95
0.75
0.40 e 24.00 1.00 0.30 0.10 0.72 4.52 M3

POZA DISIPACION 03.05.02.1 EXCAVACION EN MATERIAL SUELTO


0.15 0+300 1.00 1.15 1.80 1.40 2.90
0+400 1.00 1.15 1.80 1.40 2.90
1.50 H1 0+900 1.00 1.15 1.80 1.90 3.93
I
1+100 1.00 1.15 1.80 1.40 2.90
1+600 1.00 1.15 1.80 1.40 2.90
0.15
0.15 1+760 1.00 1.15 1.80 1.90 3.93
III
II
H
19.46 M3
03.05.04.1 ENCOFRADO Y DESENCOFRADO
0.15
I (0+300) 2.00 1.15 1.35 3.11
0.30 II 2.00 1.15 1.40 3.22
III 1.00 1.50 0.65 0.98
0.15 1.00 I (0+400) 2.00 1.15 1.35 3.11
II 2.00 1.15 1.40 3.22
III 1.00 1.50 0.65 0.98
Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 2
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
POZA DISIPACION I (0+900) 2.00 1.15 1.35 3.11
0.15 II 2.00 1.15 1.40 3.22
III 1.00 1.15 0.65 0.75
1.50 H1 I (1+100) 2.00 1.15 1.90 4.37
I
II 2.00 1.15 1.75 4.03
III 1.00 1.50 1.15 1.73
0.15
0.15 I (1+600) 2.00 1.15 1.35 3.11
III II 2.00 1.15 1.40 3.22
II III 1.00 1.50 0.65 0.98
H
I (1+760) 2.00 1.15 1.90 4.37
II 2.00 1.15 1.75 4.03
0.15
III 1.00 1.50 1.15 1.73
0.30 49.21 M2

0.15 1.00

POZA DISIPACION
0.15 03.05.04.2 CONCRETO F'C = 210 Kg/Cm2
a(0+300) 2.00 1.15 1.25 0.15 0.43
1.50 H1 b 6.00 1.15 1.50 0.15 1.55
I a
c 1.00 1.50 0.65 0.15 0.15
d 8.00 1.80 0.15 0.30 0.65
0.15
0.15 a(0+400) 2.00 1.15 1.25 0.15 0.43
III c 1.00 1.50 0.65 0.15 0.15
c a b
II a(0+900) 2.00 1.15 1.25 0.15 0.43
H
c 1.00 1.50 0.65 0.15 0.15
a(1+100) 2.00 1.15 1.75 0.15 0.60
0.15
c 1.00 1.50 1.25 0.15 0.28
0.30 d
a(1+600) 2.00 1.15 1.25 0.15 0.43
c 1.00 1.80 0.65 0.15 0.18
0.15 1.00 a(1+760) 2.00 1.15 1.75 0.15 0.60
c 1.00 1.80 1.25 0.15 0.34 6.37 M3
POZA DE DISIPACION 03.05.02.1 EXCAVACION EN MATERIAL SUELTO
0+100 1.00 1.00 1.80 1.28 2.30
0+400 1.00 1.00 1.80 1.28 2.30
0+900 1.00 1.00 1.80 1.28 2.30
1.00 1+100 1.00 1.00 1.80 1.53 2.75
1+600 1.00 1.00 1.80 1.28 2.30
H1 1+720 1.00 1.00 1.80 1.53 2.75
II 14.68 M3
I 1.00 03.05.04.1 ENCOFRADO Y DESENCOFRADO
I (0+300) 2.00 1.00 1.28 2.55
0.15
II 2.00 1.00 1.13 2.25
0.15 I (0+400) 2.00 1.00 1.28 2.55
1.50 II 2.00 1.00 1.13 2.25
0.15
I (0+900) 2.00 1.00 1.28 2.55
II 2.00 1.00 1.13 2.25
I (1+100) 2.00 1.00 1.53 3.05
II 2.00 1.00 1.38 2.75
Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL DE RIEGO SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 3
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
POZA DISIPACION I (1+760) 2.00 1.00 1.53 3.05
II 2.00 1.00 1.38 2.75 26.00 M2

03.05.04.2 CONCRETO F'C = 210 Kg/Cm2


1.00
a(0+300) 2.00 1.00 1.13 0.15 0.34
a b 6.00 1.00 1.80 0.15 1.62
H1 a(0+400) 2.00 1.00 1.13 0.15 0.34
a II a(0+900) 2.00 1.00 1.13 0.15 0.34
I 1.00 a(1+100) 2.00 1.00 1.38 0.15 0.41
a(1+600) 2.00 1.00 1.13 0.15 0.34
0.15
a(1+760) 2.00 1.00 1.38 0.15 0.41
b 0.15 3.80 M3
1.50
0.15

POZA DISIPACION 03.05.02.1 EXCAVACION EN MATERIAL SUELTO


0.15
0.15 6.00 1.00 1.80 1.35 14.58
1.00 6.00 1.00 0.30 0.15 0.27 14.85 M3

II 03.05.04.1 ENCOFRADO Y DESENCOFRADO


a
I I 12.00 1.00 1.15 13.80
1.00
a II 12.00 1.00 1.00 12.00 25.80 M2
b 03.05.04.2 CONCRETO F'C = 210 Kg/Cm2
0.15 1.80 a 12.00 1.00 1.00 0.15 1.80
b 6.00 1.00 1.80 0.15 1.62
c c 6.00 1.50 0.15 0.15 0.20
1.80 d 6.00 1.00 0.40 0.08 0.18
e
e 6.00 1.80 0.15 0.30 0.49 4.29 M3
d 0.15 1.50
0.30

0.40 0.15

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CANOA(09 UND)
TRANSICION DE ENTRADA Y SALIDA
0.15 0.60 0.15 03.01.03.1 ENCOFRADO Y DESENCOFRADO
I 18.00 2.00 0.33 11.70
11.70 M2

