Define
Define
Define
GREEN/BLACK BELT
Here are benefits of Six Sigma certification
• Career Advancement
• Helps Nurture Managerial and Leadership Ability
• Standardization
• Improve Business Processes and Sustain Quality Improvement
• Excellent Salary
• Applicability across Industries
• Ensure Compliance
• Gain Hands-On Experience in Quality Management
• Better Understanding
• Organizational Growth
• Support Your Organization Eliminate Errors
• Improved Company Culture
• Widen the thinking capability
• Improve self-esteem
• Be competent in a highly competitive world
50% of your current knowledge
is irrelevant in every 2 years
Turning Words into Numbers and
Numbers into Data and data has to be
converted into decisions
Introductions
1. Who are you?
4. Achievements if any?
Not Achieved
by current
activities
Improvement
Changing the Candidates
Business
Performance
Normal Improvement
Through Routine
Running The
business
Video
Month
120
100
80
Net Profit
60
40
20
0
2016 2017 2018 2019
Year
Organizations wants Improvement..!!!
Net
Profit
Lean Six Sigma is the Improvement Blueprint
for the Organization
Prof. Yamaguchi san
What is Lean Six Sigma?
PHILOSOPHY METRIC
Life Improvement 3.4 Defects per
million
Lean Six
Sigma
MANAGEMENT
SYSTEM
METHODOLOGY
Job relationship
Systematic Approach
Framework (YB,
DMAIC
GB…)
Does 6 Sigma Apply to Me ?
What is Lean ?
Speed + Accuracy
Subsequently, Dr. Harry began to formulate a method for applying six sigma throughout
Motorola. In 1987 when Bob Galvin was the Chairman, Six Sigma was started as a
methodology in Motorola
BILL SMITH
Bill Smith, an engineer, and Mikel Harry together devised a methodology with the focus on
defect reduction and improvement in yield through statistics.
The term "Six Sigma" was coined by Bill Smith, who is now called Father of Six Sigma
Terms such as Black Belt and Green Belt were coined by Mikel Harry in relation to martial arts.
MIKEL HARRY
Themes of Lean Six Sigma
• Process Focus
• Proactive Management
• Boundaryless Collaboration
Driven by
customer
needs
Process Map Analysis
LSL USL
Led by
Senior
Mgmt Upper/Lower
• ••••
••
•
specification
•
• •
• •
•
• •••••
••
limits
••
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
0 0%
L K A F B C G R D
Pareto Chart
Success- Culture
Customer Process A Process B Vendor
Driven by
customer
needs
Process Map Analysis
LSL USL
Led by
Senior
Mgmt Upper/Lower
• ••••
••
•
specification
•
• •
• •
•
• •••••
••
limits
••
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
0 0%
L K A F B C G R D
Pareto Chart
Organization Team
Project Sponsor
Black Belt
Green Belt
Six sigma Organization
There are many roles and responsibilities for successful implementation of Six Sigma
MBB
Black Belts
Green Belts
Yellow Belts
People Structure
2. Reluctant participants
3. Unquestioned acceptance
4. No public disagreements
5. Rush to accomplishment
Success- Approach
Driven by
customer
needs
Process Map Analysis
LSL USL
Led by
Senior
Mgmt Upper/Lower
• ••••
••
•
specification
•
• •
• •
•
• •••••
••
limits
••
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
0 0%
L K A F B C G R D
Pareto Chart
Lean Six Sigma Methodology
Sweet fruits
Process
DFSS - DMADV
limitations
Bulk of fruits
Process characterization
and optimization
Conventional
Practical Approach
problem
( Trial & Error )
Statistical
problem
Statistical
solution
Practical
solution
The Formula of Six Sigma (Any phenomenon)
Y = f (X)
• Dependent • X1 . . . XN
• Output • Independent
• Effect • Input-Process
• Symptom • Cause
• Monitor • Problem
• Control
Would you control target or the shooter to get the Gold Medal?
How Six Sigma Relates to a Process ?
“Correct”
(In-Spec.)
