Flare System Design
Flare System Design
Flare System Design
www.argoflares.com
Step Two
Use Argo to optimise the design of an existing flare system in order to increase safety when
debottlenecking. We will:
Do all of the above
Review the existing flare system and advise any alterations that need to be made
Advise on any upgrades in materials selection by analysing past performance of the flare
tip(s)
Comment on the suitability of the existing flare pilot ignition and monitoring system
Comment on the suitability of the existing flare structure and advise any modifications
required
Advise on the best method of flare changeout such as helicopter, davit, crane etc. Argo
will also prepare a removal and installation methodology manual
Step Four
Sit back and let Argo do all the work. We are highly experienced in the execution of
projects for most applications throughout the world including; offshore oil & gas platforms,
FPSOs, onshore production facilities and terminals, steelworks, refineries, chemical plants
and power plants for all types of elevated and ground level flares. Argo has developed a
number of relationships with other supply companies in order to be in a position to offer our
industry this full Flare System Design & Supply Service. These are explained below.
• Flare System Design & Supply • Offshore Flare Inspections • Flare Ignition Systems
• Specialist Flare Refurbishments • Flare Aerial Inspection Surveys • Flare Crisis Management
Document: Flare System Design Rev 3.0 (November 2019) Page 2 of 2