0.65 03.01.03.2 CONCRETO f'c = 175 Kg/Cm2


2.00 a 18.00 2.00 0.50 0.10 1.80
c 0.15 b 36.00 2.00 0.38 0.10 2.70
I I
c 36.00 2.00 0.33 0.10 2.34 6.84 M3

a b
0.60
1

0.75 II 0.10
0.40

CAJA DE CANAL 03.01.02.1 EXCAVACION EN MATERIAL SUELTO


0.15
B=5.50 0.60 0.15 2.00 8.80 1.50 0.40 10.56
B=5.50
B=2.50 3.30+B 3.00 5.80 1.50 0.40 10.44
B=2.50 2.00 6.30 1.50 0.40 7.56
B=2.50 1.00 5.30 1.50 0.40 3.18
B=2.00 II
II 0.65 1.00 5.90 1.50 0.40 3.54 35.28 M3
B=3.00 a
B=2.60
B=3.00 a
03.01.03.1 ENCOFRADO Y DESENCOFRADO
II 4.00 8.80 0.65 22.88
II 6.00 5.80 0.65 22.62
0.40
3.30+B II 4.00 6.30 0.65 16.38
b II 2.00 5.30 0.65 6.89
1.50
II 2.00 5.90 0.65 7.67
76.44 M2

CAJA DE CANAL 03.01.03.2 CONCRETO F'C = 175 Kg/Cm2


0.15
0.60 0.15 a 4.00 8.80 0.65 0.15 3.43
b 2.00 8.80 1.50 0.40 10.56
3.30+B
a 6.00 5.80 0.65 0.15 3.39
II b 3.00 5.80 1.50 0.40 10.44
II 0.65 a 4.00 6.30 0.65 0.15 2.46
a
b 2.00 6.30 1.50 0.40 7.56
a
a 2.00 5.30 0.65 0.15 1.03
b 1.00 5.30 1.50 0.40 3.18
a 2.00 5.90 0.65 0.15 1.15
0.40
3.30+B b 1.00 5.90 1.50 0.40 3.54
b 46.75 M3
1.50

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha:02/08/04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 2
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CAJA DE CANOA 03.01.04.2 ENCOFRADO Y DESENCOFRADO

0.15 0.15 I 4.00 1.70 0.60 4.08


B
H=0.60 I 16.00 1.70 1.00 27.20
H=1.00
H=1.05 I 4.00 1.70 1.05 7.14
H=0.85 I 8.00 1.70 0.85 11.56
H=0.85 1.70 a
I I 4.00 1.70 1.20 8.16
H=1.20
H II 2.00 5.80 1.70 19.72
H=1.00
H=1.00 II II 3.00 2.80 1.70 14.28
H=1.00
B=5.50 0.15 b II 1.00 2.30 1.70 3.91
B=5.50 II 2.00 3.30 1.70 11.22
B=2.50
II 1.00 2.90 1.70 4.93
B=2.50
B=2.50 112.20 M2
B=2.00 03.01.04.1 CONCRETO f'c = 175 Kg/Cm2
B=3.00
B=2.60 a 2.00 1.70 0.60 0.15 0.31
B=3.00 a 8.00 1.70 1.00 0.15 2.04
a 2.00 1.70 1.05 0.15 0.54
a 4.00 1.70 0.85 0.15 0.87
0.15 a 2.00 1.70 1.20 0.15 0.61
0.15 B
H=0.60 b 2.00 1.70 5.80 0.15 2.96
H=1.00
H=1.05 b 3.00 1.70 2.80 0.15 2.14
H=0.85 b 1.00 1.70 2.30 0.15 0.59
H=0.85 1.70 a b 2.00 1.70 3.30 0.15 1.68
H=1.20 I
H b 1.00 1.70 2.90 0.15 0.74
H=1.00
H=1.00 II 12.47 M3
H=1.00
B=5.50 0.15 b
B=5.50
B=2.50
B=2.50
B=2.50
B=2.00
B=3.00
B=2.60
B=3.00

MUROS DE ENCAUZAMIENTO AGUAS ARRIBA Y AGUAS ABAJO 03.01.02.1 EXCAVACION EN MATERIAL SUELTO
H=0.60 9.00 2.50 0.50 0.50 5.63 5.63 M3
0.15
H=1.00 03.01.03.1 ENCOFRADO Y DESENCOFRADO
H=1.05 2.50
H=0.85 I 4.00 2.50 0.60 6.00
H=0.85 I 16.00 2.50 1.00 40.00
H=1.20 a
H=1.00 I 4.00 2.50 1.05 10.50
I H
H=1.00 I 8.00 2.50 0.85 17.00
H=1.00 I 4.00 2.50 1.20 12.00
85.50 M2
0.50
b 03.01.03.2 CONCRETO F'C = 175 Kg/Cm2
a 2.00 2.50 0.60 0.15 0.45
0.50
LOSA Ba a 8.00 2.50 1.00 0.15 3.00
a 2.00 2.50 1.05 0.15 0.79
c 0.15 a 4.00 2.50 0.85 0.15 1.28
a 2.00 2.50 1.20 0.15 0.90
B
b 18.00 2.50 0.50 0.50 11.25
17.66 M3
Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: 02/08/2004
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 3
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
MUROS DE ENCAUZAMIENTO AGUAS ARRIBA Y AGUAS ABAJO 03.01.03.3 MAMPOSTERIA DE PIEDRA EN Co f'c = 175 Kg/Cm2, e = 0.20 M
L1+L2 = 2.50 m c 1.00 3.25 2.50 8.13
Ba = 3.50; 3.20; 2.45; 2.25; 3.25;3.67; 4.50; 6.70; 5.20 c 1.00 2.90 2.50 7.25
B = 3.00; 2.60; 3.00; 2.00; 2.50;2.50; 2.50; 5.50; 5.50 c 1.00 2.73 2.50 6.81
c 1.00 2.13 2.50 5.31
Ba
c 1.00 2.88 2.50 7.19

