Questions PMP
Questions PMP
Questions PMP
Which category defines the Salience model used to prioritize stakeholder needs:
1 point
Functional
Weak Matrix
Strong Matrix
Projectized
Project Charter
Stakeholder Register
Power/Influence Grid
Position/Power Grid
5. Team members report to you, and you’re responsible for creating the budget,
building the schedule, and assigning the tasks. When the project is complete, you
release the team so they can work on other projects for the company. What kind of
organization do you work in?
1 point
Functional
Weak Matrix
Strong Matrix
Projectized
1
managed together because the goal is vital to the success of the company. This is
an example of:
1 point
A Portfolio
A Program
A Project
A enterprise environmental factor
Temporary
Strategic
Unique Result
Progressively Elaborated
Project Charter
Stakeholder Register
Power/Influence Grid
Position/Power Grid
10. A project manager has not been assigning to a project yet but the statement of
work has been completed. A committee is planning on meeting with the sponsor
before selecting a project and assigning a project. What technique is being used to
select a project?
1 point
Murder Board
Stakeholder Meeting
Earned Value Selection
Return on Investment
2
Sponsoring the project
Directive
Supportive
Value-driven
Controlling
14. A large organization has adopted an Agile approach but has multiple Scrum
teams and is struggling with coordinating theirs across teams. What would you
suggest that could solve this?
1 point
Agile Software
Scrum of Scrums
Gantt Charts
All hands meeting
User Story
Product backlog
Sprint backlog
Product increment
Transparency
Adaption
Simplicity
Inspection
Eliminate bottlenecks
Calculate Little's Law
Limit work in a queue
Improve efficiency of team
3
1 point
Deliver fast
Manage flow
Eliminate waste
Defer decisions
19. The Agile triangle of constraints I said to be inverted from the traditional triangle
because it allows:
1 point
21. Which of the following is not one of the primary servant leadership duties?
1 point
22. Kouzes and Posner did a 10-year study interviewing 75,000 people about
leadership characteristics, values, and traits they admire. What was not in the
highest-rated responses?
1 point
Honesty
Forward-looking
Inspiring
Technical Skills
Courage
Simplicity
Respect
Adaptable
4
Continuous delivery
Welcome change
Continuous improvement
Welcome learning
25. Management and leadership have different focuses on Agile projects. Who
focuses on doing the right things?
1 point
Management
Leadership
Neither
Both
27. Which of the following would you recommend an organization does first when
trying to become an "Agile" organization?
1 point
Think
Do
Encourage Others
Small changes
28. According to the Agile Manifesto Individuals and interactions are preferred over:
1 point
Comprehensive documentation
Customer Collaboration
Processes and tools
Following a plan
29. Which management plan is not part of the Project Management Plan?
1 point
5
delayed by five weeks. Use PERT to calculate a three-point estimate for this
project.
1 point
28.83 Weeks
27.5 Weeks
28.3 Weeks
27 Weeks
32. A project has a limited budget and cannot meet everyone's expectations. The
Project Manager holds a vote to determine the top priority for the project. The
project manager counts the votes but ignores the vote and makes his own decision
on top priority and the team abide by his decision. Which group decision-making
technique is the Project Manager displaying?
1 point
Unanimity
Majority
Plurality
Dictatorship
33. A Project Manager has delayed an activity purposely to give the preceding
activity more time to complete and remove pressure on developers. This is an
example of:
1 point
A Lead
A Lag
Crashing
Decomposition
34. The sponsor wants to make a change to a project that initially was to build 10
houses but now has the extra budget to add 2 more houses to the site. What should
do the project manager do next to implement the change?
1 point
6
35. What is used by the project manager and his or her designees in order to
approve all project work throughout the course of a project?
1 point
36. You are managing a project for a company that has previously done three
projects that were similar to it. You consult with the cost baselines, lessons learned,
and project managers from those projects, and use that information to come up with
your cost estimate. What technique are you using?
