Ans:
For oil tankers both CLC -oil and CLC - bunker insurance are reqd.
bunker insurer will pay when clc-oil convention does not apply (non-
persistent oil, ballast condition ) and the limitation of liability is reached for
one insurance. Basically both insurer will pay as reqd.
Cylinders are hyd tested with water with high press pump.
CO2 capacity 45 +/- 0.5 Kg, Bott test pr 250 bar, storage pr 58 bar, safety
disc bursting pr 180 to 200 bar, total wt 115 to 130 bar. bott material Inter-
Mn Steel or Cr-Mo steel, bott ht.1490+/- 10 dia 267.4+/-1%. .
1) insurance about oil and gas tankers, what certificate need to carry on
board
2) as per marine insurance claim on oil spill in oil and gas tankers?
3) what certificates are need to carry on board as per annex 1,4,6?
4)what certificate issued to the ships as per antifouling paint convention?
5)dry-dock in detail?
6)as per ism code c/e duties related to pms?
7)if class is need for Indian vessel, then why and under what regulation?
8)what is bdn and what details?
9)gas tanker gas spills what about insurance?
for all questions he needs in depth answer.
1.sewage survey what checks are done? How much should be the chlorine
content?? latest-it should be as low as possible?? then why do we add
chlorine tablet to the sewage plant??regarding coliform count?? what is
it??value it should be??
2.if a vessel less than 400 grt is complying with sewage then why certificate
is not issued??how do u show the performance of discharge pump in sewage
plant ??
2. WITH SPRINKLER
3. WITH BOTH 1 N 2
4. FREE FALL
5 GRAVITY LAUNCH
17 nt, gt, dw
18 mlc
19 unclos
21 sox
22 force Majuro
28 iacs criterea
31 managment review
32 masters review
36 category of tanker
result fail
37 mentoring
38 dewatering system
40 container material
41 just in time
43 cbt
44 isgott
45 blucard
46 isgott
47 contiguous zone
48 fire plan
59 suv convention
60 mentoring
61 tonnage tax
62 gt, nt
64 cabotage
65 what is ms act
80 Anex 4 applicability
83 if ships less than 400 gt complies with marpol, y certificate is not issued
89 ship is at level 2 and port is at level 1, which level ship should maintain?
September
- Bunker supplier registration no- is it for the supplier or for the barge?
- BDN contents?
- other than fire protection, fire detection, fire extinction system what other
thing is mentioned in the plan?
- Other than timing and temperature what is tge difference between A-60
and A-30 bulkheads?
- Issued to which all ships & What is to be done for ships less than 400 GRT?
99. Survey of Hull. What are the items for Hull survey?
102. CO2 Fixed Fire Installation survey. Checks on CO2 room as a Chief
Engineer.