2.50 c 1.00 3.09 2.50 7.71


0.20 c 1.00 3.50 2.50 8.75
c 1.00 6.10 2.50 15.25
c
c 1.00 6.10 2.50 15.25
81.65 M2
B

En la unión de la transición con el canal 03.01.05.2 JUNTAS WATER STOP


de apoyo de la canoa 18.00 2.20 39.60
39.60 ML

JUNTAS ASFALTICAS e = 1"


0.725 0.725 03.01.05.1 18.00 2.20 39.60
39.60 ML

0.75
Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: 02/08/2004
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
RAPIDA KM 1+340 (L = 100.00 ML) 03.04.02.1 EXCAVACION EN MATERIAL SUELTO
TRANSICION DE ENTRADA Y SALIDA 1.00 2.35 1.40 0.80 2.63
0.20 1.00 0.20 2.63 M3
03.04.03.2 ENCOFRADO Y DESENCOFRADO
I 1.00 2.35 0.30 0.71

0.60 II 2.00 1.90 0.25 0.95


2.35 1.66 M2

I c I 0.15 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2


c a 1.00 2.35 0.70 0.15 0.25
b b 2.00 2.35 0.30 0.15 0.21
a b c 2.00 2.35 0.30 0.15 0.21
0.60
1 0.67 M3

0.75 II 0.15
0.40
03.04.04.2 JUNTAS WATER STOP E 6"
d 4.00 1.90 7.60 7.60 ML

PANTALLA DE PROTECCION 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


2.00 2.40 1.10 0.20 1.06 1.06 M3
0.70 1.00 0.70
03.04.03.2 ENCOFRADO Y DESENCOFRADO
0.20 I 2.00 0.70 0.60 0.84
a a II 2.00 0.20 0.60 0.24
II III 2.00 0.20 0.80 0.32 1.40 M2
0.60 III
I 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a 2.00 0.70 0.60 0.20 0.17
b b 1.00 2.40 0.20 0.20 0.10
c 0.50 c 0.30 c 2.00 0.30 0.15 0.20 0.02
d 1.00 1.80 0.30 0.20 0.11 0.39 M3
1.80

TRAMO INCLINADO 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


1+340 1.00 85.00 1.40 0.55 65.45
65.45 M3
03.04.03.2 ENCOFRADO Y DESENCOFRADO
I 2.00 85.00 0.35 59.50
85.00 II 2.00 85.00 0.55 93.50
153.00 M2
II
03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a 2.00 85.00 0.35 0.20 11.90
I
b 1.00 85.00 1.40 0.20 23.80
a 35.70 M3
a 0.35

b 0.20
0.20 1.00 0.20

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 2
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
TRAYECTORIA + RAMPA 03.04.02.1 EXCAVACION EN MATERIAL SUELTO
1.00 7.60 1.40 0.55 5.85 5.85 M3

7.60 03.04.03.2 ENCOFRADO Y DESENCOFRADO


I 2.00 7.60 0.35 5.32
II 2.00 7.60 0.55 8.36 13.68 M2
I 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a a 2.00 7.60 0.60 0.20 1.82
0.35 II a b 1.00 7.60 1.40 0.20 2.13
c 1.00 1.40 0.30 0.20 0.08 4.04 M3
b
0.20 0.20
1.00
0.20

POZA DE DISIPACION 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


7.40 1.00 7.40 1.25 1.40 12.95

03.04.03.2 ENCOFRADO Y DESENCOFRADO


I
a I 2.00 7.40 1.05 15.54
II a II 2.00 7.40 1.25 18.50
1.05
34.04
b 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
0.20
0.20 a 2.00 7.40 1.05 0.20 3.11
1.00
0.20 b 1.00 7.40 1.40 0.20 2.07
c c 1.00 1.00 0.20 0.60 0.12
1.40
e d d 1.00 1.00 0.80 0.30 0.24
0.60 1.00
e 1.00 1.40 0.20 0.50 0.14 5.68 M3
0.50
0.80 0.20

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 3
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
RAPIDA KM 1+800 (L = 240.00 ML) 03.04.02.1 EXCAVACION EN MATERIAL SUELTO
TRANSICION DE ENTRADA Y SALIDA 2.00 1.00 1.40 0.80 2.24
0.20 1.00 0.20 2.24 M3
03.04.03.2 ENCOFRADO Y DESENCOFRADO
I 2.00 1.00 0.30 0.60

0.60 II 2.00 1.90 0.25 0.95


1.00 1.55 M2

I c I 0.15 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2


c a 2.00 1.00 0.70 0.15 0.21
b b 4.00 1.00 0.30 0.15 0.18
a b c 4.00 1.00 0.30 0.15 0.18
0.60
1 0.57 M3

0.75 II 0.15
0.40
03.05.05.2 JUNTAS WATER STOP E 6"
d 4.00 1.90 7.60 7.60 ML

PANTALLA DE PROTECCION 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


2.00 2.40 1.10 0.20 1.06 1.06 M3
0.70 1.00 0.70
03.04.03.2 ENCOFRADO Y DESENCOFRADO
0.20 I 2.00 0.70 0.60 0.84
a a II 2.00 0.20 0.60 0.24
II III 2.00 0.20 0.80 0.32 1.40 M2
0.60 III
I 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a 2.00 0.70 0.60 0.20 0.17
b b 1.00 2.40 0.20 0.20 0.10
c 0.50 c 0.30 c 2.00 0.30 0.15 0.20 0.02
d 1.00 1.80 0.30 0.20 0.11 0.39 M3
1.80