1 point
Three-Point Estimation
Analogous Estimating
Parametric Estimating
Bottom Up Estimating
38. The project manager has held a meeting where all stakeholders got an
opportunity to put forward requirements and discuss them within the group. This
technique is called:
1 point
Interviewing
Focus Group
Collect Requirements
Facilitated Workshop
39. The Project Manager has identified work packages and added them to the WBS
dictionary. Which process is the Project Manager in?
1 point
Create WBS
Identify Requirements
Decomposition
Define Scope
40. An Activity List and Milestone List are outputs of which process:
1 point
7
Create Activities
Define Activities
Sequence Activities
41. A team member estimates that Task A will most likely be finished in 30 days.
The best-case scenario is that it could be finished in 24 days, and the worst-case
scenario is that it would take 36 days. You would like estimates for expected
completion. Based on this information, calculate Standard Deviation
1 point
2 Days
6 Days
24 Days
Don't have enough information
Plan as You Go
Design Plan Execute
Non-stop Planning
Bottom Up Estimating
43. Which of the following is NOT a tool or technique used in Estimate Activity
Durations?
1 point
SWAG Estimates
Analogous Estimation
Parametric Estimating
Three-Point Estimation
44. A project is 50% complete and is has a task that is not on the critical path that is
awaiting to finish until another task is completed. What type of Dependency
Determination:
1 point
Finish-to-Start
Mandatory Dependency
Critical Path Dependency
Finish-to-Finish
45. Which option is not a baseline part of the Project Management Plan:
1 point
Scope Baseline
Cost Baseline
Schedule Baseline
Budget Baseline
8
Project Scope Statement, WBS and WBS Categories
Project Statement of Work, WBS and WBS Dictionary
Project Scope Statement, RBS and WBS Dictionary
Project Scope Statement, WBS and WBS Dictionary
Systems Engineering
Value Engineering
Value Analysis
Business Analysis
48. A Project Team has finished a task early and decided to modify the feature to
be self-efficient and save the Sponsor money and time in the future in maintenance
fees. When the Project Manager is shown the updated feature with the modification
but isn't happy why?
1 point
Finish to Start
Project Schedule Network Diagram
Dependency Determination
Precedence Diagramming Method
51. In a building project to construct a 100-foot wall, and the client comes to the
team and asks them to increase the length of the wall by one foot. The builder is on
schedule and it will make no difference to them to build just one foot of the wall;
therefore, they go ahead and build the extra length of the wall. This is an example
of?
1 point
Gold Plating
Extra Requirements
Scope Creep
Successful Project
9
52. How would you best describe the Delphi Technique?
1 point
It is Agile
It illustrates scope and time
It illustrates cost and time
It is a leading indicator
54. Which of the following is not a form of frequent validation and verification?
1 point
Unit Test
Retrospective
Stand-up Meeting
Iteration Demo
55. When it comes to customer valued prioritization in Agile which of the following is
not a tool used to keep track of customer priorities?
1 point
Product Backlog
Feature List
Prioritized Requirements List
Customer Priority Backlog
Delighters
Satisfiers
Dissatisfies
Indifferent
10
Write test, refactor, write code
Write test, write code, refactor
59. A Sponsor wants to evaluate a 5-year project against 3 projects what financial
metric should they use?
1 point
NPV
ROI
ROIT
IRR
60. Which of the following is not one of Poppendick's list of seven wastes?
1 point
Defects
Motion
Work completed
Over-processing
Build tools
Unit testing
Schedulers
Test tools
64. The Product Owner has hired an expert tester to find any edge case scenarios
which could impact the product performance. What type of tests will this expert
perform on the product?
1 point
Exploratory tests
Usability tests
Scripted tests
Expert tests
11
65. In MoSCoW the M stands for:
1 point
Must
Most
Might
Maybe
66. A project sponsor has been asked to choose between project A which will return
$150,000 over 18 months and project B which will return $450,000 over 3 years.
