Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Site Name:: L0352ATONSU - ET

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

MTN 2021 RANMOD SSV REPORT

Rev. Date Description


1 21-01-2021 Proposed Pre/Post RANMOD Report Template

SITE NAME: L0352ATONSU_ET


DRIVE TEST ENGINEER NAME Selorm Mensah

SITE ON AIR DATE


DRIVE TEST DATE 21/01/2021

REPORT PREPARED BY Eugene Lotsu


Table of Contents
1 INTRODUCTION..................................................................................................................................... 2

1.1 AREA AND SITE OVERVIEW FROM GOOGLE EARTH............................................................................................2


1.2 BASIC SITE PARAMETERS............................................................................................................................2
1.2.1 SITE DATA................................................................................................................................................2
1.2.2 RF DATA...................................................................................................................................................2
1.2.3 RADIO CONFIGURATION DATA................................................................................................................2

2 MAP PLOTS........................................................................................................................................... 2

2.1 PCI PLOT............................................................................................................................................... 2


2.2 COVERAGE PLOT (RSRP).......................................................................................................................2
2.3 QUALITY PLOT (RSRQ)..........................................................................................................................2
2.4 QUALITY (SINR)....................................................................................................................................2
2.1 DL THROUGHPUT DISTRIBUTION PLOT................................................................................................2

3 KPI SUMMARY...................................................................................................................................... 2

3.1 ATTACH/DETACH......................................................................................................................................2
3.2 ACCESSIBILITY.......................................................................................................................................2
3.3 MOBILITY............................................................................................................................................. 2
3.4 RETAINABILITY.....................................................................................................................................2
3.5 INTEGRITY............................................................................................................................................2
3.4.1 THROUGHPUT STATIONARY TEST..........................................................................................................2
3.6 COVERAGE............................................................................................................................................2
3.7 SERVICES.............................................................................................................................................. 2

4 DATA TEST THROUGHPUT SCREEN SHOTS POST MODERNIZATION..........................................................2

4.1 SECTOR 1 THROUGHPUT SNAPSHOT...................................................................................................2


4.2 SECTOR 2 THROUGHPUT SNAPSHOT...................................................................................................2
SECTOR 3 THROUGHPUT SNAPSHOT................................................................................................................2

3.4.2 LATENCY RTT – STATIC PING TEST.......................................................................................................... 2

5 ACCEPTANCE......................................................................................................................................... 2

2021-06-27 Confidential Page2, Total12


1 INTRODUCTION

1.1 Area and site overview on Google Maps

1.1 Basic Site Parameters

1.2.1 SITE DATA

Site ID / Site Name 0352/ L0352ATONSU_ET


Latitude/Longitude 6.69706 -1.57949
U200Region ASHANTI REGION
Date 21/01/2020
RBS Cabinet Type
DUS Type  

1.2.2 RF DATA

Cell Name Cell ID Antenna Type M Tilt E Tilt Azimuth Antenna Height
L0352G1 0 Octaband RET

L0352H1 1 Octaband RET

L0352J1 2 Octaband RET

2021-06-27 Confidential Page3, Total12


1.2.3 RADIO CONFIGURATION DATA

Frequency DL UL
Cell Name Cell ID TAI TAC PCI RSN BANDWIDTH
Band EARFCN EARFCN
L0352G1 0 150 15003 20 6375 24375 283 15MHz
L0352H1 1 150 15003 20 6375 24375 390 15MHz
L0352J1 2 150 15003 20 6375 24375 828 15MHz

2 MAP PLOTS

2.1 PCI PLOT

Before Modernization After Modernization

2021-06-27 Confidential Page4, Total12


2.2 COVERAGE PLOT (RSRP)

Before Modernization After Modernization

2.3 QUALITY PLOT (RSRQ)


Before Modernization After Modernization

2021-06-27 Confidential Page5, Total12


2.4 QUALITY (SINR)

Before Modernization After Modernization

1.1 DL THROUGHPUT DISTRIBUTION PLOT

Before Modernization After Modernization

2021-06-27 Confidential Page6, Total12


3 KPI SUMMARY – POST MODERNIZATION

3.1 Attach/Detach
Attach 100%
Detach 100%

3.2 ACCESSIBILITY
SUCCES
DRIVE TEST CATEGOR TARGE
ATTEMPTS SUCCESS FAILURES S RATE PASS/FAIL
KPI Y T (%)
(%)
Session Setup Accessibility 7 7  0  100    
MO CSFB Accessibility      0  100    

3.3 MOBILITY
SUCCES
DRIVE TEST CATEGO ATTEMP SUCCES FAILUR TARGE PASS/FA
S RATE
KPI RY TS S ES T (%) IL
(%)
Intra Site LTE
Mobility 7 7 0  100  
HO  
IRAT HO to
Mobility    
3G
TAU (>95%) Mobility 0 0 0  0    

3.4 RETAINABILITY
PASS/FAI
DRIVE TEST KPI CATEGORY SETUPS DROPS DROP RATE (%) TARGET (%) L
Session Drop Retainability 7 0  0  

3.5 INTEGRITY

3.4.1 THROUGHPUT STATIONARY TEST

SECTOR DL PEAK TP (Mbps) DL AVG TP (Mbps) UL PEAK TP (Mbps) UL AVG TP (Mbps)


1
2
3

2021-06-27 Confidential Page7, Total12


3.6 COVERAGE THRESHOLD

The coverage percentage of RSRP≥-95 dBm & SINR ≥-3dB Within 800m should >95% 100%

3.7 SERVICES
HTTP/Browsing Verification OK
FTP/Streaming Verification OK

4 DATA TEST THROUGHPUT SCREEN SHOTS POST


MODERNIZATION

4.1 SECTOR 1 THROUGHPUT SNAPSHOT

DL

UL

2021-06-27 Confidential Page8, Total12


4.2 SECTOR 2 THROUGHPUT SNAPSHOT

DL

UL

2021-06-27 Confidential Page9, Total12


4.3 SECTOR 3 THROUGHPUT SNAPSHOT

DL

2021-06-27 Confidential Page10, Total12


UL

4.4 LATENCY RTT – STATIC PING TEST

CELL NO OF PINGS AVG LATENCY (ms) TARGET LATENCY (ms) PASS/FAIL


SECTOR 1  10 27  
SECTOR 2  10 22  
SECTOR 3  10 20  

5 ACCEPTANCE

Acceptance
Remarks

2021-06-27 Confidential Page11, Total12


Signed by (Huawei)

Signed by (MTN)

Date of acceptance

2021-06-27 Confidential Page12, Total12

You might also like