TRAMO INCLINADO 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


1+800 1.00 220.00 1.40 0.55 169.40
169.40 M3
03.04.03.2 ENCOFRADO Y DESENCOFRADO
I 2.00 220.00 0.35 154.00
220.00 II 2.00 220.00 0.55 242.00
396.00 M2
II
03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a 2.00 220.00 0.35 0.20 30.80
I
b 1.00 220.00 1.40 0.20 61.60
a 92.40 M3
a 0.35

b 0.20
0.20 1.00 0.20

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost - 04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito : CHAULAN Provincia :HUANUCO
Región : HUANUCO
HOJA N° : 4
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
TRAYECTORIA + RAMPA 03.04.02.1 EXCAVACION EN MATERIAL SUELTO
1.00 13.10 1.40 0.55 10.09 10.09 M3

13.10 03.04.03.2 ENCOFRADO Y DESENCOFRADO


I 2.00 13.10 0.35 9.17
II 2.00 13.10 0.55 14.41 23.58 M2
I 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
a a 2.00 13.10 0.35 0.20 1.83
0.35 II a b 1.00 13.10 1.40 0.20 3.67
c 1.00 1.40 0.30 0.20 0.08 5.59 M3
b
0.20 0.20
1.00
0.20

POZA DE DISIPACION 03.04.02.1 EXCAVACION EN MATERIAL SUELTO


6.90 1.00 6.90 1.20 1.40 11.59

03.04.03.2 ENCOFRADO Y DESENCOFRADO


I
a I 2.00 6.90 1.00 13.80
II a II 2.00 6.90 1.20 16.56
1.00
30.36
b 03.04.03.1 CONCRETO F'C = 210 Kg/Cm2
0.20
0.20 a 2.00 6.90 1.00 0.20 2.76
1.00
0.20 b 1.00 6.90 1.40 0.20 1.93
c c 1.00 1.00 0.20 0.60 0.12
1.40
e d d 1.00 1.00 0.80 0.60 0.48
0.60 1.00
e 1.00 1.40 0.20 0.50 0.14 5.43 M3
0.50
0.80 0.20

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 1

Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS
BOCATOMA (PLACA 01)
6.40 1/2" 2 20 7.50 300.00 306.00
0.55 0.55

1/2" 2 32 5.25 336.00 342.72


4.55 3.55

0.70 0.70

BOCAL DE CAPTACION 1/2" 2 20 5.25 210.00 214.20


0.50

1.90

0.45
1/2" 2 16 3.90 124.80 127.296

4.55 4.55

0.70 0.70

BARRAJE MOVIL

MUROS 1/2" 2 20 3.85 154.00 157.08

3.15 3.15

0.70 0.70
1.40 1/2" 2 16 2.50 80.00 81.60
0.55 0.55

2.10 1/2" 2 8 3.20 51.20 52.22


0.55 0.55

4.80 1/2" 2 8 5.90 94.40 96.29


0.55 0.55

HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 2

Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS
BARRAJE MOVIL (Pisos)
6.20 1/2" 2 4 6.80 54.40 55.49
0.40 0.40

1.30 1/2" 2 25 1.30 65.00 66.30


Rejilla de Protección
1.30 5/8" 1 26 1.30 33.80 54.08

5/8" 1 7 3.90 27.30 43.68


3.90

LOSA DE MANIOBRAS

1.75 1/2" 2 5 1.75 17.50 17.85


1/2" 2 5 0.95 9.50 9.69
0.95
TOTAL 1624.50
CANAL VERTEDOR

MUROS

2.35, PROMEDIO
1/2" 4 20 2.35 188.00 191.76

0.60
1.40
0.18 0.18 1/2" 4 6 3.85 92.40 94.248
2.10 1/2" 4 6 3.20 76.80 78.34
0.18 0.18
3.80 1/2" 4 6 2.50 60.00 61.20
0.18 0.18

PISOS
2.60 1/2" 4 5 3.40 68.00 69.36
0.40 0.40 1/2" 4 13 1.10 57.20 58.34
1.10

TOTAL 553.25
HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 3

Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS
DESARENADOR

TRANSICION DE ENTRADA Y SALIDA

0.675 3/8" 2 2 2.10 8.40 4.87

0.75
3/8" 2 5 1.25 12.50 7.25
0.25 0.25
0.25
0.25 0.25

3/8" 2 8 1.35 21.60 12.53


1.35

POZA DECANTACIÓN

1/2" 1 70 2.35 164.50 167.79


1.12 1.12

1.00

9.005 3/8" 2 12 15.53 372.72 216.18


6.535

TOTAL 408.62

HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco

HOJA N° : 3
Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS
CAIDA VERTICAL(06 UND)

CANAL ANTES DE LA CAIDA 3/8" 4 8 2.40 76.80 44.54


0.35 0.95 3/8" 2 8 2.90 46.40 26.91
0.15 H+1.10
H+1.60

3/8" 6 6 1.15 41.40 24.01

1.65

3/8" 6 5 3 90.00 52.20


0.6750 0.675
1.65

POZA DE DISIPACION 3/8" 4 6 3.60 86.40 50.11


3/8" 2 6 5.10 61.20 35.50
Lp
0.30 0.30

Lp 3/8" 4 6 3.15 75.60 43.85


3/8" 2 6 4.65 55.80 32.36
3/8" 6 6 2.10 75.60 43.85
1.85 1.35 3/8" 6 6 1.60 57.60 33.41
0.25 0.25

3/8" 1 6 1.90 11.40 6.61


1.65 1.60 3/8" 1 6 1.85 11.10 6.44
0.25 0.25 3/8" 1 6 1.50 9.00 5.22
3/8" 4 6 1.75 42.00 24.36
1.25 1.50 1.25 3/8" 2 6 1.50 18.00 10.44
0.25 0.25 0.25 3/8" 8 12 1.50 144.00 83.52

HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 4
Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS

3/8" 6 6 1.85 66.60 38.63


0.20
0.60 0.45

0.60

TOTAL 561.96

CRUCE DE QUEBRADA (09 UND.)