What is the best approach to select a project?
1 point
67. If the CPI is high and the SPI is low the project is:
1 point
68. "Money for nothing" in Agile contracting created by Jeff Sutherland means:
1 point
70. What formula demonstrates that the duration of the work queue is dependent on
its size?
1 point
Theory of constraints
Little's Law
Work In Progress
Kanban Board
12
71. You have been tasked with selecting a contract for a project where the scope
has been roughly estimated so the schedule variance is expected. What would be
the best contract to use for this situation?
1 point
74. What is the difference between Quality Audit and Process Analysis?
1 point
Quality Audit done in Quality Assurance, Process Analysis done in Perform Quality Control
Quality Audit identifies improvements in process, Product Analysis inspects the process
Quality Audit inspects the process, Process Analysis identifies improvements in process
They are the same thing
76. Which tool of Quality uses the 80/20 Rule to identify top priority defects?
1 point
Fishbone Diagram
Pareto Chart
Histogram
Flowchart
13
Forming, Storming, Progressing, Performing, Leaving
Forming, Storming, Norming, Performing, Leaving
Forming, Storming, Norming, Performing, Adjourning
Forming, Storming, Progressing, Performing, Adjourning
Smoothing
Confrontation
Compromise
Forcing
80. A Project Manager has hired an external company to review the process the
team is using during the project. The external company uses Six Sigma to inspect
the processes. What is the purpose of the external company?
1 point
81. You’re working with an audit team to check that your company’s projects all
meet the same quality standards. What process is being performed?
1 point
Edward Deming
Conor McGregor
Elliot Kaizen
Abraham Maslow
83. Which of the following is not one of the 7 Basic Tools of Quality?
1 point
Pareto Chart
Fishbone Diagram
14
Quality Audit
PMP Practice Mock Exam
85. Susan and Tom are currently in total disagreement overestimates given to a
feature. The Project Manager has sat down with both of them to determine the
source of the conflict. Which process is he currently in?
1 point
Develop Team
Control Team
Manage Team
Acquire Team
86. A team is learning about other member's habits and learn to work together.
What stage in team development are they in?
1 point
Forming
Norming
Performing
Storming
Develop Team
Plan Resources Management
Manage Team
Acquire Resources
Leadership
15
Speaking
Coaching
Communication
91. The Project Manager reviews all documents created by the team and ensures
they are punctual in their attendance. What type of Project Manager is this?
1 point
Theory X
Theory Y
Theory Z
Theory A
Salaries
Resources
Technical Opinions
Priorities
McGregor
McClelland
Herzberg
Maslow
94. Which of the following is not a kind of Power defined by French and Raven?
1 point
Reward
Proven
Expert
Referent
95. You are at the beginning of executing the project and need to make work
assignments for the team. Which process should you perform?
1 point
Develop Team
Acquire Team
Manage Team
Preassignment
16
96. What is not an output of the Direct & Manage Work Process?
1 point
98. Which of the following enables you to compare the planned performance with
actual performance?
1 point
99. Team members respect the Project Manager due to their in-depth knowledge of
the product. What type of Power does the Project Manager have?
1 point
Reward
Expert
Referent
Legitimate
Develop Team
Plan Resources Management
Manage Team
Acquire Team
101. Which of the following is not an input to Direct and Manage Process?
1 point
17
102. What is a defect once repaired?
1 point
Validated Change
Deliverable
Implemented Defect Repair
Repurposed Defect Repair
Quiet Writing
Round-Robin
Free-for-All
Wideband
104. Team members are having a heated argument which has got personal. Which
level of conflict is this?
1 point
Level 1
Level 2
Level 3
Level 4
05. The sponsor is talking to the Product Owner regarding the future of the project
as it ensures if the project still meets the customer needs due to a recent
environmental change. The Product Owner can only think about how this is going to
impact his project. What level of listening is he engaged in?
