Crane Assembly
Crane Assembly
Crane Assembly
PPE: Safety Helmet, safety Shoes, Gloves, Safety Goggle, Safety Harness Job Location: E & P Yard
Falling of load / - Failure of Crane Serious injuries / Fatality - Safety Talk shall be conducted to explain JSA
Lifting & Unbalancing of - Failure of lifting Property damage with all participants before lifting
placing of crane point of hook - Only authorized personnel should perform the
boom on Falling of - Improper lifting task.
ground personnel - Inadequate Placing - Designated signalman wearing high visibility
of CRANE jacket to be allowed to give signals to the crane
JOB SAFETY ANALYSIS SHEET
- High wind velocity operator.
- Improper fall - Crane outriggers shall be extended fully.
protection - Ground shall have hard surface & Outrigger pads
to be used.
- Area around the work place shall be barricaded to
stop unauthorized entry.
- No body should stay under suspended load or
move through the operating radius of boom.
- The weight of the load shall be taken smoothly
without allowing it to jerk.
- The entire activity shall be performed under the
supervision of a qualified Supervisor.
- Use at least two tag lines to control swinging of
lifted object.
De-Assembling Falling of load / - Failure of Crane Serious injuries / Fatality - Only authorized personnel should perform the
& Assembling Unbalancing of - Failure of lifting Property damage task.
of boom. crane point of hook - Designated signalman wearing high visibility
Falling of - Improper lifting jacket to be allowed to give signals to the crane
personnel - Inadequate Placing operator.
of CRANE - Crane outriggers shall be extended fully.
- High wind velocity - Ground shall have hard surface & Outrigger pads
- Improper fall to be used.
protection - Area around the work place shall be barricaded to
stop unauthorized entry.
- No body should stay under suspended load or
move through the operating radius of boom.
- The weight of the load shall be taken smoothly
without allowing it to jerk.
- Work shall not be performed in case of high wind
velocity i.e. 25km/hr
- Safety harness shall be used while working at
boom for slinging, assembling and de-
assembling.
- Proper stand shall be used for access to boom for
JOB SAFETY ANALYSIS SHEET
work.
- Dismantled boom will be placed on boom stand
properly.
- House keeping will be done before and after the
completion of job.
Note:
1) Un-concerned personnel should stay at least 10 Ft. away from lifting area.