LOSA Y MUROS DE CANOA

1/2" 2 7 5.25 73.50 74.97


1.05 1.05 1/2" 4 4 1.60 25.60 26.11
2.75 1/2" 2 12 1.60 38.40 39.17
3.15
1/2" 1 7 4.85 33.95 34.63
1.60
1/2" 2 4 1.60 12.80 13.06
1/2" 1 11 1.60 17.60 17.95
0.90
0.90 1/2" 2 7 4.45 62.30 63.55
2.65
1/2" 4 3 1.60 19.20 19.58
1.60 1/2" 2 10 1.60 32.00 32.64
1/2" 1 7 4.65 32.55 33.20
1.25 1.25 1/2" 1 7 7.75 54.25 55.34
1.05 1.05 1/2" 2 9 1.60 28.80 29.38
2.15
1/2" 1 30 1.60 48.00 48.96
5.65

1.60
1/2" 1 7 4.85 33.95 34.63

1.10 1.10 1/2" 1 7 6.95 48.65 49.62


2.65 1/2" 2 7 1.60 22.40 22.85
0.65 0.65
5.65 1/2" 1 32 1.60 51.20 52.22
1.60

TOTAL 647.85

HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04


HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 5
Nº DE Nº DE FIERROS PARCIAL PARCIAL TOTAL

PART. DESCRIPCION ø VECES FIE 1/4" 3/8" 1/2" 5/8" 3/4" 1" EN EN EN
RRO 0.25 0.58 1.02 1.60 2.26 4.04 METROS KILOS KILOS
PUENTE PEATONAL (05 UNIDADES)

ESTRIBOS

0.20 0.70 3/8" 5 14 1.95 136.50 79.17


0.30 0.25 3/8" 5 14 1.43 100.10 58.06
0.55
0.18
1/2" 5 5 3.50 87.50 89.25
0.85
0.30
3/8" 5 4 3.50 70.00 112.00
3.50

3.50
0.50 1/2" 5 6 1.10 33.00 33.66
0.60

LOZA MACIZA

1/2" 5 8 2.60 104.00 106.08


2.30
0.15 0.15
3/8" 5 8 2.60 104.00 60.32
2.30

1/2" 5 12 1.80 108.00 110.16


1.50
0.15 0.15
3/8" 5 12 1.80 108.00 62.64
1.50

TOTAL 711.34

TOTAL
HECHO POR: Ing. F.A. Sánchez REVISADO POR: FECHA: Aug-04
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 1
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
1.00 BOCATOMA

01.01.00 OBRAS PROVISIONALES


01.01.01 ALMACEN DE MATERIALES Y HERRAM. 1 5.00 5.00 25.00 25.00 M2
01.01.02 CAMPAMENTO TEMPORAL 1 8.00 5.00 40.00 40.00 M2
01.01.03 CARTEL DE OBRA DE IDENTIFICACION DE OBRA 1 1.00 1.00 UN
01.01.04 MOVIL. Y DESMOV. DE EQUIPOS Y MAQ. 1 1.00 1.00 UN

01.02.00 TRABAJOS PRELIMINARES


01.02.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 1 16.50 10.00 165.00 165.00 M2
01.02.02 DESVIOS PROVISIONAL DEL RIO 1 20.00 2.00 2.00 80.00 80.00 M3
01.02.03 ELIMINACION DE AGUA DE FILTRACION 1 15.00 8.00 0.5 60.00 60.00 M3

01.03.00 MOVIMIENTO DE TIERRAS


01.03.01 CORTE DE MATERIAL SIN CLASIFICAR
EXCAVACION MASIVA C/MAQUINARIA EN LECHO DE RIO 250.34 M3
EXCAVACION EN MATERIAL SUELTO 63.01 M3
EXCAVACION MANUAL EN SUELO PESADO 1 62.59 1.25 78.23 78.23 M3
01.03.02 RELLENO COMPACT. C/MATERIAL PROPIO SELECC. 48.37 M3
01.03.03 ACARREO DE MATERIAL EXCEDENTE D = 30.00 M 1 201.97 1.34 269.63 269.63 M3

01.04.00 OBRAS DE CONCRETO SIMPLE


01.04.01 CONCRETO F'C=175 KG/CM2 4.82 M3
01.04.02 MAMPOSTERIA E = 0.80 M, ASENTADO EN 87.00 M2
Co f'c = 175 Kg/Cm2, EMBOQUILLADO CON
MORTERO CEMENTO ARENA (1:5)
01.04.03 MAMPOSTERIA E = 0.25 M, ASENTADO EN 6.83 M2
Co f'c = 175 Kg/Cm2, EMBOQUILLADO CON
MORTERO CEMENTO ARENA (1:3)
01.04.04 CONCRETO CICLOPEO F'C=175 KG/CM2+30% PG 128.09 M3
01.04.05 CONCRETO F'C=175 KG/CM2+25% PM 16.08 M3
01.04.06 SOLADO PARA ZAPATAS E= 4", MEZCLA
CEMENTO - HORMIGON (1:12) 53.30 M2
01.04.07 ENCOFRADO Y DESENCOFRADO CARAVISTA 351.36 M2

01.05.00 OBRAS DE CONCRETO ARMADO


01.05.01 CONCRETO F'C=175 KG/CM2 19.85 M3
01.05.02 CONCRETO F'C=210 KG/CM2 13.80 M3
01.05.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200 KG/CM2 2177.75 KG
01.05.04 ENCOFRADO Y DESENCOFRADO CARAVISTA 95.36 M2

01.06.00 CARPINTERIA METALICA


01.06.01 COMPUERTA 1.00x1.00 - BARRAJE MOVIL 1 1.00 1.00 UN
01.06.02 COMPUERTA 1.00x0.60 - CANAL ADUCCION 1 1.00 1.00 UN
01.06.03 BARANDA DE PROTECCION FºGº DE 2"X1.0 M 1 30.20 30.20 ML
01.06.04 REJILLA DE PROTECCION EN VENTANA DE CAPTACION 1 1.00 1.00 UN
01.06.05 REJILLA DE PROTECCION BARRAJE MOVIL 1 1.00 1.00 UN
01.06.06 REJILLA DE PROTECCION VERTEDERO DE ENTRADA 2.40 2.40 M2