1 point
Focused listening
Internal listening
Global listening
Active listening
106. Which of the following is not one of the stakeholder engagement principles?
1 point
107. You are assigned a new project team that badly needs to facilitate a kick-off
meeting. What can you expect to be responsible for in this meeting?
1 point
Ground Rules
Goal Setting
Meeting Minutes
Timing
18
108. The team needs to gather feedback on the proposed system and asked the
Product Owner to provide a low-fidelity prototype so they can model their solution.
What technique are they proposing the PO use?
1 point
Wireframe
Persona
Definition of Done
Agile Modelling
Valuing participation
Understanding complex problems and process
Building relationships and understanding
Procedural decision making
110. Which question can you not expect answered in the W5H on the Agile
Charter?
1 point
Story Map
Definition of Done
Burn charts
Retrospective findings
Phone
Instant Messenger
Email
Video Recording
113. The team is using fist of five voting and one team member has shown 5
fingers. What does this signify?
1 point
19
114. The team leader has mastered his own feelings by attending a workshop.
What stage would be next for them to eventually be able to influence others?
1 point
Self-Management
Social-Skills
Social-Awareness
Self-Awareness
115. The team lead wants to communicate the iteration goals to all stakeholders in
a project. What communication model would you recommend they use to best
ensure the goals are communicated and understood?
1 point
Face-to-face
Two Way
Dispatch
Informal
116. the team is in the middle of the estimation process and the Scrum Master has
decided that not everyone in the room has the correct information at hand. Agile
knowledge sharing is designed to:
1 point
Leverage electronics
Maximize resources
Make information available
Get accurate estimates
117. The customer has described the feature as best as they could to the product
owner who created the story. The developer works on the story but it turns out to be
completely different to what the customer expected. What best describes this
situation
1 point
Use Cases
Data Diagram
Screen Designs
Flow Diagram
20
119. The Scrum Master is running a facilitated workshop technique so Agile
stakeholders can better understand a complex issue. What technique would you
expect the Scrum Master to implement?
1 point
120. The team leader is empowering the team members to solve the issue
themselves. What level of conflict is this?
1 point
Level 1
Level 2
Level 3
Level 4
Estimation
Forecast
Dependency
PERT
123. To forecast any potential cost and/or schedule deviations in the project at
completion is the purpose of what?
1 point
Forecasting
Trend Analysis
Monte Carlo Analysis
Earned Value Management
Control Scope
Validate Scope
Validate Work
Close Project
21
125. You are new to a project and been provided with an S curve diagram where
the Actual Cost is more than the Earned Value and the Planned Value is greater
than the Earned Value. What is your interpretation of the project's status?
1 point
126. Ensuring change requests are agreed upon and managing changes when they
occur best describes:
1 point
Control Scope
Perform Integrated Change Control
Implemented Defect Repair
Integrated Scope Control
127. A customer has raised a change request which will add $125,000 extra value
to the project and ensure the project is considered a success. The change has
already been approved by the change control board, what should the project
manager do next?
1 point
128. A brand new request from a customer that will not affect the scope and have a
financial impact of $18,000 if not implemented within 1 week has been requested.
What should the project manager do next?
1 point
129. You are working on a project with a PV of $56,733 and an SPI of 1.2. What’s
the earned value of your project?
1 point
$47,277.50
$68,000
$68,079.60
0,72
22
1 point
Change Requests
Risk Strategies
Legal Procurement Risks
Organization Process assets
131. A change has been approved for the scope of a project. The change will take 3
weeks extra and cost $200,00 extra to complete the project. What should the
project manager do next?
1 point
Change Requests
Work Performance Data
Schedule Data
Project Calendars
Product Reviews
Walkthroughs
Reviews
Project Reviews
SPI
CPI
TCPI
CV
135. How can the project manager determine the actual progress of a project?
1 point
Project Report
Scope Plan
Project baselines
Discuss with team
136. A project to undergo the construction of a garage is halfway through and spent
$5,4000 to date. The wrong heating materials were used and going to cost an
23
estimated $4,000 to remove and upgrade. The complete budget is $11,700. What
variable would you use to represent $5,400?