X1
X2 Customer’s
Process Y
Needs & expectations
X3
Xn
Process Input Process Output Critical To Quality
Variables Variables (CTQ)
Y = f(X)
Y X1, X2, …….., Xn
Dependent variable Independent variable
Output of the process Input to the process
Effect Cause
Symptom Problem
It is monitored It is controlled
Sugar X1
water X2
Coffee bean X3
Y1 Strong
milk X4 Coffee
Temperature X5 PROCESS Sweet
Y2
Rate of heating X6 Coffee
Y3Cappuccino
Boiling time X7
The above example the shows the process in which in the right Y’s which are measurable customer requirements
or business requirement.
❖ The X’s on the left side are the variable inputs for the process. So the levels and the types of the X’s determines
the required Y. Y is found out or identified in the DEFINE phase.
❖ For each Y there will be many number of potential X’s. The potential X’s are identified and measured in
MEASURE phase.
❖ The vital critical X’s are identified from the potential X’s in the ANALYSE phase.
The above example of preparation of a Tea gives a outline of the DMAIC process which will help you to
understand. So any change in any of the X’s can affect your Y.
Classification of Problems
(How to select Problem solving BB projects)
Unknown 2 3
Cause
Classification of Problems
(How to select Problem solving BB projects)
Unknown 3
Cause :Unknown
Solution
Solution :Unknown
4
known
Cause :Unknown
Solution :Known
known Unknown
Cause
DMAIC Methodology
Define
Analyze Data Ensure Solution is
CTQ & CTB Sustained
Project Selection Identify Root Causes
Team Formation
Project charter
Business case
Measure Phase
Analyze Phase
Improve Phase
Control Phase
Optimized Process
Success- Tools
Driven by
customer
needs
Process Map Analysis
LSL USL
Led by
Senior
Mgmt Upper/Lower
• ••••
••
•
specification
•
• •
• •
•
• •••••
••
limits
••
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
0 0%
L K A F B C G R D
Pareto Chart
SCIENTISTS WHO CONTRIBUTED TO SIX SIGMA
What is Quality ?
56 Which car is a quality car?
POND A POND B
Average depth = 4 feet Average depth = 4 feet
5.5 Feet
6 meters
5 meters
2
4 2
4 4 3
5 5 4
4
7
POND A POND B
2 2
x x-xbar (x-xbar) x x-xbar (x-xbar)
2 2-4 = -2 4 2 2-4 = -2 4
4 4-4 = 0 0 3 3-4 = -1 1
4 4-4 = 0 0 4 4-4 = 0 0
5 5-4 = 1 1 7 7-4 = 3 9
5 5-4 = 1 1 4 4-4 = 0 0
4 4-4 =0 0
Sum 24 6 20 14
Average (x bar) 4 4
2
= =1 2
= = 2.8 1.6
X X- X bar (X- X bar)2
13 13 – 12 = 1 1
10 10 – 12 = -2 4
8 8 – 12 = -4 16
15 15 – 12 = 3 9
12 12 – 12 = 0 0
14 14 – 12 = 2 4
34/6 = 5.66
= 2.37
What is sigma?
Inputs
Outputs
Supplier(s) Customer(s)
“The Process”
The Process
Controllable Factors
Employee time
Energy
Machines
Inputs
Money
Quantity,
material,
Outputs
parts, Characteristics
Climate
Holidays
3.75 ml
Machines
Inputs
Money
Quantity,
material,
parts, 0.06 ml
3.75 ml
Machines
Inputs
Money
Quantity,
material,
parts, 0.06 ml
3.75 ml
Machines
Inputs
Money
Quantity,
material,
parts, 0.06 ml
3.75 ml
Machines
Inputs
Money
Quantity,
material,
parts, 0.06 ml
• Mean
• Sigma (σ) or Standard deviation
• Why “6” Sigma ? Why not 4 or 7?