01.07.00 JUNTAS Y SELLOS


01.07.01 JUNTAS ASFALTICAS E = 1" 6.00 6.00 ML
01.07.02 JUNTAS DE DILATACION WATER STOP DE 6" 6.00 6.00 ML
01.07.03 TUBERIA PVC SAL 2"(SUB PRESION) 1 2.00 4.00 8.00 8.00 ML
01.07.04 ENSAYO RESIST. COMPRESION CONRET 1 6.00 6.00 6.00 UN

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 2
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
2.00 DESARENADOR -ALIVIADERO - CANAL DE LIMPIA

02.01.00 TRABAJOS PRELIMINARES


02.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 1 17.00 1.50 25.50 25.50 M2

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 EXCAVACION EN MATERIAL SUELTO 28.67 M3
02.02.02 RELLENO COMPACT. C/MATERIAL PROPIO SELECC. 11.20 M3

02.03.00 OBRAS DE CONCRETO SIMPLE


02.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA 39.15 M2
02.03.02 CONCRETO F'C=175 KG/CM2 7.84 M3

02.03.03 MAMPOSTERIA E = 0.40 M, ASENTADO EN 1.08 M2


Co f'c = 175 Kg/Cm2, EMBOQUILLADO CON
MORTERO CEMENTO ARENA (1:3)

02.04.00 OBRAS DE CONCRETO ARMADO


02.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA 80.36 M2
02.04.02 CONCRETO F'C=210 KG/CM2 10.98 M3
02.04.03 ACERO ESTRUCTURAL DE REFUERZO FY=4200 KG/CM2 408.62 KG

02.05.00 CARPINTERIA METALICA


02.05.01 COMPUERTA 0.60x 0.80 - CANAL DE LIMPIA 1 1.00 1.00 UN

02.06.00 JUNTAS Y SELLOS


02.06.01 JUNTAS ASFALTICAS E = 1" 3.80 3.80 ML
02.06.02 JUNTAS DE DILATACION WATER STOP DE 6" 3.80 3.80 ML
02.06.03 ENSAYO RESIST. COMPRESION CONRET 1 2.00 2.00 2.00 UN

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 3
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
3.0 CANAL PRINCIPAL

02.00.00 TRABAJOS PRELIMINARES


02.01.00 LIMPIEZA DE TERRENO MANUAL 1 2.56 2528.10 6471.94 6471.94 M2
02.01.02 TRAZO NIVELACION Y REPLANTEO DE EJE 1 7.00 7.00 7.00 KM

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 CORTE DE MATERIAL SIN CLASIFICAR
EXCAVACION PLATF C/EQUIPO PES. EN MATERIAL SUEL 1 Ver metrado Explanaciones 10854.00 10854.00 M3
CORTE PLAT. EN ROCA FIJA (PERF. Y DISP) 1 Ver metrado Explanaciones 1686.00 1686.00 M3
CORTE PLAT. EN ROCA SUELTA (PERF. Y DISP) 1 Ver metrado Explanaciones 173.00 173.00 M3
02.02.02 REFINE DE PISOS Y TALUDES EN CAJA DE CANAL 1 2845.00 2845.00 2845.00 ML
02.02.03 RELLENO COMPAC. CON MATERIAL PROPIO SELECC. 1 Ver metrado Explanaciones 605.00 605.00 M3

02.03.00 OBRAS DE CONCRETO SIMPLE


02.03.01 ENCOFRADO Y DESENCOFRADO CON CERCHAS 1925.00 1925.00 ML
02.03.02 CONCRETO F'C=175 KG/CM2 (REVES. CANAL) 577.43 577.43 M3

02.04.00 OTROS
02.04.01 JUNTAS ASFALTICAS E = 1" 1925.00 1925.00 ML
02.04.02 ENSAYO RESIST. COMPRESION CONRET 1 10.00 10.00 10.00 UN

02.05.00 PROTECCION Y CONSERVACION DEL MEDIO AMBIENTE


02.05.01 MANEJO DE CAMPAMENTO
02.05.01.1 SUMINISTRO E INST. DE CONTENEDORES 1 3.00 3.00 3.00 UND
02.05.01.2 LETRINA SANITARIA 1 4.00 4.00 4.00 UND
02.05.01.3 MICRORELLENO SANITARIO 1 2.00 2.00 2.00 UND
02.05.01.4 ELIMINACION DE SUELOS AFECT. POR RESIDUOS 1 100.00 10.00 0.10 100.00 100.00 M3
02.05.01.5 ESCARIFICACION DE SUELOS COMPACTADOS 1 50.00 10.00 500.00 500.00 M2
02.05.01.6 CARGUIO DE SUELOS COMPACTOS 1 120.00 10.00 0.10 120.00 120.00 M3

02.05.02 REACONDICIONAMIENTO Y REVEGETACION


02.05.02.1 REVEGETACION AREA AFECTADA 4 30.00 10.00 1200.00 1200.00 M2

02.05.03 MANEJO DE BOTADEROS


02.05.03.1 ESPARCIDO, NIVELACION Y COMPACT. DE MATERIAL 3 50.00 10.00 1500.00 1500.00 M2
02.05.03.2 REVEGETACION AREA AFECTADA 3 40.00 10.00 1200.00 1200.00 M2

02.05.04 REFORESTACION DE TALUDES


02.05.04.1 REFORESTACION DE TALUDES 6 50.00 8.00 2400.00 2400.00 M2

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 4
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
OBRAS DE ARTE