1 point
PV
BAC
EV
EAC
137. If a project has spent $15,000 over budget but has an SPI of 1.15 how would
you best describe it?
1 point
138. The project manager is comparing the old scope baseline to the new baseline
after a series of critical changes. What technique is he doing?
1 point
Trend Analysis
Variance Analysis
Variable Analysis
Creating WBS
SV
SPI
EV
Float
140. How can the project manager determine the actual progress of a project?
1 point
Project Report
Scope Plan
Project baselines
Discuss with team
Validated Scope
Execute & Manage Work
Control Scope
Monitor & Control Project Work
24
142. You are working on a project with an SPI of 1.10 and CPI of 1.3
1 point
143. There are several changes that need to be made, and you need to decide how
to apply project resources in order to implement them. What does the project
manager do next?
1 point
144. A team is trying to determine which changes need to undergo change control.
The testing team does not think defects need to go through change control as it is
the one piece of work. Which of the following is not true?
1 point
Corrective actions
Preventive actions
Defect repairs
Process repairs
147. You have been assigned as Product Owner to a new project with a distributed
team. What would be the most beneficial to the team's productivity before the
project starts?
1 point
25
Bonuses for delivering early
148. Which level would you expect the highest level of conflict?
1 point
Forming
Norming
Performing
Storming
Absence of Trust
Over Commitment
Inattention to Results
Fear of Conflict
150. Which stage of Tuckman's team formation can you expect the team to be in
when you are delegating tasks?
1 point
Forming
Norming
Performing
Storming
151. Which chart would the PO look at if they wanted to know the impact of
modifying the scope of a project?
1 point
Burn up Chart
Burn down Chart
Story Histogram
Scope Risk Chart
152. Which Agile team role does not belong in this group?
1 point
Product Owner
Scrum Master
Coach
Team Leader
153. A new team member is trying to work the printer but doesn't realize that it
needs to plug into a certain extension lead or else it cuts out the coffee machine.
This knowledge is best described as?
1 point
Formal Knowledge
Explicit Knowledge
Tacit Knowledge
Codified Knowledge
26
154. High performing team would be expected to have all the following
characteristics except:
1 point
Training
Coaching
Mentoring
Supporting
156. Which of the following is not one of Dreyfus's model of adult skill acquisition?
1 point
Novice
Moderately Proficient
Advanced Beginner
Expert
Listening Game
Plus/Delta
Collaborative Origami
123 Go
12
14
20
6
27
Self Organizing
Consensus Driven
Constructive Disagreement
Motivated by SMART goals
161. A new Scrum Master is creating a list of digital tools that the distributed team
can use to communicate effectively which of the following will not be on his list?
1 point
Skype
Interactive Whiteboard
Virtual Card Walls
Osmotic Transmitter
Closing
Planning
Monitoring & Control
Define scope
Closed contracts
Acceptance of project
Lessons learned
Organization process asset updates
165. Which of the following does NOT take place during closing?
1 point
166. In which process group does a change to design cost the most to the project?
1 point
Initiating
Planning
28
Executing
Closing
167. You are preparing to close a project you have been managing. Which of the
following is not an input to the Close Project or Phase process?
1 point
Acceptance criteria
Project deliverables validated through the quality control process
Project management plan
Project audits
Historical information
Project files
Final project audits
Project close documents
Formal acceptance
Procurement sign-off
Document lessons learned
Procurement audit
170. The team have under estimated a user story and the developer tasked with the
story is new to the team and doesn't want to leave team down by delivering only 6
instead of 10 story points. You are the PO what should you do?
1 point
The Card
The Conversation
The Confirmation
The Customer
172. A team lead has been tasked to research a technology the team is planning on
using in the next sprint. What is the name of this task?
