GROUP 14 WORK EQUIPMENT

1. STRUCTURE

B
C

SECTION A SECTION B SECTION C

8-327
2. REMOVAL AND INSTALL
1) BUCKET ASSEMBLY
(1) Removal
‫ ڸ‬Lower the work equipment completely to 2
ground with back of bucket facing down. 1

GROUND

‫ ڹ‬Remove nut(4), bolt(3), and draw out the


pin(1).

3
1

‫ ں‬Remove nut(4), bolt(3), and draw out the


pin(2).

3
2

(2) Install
‫ ڸ‬Carry out installation in the reverse order
to removal.
When aligning the mounting position of
the pin, do not insert your fingers in the
pin hole.
Ɠ Adjust the bucket clearance.
For detail, see operation manual.

8-328
2) ARM ASSEMBLY
(1) Removal
Ɠ Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
Ɠ Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrated the skin causing serious
injury.
‫ ڸ‬Remove bucket assembly.
For details, see removal of bucket
assembly.
‫ ڹ‬Loosen socket bolt(2) to disconnect
bucket cylinder hoses(1).
Fit blind plugs in the piping at the
chassis end securely to prevent oil from 1
spurting out when the engine is started. 2
‫ ں‬Sling arm cylinder assembly, and remove
nut, bolt, then pull out pin.
Ɠ Tie the rod with wire to prevent it from
coming out.
For details, see removal of arm
cylinder assembly. Crane
‫ ڻ‬Place a wooden block under the cylinder
and bring the cylinder down to it.
‫ ڼ‬Remove nut(5), bolt(4) and pull out the
pin(3) then remove the arm assembly.
3, 4, 5
şWeight : 820kg(1808lb)
Ɠ When lifting the arm assembly, always lift
the center of gravity.

(2) Install
‫ ڸ‬Carry out installation in the reverse order
to removal.
When lifting the arm assembly, always lift
the center of gravity.
Ɠ Bleed the air from the cylinder.

8-329
3) BOOM ASSEMBLY
(1) Removal
‫ ڸ‬Remove arm and bucket assembly.
For details, see removal of arm and
bucket assembly.
‫ ڹ‬Remove boom cylinder assembly from
boom.
For details, see removal of boom
cylinder assembly.

‫ ں‬Disconnect head work wiring.


‫ ڻ‬Disconnect bucket cylinder hose(2) and
arm cylinder hose(1).
Ɠ When the hoses are disconnected, oil
may spurt out.
2

‫ ڼ‬Sling boom assembly(3).


Crane
‫ ڽ‬Remove bolt(4), nut(5) and pull out the
pin(6) then remove boom assembly.
şWeight :1354kg(2985lb)
Ɠ When lifting the boom assembly always
lift the center of gravity.

3 4, 5, 6

(2) Install
‫ ڸ‬Carry out installation in the reverse order
to removal.
When lifting the boom assembly, always 4
lift the center of gravity. 6
Ɠ Bleed the air from the cylinder.
5

8-330