03.01.00 CANOAS (09 UND)

03.01.01 TRABAJOS PRELIMINARES


03.01.01.1 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 9 5.00 4.00 180.00 180.00 M2

03.01.02 MOVIMIENTO DE TIERRAS


03.01.02.1 EXCAVACION MANAUL EN MATERIAL SUELTO 40.91 40.91 M3
03.01.02.2 RELLENO COMPAC. C/MATERIAL SELECCIONADO 9 3.00 2.10 0.50 28.35 28.35 M3
03.01.02.3 ELIMINACION DE MATERIAL EXCEDENTE 1 40.91 1.65 67.69 67.69 M3

03.01.03 OBRAS DE CONCRETO SIMPLE


03.01.03.1 ENCOFRADO Y DESENCOFRADO NORMAL 173.64 173.64 M2
03.01.03.2 CONCRETO F'C = 175 Kg/Cm2 71.25 71.25 M3
03.01.03.3 MAMPOSTERIA E = 0.25 M, ASENTADO EN 81.65 M2
Co f'c = 175 Kg/Cm2, EMBOQUILLADO CON

03.01.04 OBRAS DE CONCRETO ARMADO


03.01.04.1 CONCRETO F'C=175 KG/CM2 12.47 12.47 M3
03.01.04.2 ENCOFRADO Y DESENCOFRADO CARAVISTA 112.20 112.20 M2
03.01.04.3 ACERO ESTRUCTURAL DE REFUERZO FY=4200 KG/CM2. 647.85 647.85 KG

03.01.05 VARIOS
03.01.05.1 JUNTAS ASFALTICAS E = 1" 39.60 39.60 ML
03.01.05.2 JUNTAS DE DILATACION WATER STOP DE 6" 39.60 39.60 ML
03.01.05.3 ENSAYO RESIST. COMPRESION CONCRET 9 1.00 9.00 9.00 UN

03.02.00 TOMAS PARCELARIAS (13 UN)

03.02.01 TRABAJOS PRELIMINARES


03.02.01.1 TRAZO NIVELACION Y REPLANTEO 13 2.50 3.1 100.10 100.10 M2

03.02.02 MOVIMIENTO DE TIERRAS


03.02.02.1 EXCAVACION MANUAL EN MATERIAL SUELTO 13 1.45 1.00 0.7 13.20 13.20 M3
03.02.02.2 RELLENO COMPAC. C/MATERIAL SELECCIONADO 13 1.00 0.70 0.5 4.55 4.55 M3
03.02.02.3 ELIMINACION DE MATERIAL EXCEDENTE 1 13.20 1.25 16.49 16.49 M3

03.02.03 OBRAS DE CONCRETO SIMPLE


03.02.03.1 ENCOFRADO Y DESENCOFRADO CARAVISTA 23.60 M2
Losa Toma 13 1.65 0.30 6.44
Muros Toma 26 1.65 0.40 17.16
03.02.03.2 CONCRETO F'C=175 KG/CM2 6.50 M3
Losa Toma 13 1.65 0.15 0.82 2.63
Muros Toma 26 1.65 0.15 0.60 3.87

03.02.03.3 SOLADO P/CIMENTACION DE 3" (MEZCLA 1:12) 13 8.87 0.08 8.65 8.65 M2
03.02.03.4 MAMPOSTERIA DE PIEDRA EN Co f'c = 175 Kg/Cm2 13 0.50 1.00 6.50 6.50 M2

03.02.04 VARIOS
03.02.04.1 COMPUERTA METALICA T-ARMCO (0.25 X 0.25) 7 7.00 7.00 UN
03.02.04.2 COMPUERTA METALICA TIPO TARJETA(0.30 X 0.30) 6 6.00 6.00 UN
03.02.04.3 ENSAYO RESIST. COMPRESION CONCRET 9 1.00 9.00 9.00 UN

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 5
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C

03.03.00 PASARELAS (05 UND)

03.03.01 TRABAJOS PRELIMINARES


03.03.01.1 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 5 8.00 2.50 100.00 100.00 M2

03.03.02 MOVIMIENTO DE TIERRAS


03.03.02.1 EXCAVACION MANUAL EN MATERIAL SUELTO 5 2.00 4.10 0.59 24.36 24.36 M3
03.03.02.2 RELLENO COMPAC. CON MATERIAL PROPIO 5 2.00 2.00 0.27 5.34 5.34 M3
03.03.02.3 ELIMINACION DE MATERIAL EXCEDENTE 1 24.36 0.62 15.13 15.13 M3

03.03.03 OBRAS DE CONCRETO SIMPLE


03.03.03.1 SOLADO P/CIMENTACION 3" (MEZCLA 1:12) 5 2.20 1.37 15.10 15.10 M2
03.03.03.2 MAMPOSTERIA DE PIEDRA EN Co f'c = 175 Kg/Cm2 5 5.25 1.20 31.50 31.50 M2
03.03.03.3 FILTRO, GRAVA DE 1/2" 5 1.60 0.25 2.00 2.00 M3

03.03.04 OBRAS DE CONCRETO ARMADO


03.03.04.1 ENCOFRADO Y DESENCOFRADO 38.80 38.80 M2
Muros 20 1.90 0.65 24.70
Losa 5 1.70 1.66 14.10

03.03.04.2 CONCRETO F'C=210 KG/CM2 18.95 18.95 M3


Muros 10 2.20 0.92 0.8 16.23
Losa 5 1.70 1.60 0.2 2.72
01.04.03 ACERO FY=4200 KG/CM2. 711.34 711.34 KG

03.04.00 VARIOS
01.05.01 JUNTAS ASFALTICAS E = 1" 10 0.76 7.60 7.60 ML
01.05.01 TABLONES DE MADERA EUCALIPTO 6"X10"X1.50 M 5.75 24.87 143.00 143.00 P2
01.05.01 ENSAYO RESIST. COMPRESION CONCRET 1 5.00 5.00 5.00 UN