1 point
29
Story Research
173. The project team is using wideband Delphi to estimate user stories. What
pitfalls should wideband Delphi not help avoid
1 point
HIPPO
Bandwagon
Groupthink
Guesstimates
174. At the estimation session, the team determined that the user story is too big to
be delivered and removed it from the iteration planning session. This type of user
story so best described as:
1 point
Compound Story
Decomposition
Complex Story
Sliced Story
Done in planning
Be avoided
Be recommended
Done by Sponsor
176. A set of features have been drafted and the next step is to prioritize the list.
Whose responsibility is this?
1 point
Product Owner
Stakeholder
Project Team
Scrum Master
177. The engineer has been given one day to perform the required task to
determine if the project is worth investing in. What is this called?
1 point
Risk-based Spike
Arch-based Spike
Defect Repair
Estimate stories
178. When writing user stories what characteristics should they not have?
1 point
Independent
Negotiable
30
Small
Valuable
179. What is the process the team follows when iteration planning?
1 point
180. The PO is looking to identify missing stories and prioritize stories for releases
what should they do?
1 point
Backlog grooming
Story Mapping
Planning Poker
Business Meeting
181. A team member keeps attending the daily stand-up late, what is the best
option for the Scrum Master do to stop this from happening?
1 point
182. The retrospective and daily stand up meeting are best described as a:
1 point
Process Meetings
Agile Meeting
Business Meeting
Time boxing Meeting
183. A new engineer has failed to refactor their code by the end of the sprint and
didn't inform the PO as it was not noticed in the iteration review. What will be the
biggest impact of this?
1 point
Technical Debt
Customer Complaints
Business Complaints
Poor Team Morale
184. A product has been released to production but a customer has discovered a
bug in the code. What type of defect is this?
1 point
Escaped defect
31
Source Code Defect
Discovered Defect
Minor Defect
185. Which activity won't help us find issues earlier on the cost of change curve?
1 point
Pair Programming
Modelling
Risk Adjusted Backlog
Continuous Integration
Assigned by PO
Risk x Severity
Threats x Cost
Impact x Probability
187. Two engineers have used their coding skills to design an algorithm to improve
testing. This is scenario is an example of what failure mode?
1 point
Gather feedback
Making mistakes
Creatures of habit
Inventing rather than research
We are inconsistent
We make mistakes
We are malleable
We are creatures of habits
189. There has been a new team member assigned to a team and they discovered
a bug. The PO prioritizes bugs based on the 80/20 rule. What technique does the
team member uses to determine the reason for the bug?
1 point
Histogram
Fishbone Analysis
Pareto Chart
Pair Programming
190. The project team has recently started using Kanban but never set any WIP as
the company director insisted the more work the team can work in progress the
better. This decision will not result in what?
1 point
32
Higher Throughput
Hide Bottlenecks
Hide Rework
Higher Risk
Lead Metric
Lag Metric
Useful Metric
Unreliable Metric
192. An engineer has been out sick for 2 days, what type of variation is this?
1 point
Special Cause
Exceptional Cause
Common Cause
Traditional Cause
Explorers
Shoppers
Vacationers
Participating
Intolerant
Heavy
Untried
Disciplined
196. A company has been using Agile for over 9 months. When should a company
stop tailoring the process?
1 point
Shu-Ra-Ri
Never
18 months
12 months
33
197. The project team does not use which of the following feedback methods in
XP?
1 point
Refactoring
Pair Programming
Testing
Simple Testing
198. The project team has spent 3 weeks creating a value stream map but have
never included the delay between internal teams. For this reason which metric will
be directly affected in the value stream map?
1 point
199. The Scrum Master is setting the tone of the meeting and getting the team on
board. Which technique should they not be using?
1 point
Check In
ESVP
Triple Nickels
Working Agreements
Plan-Develop-Check-Learn
Plan-Do-Check-Act
Plan-Develop-Evaluate-Learn
Kaizen
34