The Process
Outputs
Controllable Factors
Target
Employee time
Energy
3.75 ml
Machines
Inputs
Money
Quantity,
material,
parts, 0.03 ml
3.75 ml
Machines ( M1,M2)
Money (LOW,HIGH)
Data (TABULATED,NONTABULATED)
Material (TYPE1,TYPE2),
0.03 ml
Parts( PARTA, PARTB),
LSL:3.72 USL:3.78
Climate (DEPENDED ON SEASON)
Holidays (DIFFERS)
Breakdown (MAINTANENCE)
3.75 ml
Machines ( M1,M2)
Money (LOW,HIGH)
inputs
Data (TABULATED,NONTABULATED)
Material (TYPE1,TYPE2),
Parts( PARTA, PARTB), 0.03 ml
A B C
The Process
Tools
❖ VOC-CTQ
❖ Kano model
“If I had one hour to save the world, I would spend
fifty five minutes defining the problem and only five
minutes finding the solution.”
Einstein
Project Identification Methods
VOC Analysis
(problems identified on the basis
of Customer’s Voice)
COPQ Analysis
(problems identified on the basis of
Cost of Poor Quality i .e. Process
Defects ) •VOC → Voice of Customer
•VOB → Voice of Business
•COPQ → Cost of Poor Quality
GEMS EXPERIMENT
# of defects x 106
DPMO =
( # of Units) x ( # of opportunities)
Voice of the Customer
❖ “Voice of Customer” is the term used to describe the stated and unstated needs or requirements
of the customer for our Product/Service or Process.
❖ The voice of the customer (VOC) is the starting point of any project and data collection plan.
❖ Expectation
❖ Requirements
❖ Opinions
Gems Car
Tools for gathering VOC
❖Interviews ❖Complaints
❖Focus groups ❖Field reports
❖Surveys ❖Benchmarking
❖Informal customer discussions ❖Observations
❖Market research ❖Etc.,
Kano Model
by Noriaki Kano
Satisfied
Feeling “Competitive”
the more the
better
Physically
Fulfilled
(Need is not met) Condition
(Need is met)
Unstated, “Taken
Expected
Quality for
Dissatisfied granted”
Feeling
Kano's "3 Arrow Diagram"
107
Satisfied
“Surprise & Feeling “Competitive
Delighters” ”
the more the
Exciting
Quality better
Physically
Fulfilled
(Need is not met) Condition
(Need is met)
Unstated, “Taken
Expected
Quality for
Dissatisfied
Feeling
granted”
Kano Model.mp4
Kano's "3 Arrow Diagram"
108
Satisfied
Feeling
What was
exciting
yesterday
becomes
expected
tomorrow
Physically
Fulfilled
(Need is not met) Condition
(Need is met)
Unstated,
Expected
Quality
Dissatisfied
Feeling
Exercise
IDEA
KANO Model Ericsson
Critical To Quality (CTQ)
Critical to quality (CTQ) is the key measurable characteristic of a product or process whose
performance standards must be met in order to satisfy the customer.
➢ Understand VOC
➢ Performance
➢ Reliability
➢ Durability
➢ Serviceability
➢ Aesthetics
➢ Features
➢ Perceived Quality
➢ Conformance to Standards
Product/ Service
Metric
Need Characteristics
➢ The Charter:
o Clarifies what is expected of the team.
o Keeps the team focused.
o Keeps the team aligned with organizational priorities.
O Transfers the project from the champion(s) to the
project team.
o Clearly describes the problem
o Establishes a timeline for the project
The Project Charter does NOT solve the
problem. It is a living document, that
will change over time…..
Key elements in a charter
Business Case:
➢
• Explanation of why to do the project
➢
Problem and Goal Statements:
• Description of the problem/opportunity or objective in clear,
concise, measurable terms
➢ Milestones:
• Key steps and dates to achieve goal
➢ Roles:
• People, expectations, responsibilities
Business case Problem Statement
Time line
Business Case
Why is it important to do the project.?
The reasons of undertaking the project.
The benefits gained from undertaking the
project now.
The consequences of not doing the project.