03.04.00 RAPIDAS (02UND)

03.04.01 TRABAJOS PRELIMINARES


03.04.01.1 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 2 180.00 1.11 400.00 400.00 M2

03.04.02 MOVIMIENTO DE TIERRAS


03.04.02.1 EXCAVACION MANUAL EN MATERIAL SUELTO. 282.32 282.32 M3
03.04.02.2 ELIMINACION MATERIAL EXCEDENTE 1 282.32 0.47 132.13 132.13 M3

03.04.03 OBRAS DE CONCRETO SIMPLE


03.04.03.1 CONCRETO F'C=210 KG/CM2 150.86 150.86 M3
03.04.03.2 ENCOFRADO Y DESENCOFRADO CARAVISTA 656.67 656.67 M2

03.04.04 VARIOS
03.04.04.1 JUNTAS ASFALTICAS E = 1" 181.00 181.00 ML
03.04.04.2 JUNTAS WATER STOP 6" 7.60 7.60 ML
03.04.04.3 ENSAYO RESIST. COMPRESION CONCRET 1 4.00 4.00 4.00 UN

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
CONSOLIDADO DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : Shunturcancha Distrito : Chaulan Provincia : Huánuco
Dptto. : Huánuco
HOJA N° : 6
PARTIDA DESCRIPCION Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C

03.05.00 CAIDAS VERTICALES (06 UND.)

03.05.01 TRABAJOS PRELIMINARES


03.05.01.1 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS 6 6.00 2.78 100.00 100.00 M2

03.05.02 MOVIMIENTO DE TIERRAS


03.05.02.1 EXCAVACION MANUAL EN MATERIAL SUELTO 66.59 66.59 M3
03.05.02.2 ELIMINACION DE MATERIAL EXCEDENTE 1 66.59 1.25 83.24 83.24 M3

03.05.03 OBRAS DE CONCRETO SIMPLE


03.05.03.1 SOLADO P/CIMENTACION 3" MEZCLA 1:12 1 6.00 7.00 1.8 75.60 75.60 M2
03.05.03.2 CONCRETO F'C=175 KG/CM2 4.52 4.52 M2
03.05.03.3 ENCOFRADO Y DESENCOFRADO 14.88 14.88 M3

03.05.04 OBRAS DE CONCRETO ARMADO


03.05.04.1 ENCOFRADO Y DESENCOFRADO CARAVISTA 114.89 114.89 M2
03.05.04.2 CONCRETO F'C=210 KG/CM2 18.82 18.82 M3
03.05.04.3 ACERO ESTRUCTURAL DE REFUERZO FY=4200 KG/CM2. 561.96 561.96 KG

03.05.05 VARIOS
03.05.05.1 JUNTAS ASFALTICAS E = 1" 39.60 39.60 ML
03.05.05.2 JUNTAS WATER STOP 6" 39.60 39.60 ML
03.05.05.3 TUBERIA AEREACIÓN PVC SAP 2" 6 8.00 48.00 48.00 ML
03.05.05.4 ENSAYO RESIST. COMPRESION CONCRET 1 6.00 6.00 6.00 UN

Hecho por: Ing. F.A. Sánchez Vilela Revisado por: Fecha: Nov. - 2004
HOJA DE METRADOS

OBRA : MEJORAMIENTO CANAL SHUNTURCANCHA


Localidad : SHUNTURCANCHA Distrito :CHAULAN Provincia HUANUCO
Región : HUANUCO
HOJA N° : 1
ELEMENTO PARTIDA Nº MEDIDAS PARCIAL TOTAL UND.
VECES A B C
CANAL PRINCIPAL (TRAMOS A REVESTIR) LONGITUD DE CANAL A REVESTIR
KM 0+000 AL KM 0+767 = 767.00 Ml 1.00 767.00 767.00
KM 0+815 AL KM 0+910.7 = 95.70 Ml 1.00 95.70 95.70
KM 1+440 AL KM 1+800 = 360.00 Ml 1.00 360.00 360.00
KM 3+140 AL KM 3+152 = 12.00 Ml 1.00 12.00 12.00
KM 3+212 AL KM 3+220 = 8.00 Ml 1.00 8.00 8.00
KM 3+280 AL KM 3+320 = 40.00 Ml 1.00 40.00 40.00
KM 4+040 AL KM 4+200 = 60.00 Ml 1.00 60.00 60.00
KM 4+233 AL KM 2+333 = 100.00 Ml 1.00 100.00 100.00
KM 5+080 AL KM 5+234 = 154.00 Ml 1.00 154.00 154.00
KM 5+665 AL KM 5+740 = 85.00 Ml 1.00 85.00 85.00
KM 5+790 AL KM 5+910 = 120.00 Ml 1.00 120.00 120.00
KM 6+025 AL KM 6+190 = 165.00 Ml 1.00 165.00 165.00
KM 6+238 AL KM 6+375 = 137.00 Ml 1.00 137.00 137.00
KM 6+479 AL KM 7+000 = 521.00 Ml 1.00 521.00 521.00

2624.70 ML
02.02.01 EXCAVACION CAJA DE CANAL
Ver Planilla de metrado de explanaciones
02.03.01 ENCOFRADO Y DESENCOFRADO CON CERCHAS C/3.00 ML
I 875.00 2.20 1925.00

L = 2764.70 ML 1925.00 ML
02.03.02 CONCRETO F'C = 175 Kg/Cm2
0.15 1.30 0.15
a 2.00 2624.70 0.13 0.10 65.62
a a b 2.00 2624.70 0.75 0.10 393.71
L
b b c 1.00 2624.70 0.45 0.10 118.11
c 577.43 M3
I
I 0.60 02.04.01 JUNTAS ASFALTICAS E = 1"
1 875.00 2.20 1925.00
0-75 0.10
I 1925.00 ML
0.40

Hecho por: Ingº Florentino A. Sánchez Vilela Fecha: Agost -04