The factors that would conclude that it fits the
business goals
The Goal Statement
The Goal Statement then defines the
team’s improvement objective Specific
▪Definition of the improvement the team
is seeking to accomplish?
Measurable
▪Starts with a verb (reduce, eliminate,
control, increase)
▪Tends to start broadly - eventually
Attainable
should include measurable target and
completion date
▪Must not presume cause, or prescribe
Relevant
solution!
Time Bound
SMART GOAL - Example
➢ Goal Statement- To reduce the percentage of late payments (what) from
30% to 15% (magnitude) In the next 3 months (when) in the North India
Region (where), and realize savings of 500KUSD/ year (magnitude).
Month
Define
Control
Analyze
Improve
Measure
Phase
Plan
Plan
Plan
Plan
Plan
Actual
Actual
Actual
Actual
Actual
Week 7
Week 8
July
Week 9
Week 10
Week 11
August
Week 12
Week 13
Week 14
Project Schedule
Week 15
Week 16
September
Week 17
Week 18
Week 19
Week 20
October
Week 21
Week 22
Week 23
Week 24
Week 25
November
Week 26
Week 27
Week 28
Week 29
December
Week 30
Week 31
ot
Status
SIPOC
Process
AN ACTIVITY USING RESOURCES, AND MANAGED IN ORDER TO ENABLE THE
THE OUTPUT FROM ONE PROCESS DIRECTLY FORMS THE INPUT TO THE NEXT PROCESS
Process Maps
The purpose of Process Maps is to:
Identify the complexity of the process
Communicate the focus of problem solving
Process Maps are living documents and must be changed as the process is changed
They represent what is currently happening, not what you think is happening.
They should be created by the people who are closest to the process
Process Map
Suppliers Customers
Steps
Inform Loop
• Suppliers – The internal and external providers of resources, materials, knowledge, and
• Inputs – Materials, resources, Money, data and people required to execute your process.
• Outputs – The measurable or assessable end products or services produced by the process.
• Customers – People who receive the final products and the outputs of each process step.
Advantages of the Process View
View of activities in an organization as cross-functional flows, focusing on the
value-added activities for the customer.
Allows definition of clear performance metrics that reflect the value to the
customers.
Managing the processes, rather than individual activities, allows end-to end
process improvement.
SIPOC Requirements
❖ Clearly define the start and stop points
Application form
Fillup
Bank Accepted Application form Scanning Scanned photo, signature file Bank
Bank Account details pass Book issue Printed Passbook with Entry Applicant
Empty Passbook
E n d
SIPOC of Prescribing Medicine
Visual SIPOC
3.
4.
5.
No. Assumptions for/Way of Benefit Calculation (e.g. energy prices, fix cost per ton, etc.):
1. Productivity baseline is calculated by using monthly average productivity from September 2017 to July 2018, Productivity = (Total Production Receive +Delivery) / Total ManHr involved in reveving and delivery
Productivity baseline is calculated by using monthly average productivity from September 2018 to 20 th October 2018, Productivity = (Total Production Receive +Shifting) / Total ManHr involved in reveving and
1a)
Shifting
1b) Delivery Productivity baseline is calculated by using monthly average productivity from September 2018 to 20 th October 2018, Productivity = (Total Delivery) / Total ManHr involved in delivey.
2. Distribution capability baseline is calculated by using peak 5 days average productivity (Kg/Manhr) of each month from September 2017 to July 2018
3
Baseline calculation for KPI # 1 : Delivery and Receiving =3,45,576 kg , Total Man Hr=374 Man Hr (Average of total manhours including OT)
4.
Target Calculation for distribution productivity : Man Hr= 313 , Delivery and Receiving =323955 kg(1035 X 313)
5.
Target Calculation for distribution capability : Man Hr= 313 , Delivery and Receiving =4055335 kg(1295 X 313)
6
Target Calculation for receiving & shifting productivity : Man Hr= 150 , Receiving & Shifting =137846 kg(878 X 157)
Roles &
Voice of Business Case Develop the Responsibilitie
Business project team s