Rekapitulasi: Bill of Quantity
Rekapitulasi: Bill of Quantity
Rekapitulasi: Bill of Quantity
PROJECT : ?????????????????????????????????????????????
LOCATION : ?????????????????????????????????????????????
REKAPITULASI
No. URAIAN PEKERJAAN TOTAL
TOTAL #REF!
VAT. (PPN) 10 % #REF!
GRAND TOTAL #REF!
GRAND TOTAL (PEMBULATAN)
TERBILANG :
CATATAN:
1. Estimasi Biaya hanya berlaku tiga minggu setelah dikeluarkan.
2. Harga Franco Jakarta
3. Sistem Pembayaran:
- Termin I atau sebesar 35% - sebagai Down Payment
- Termin II atau sebesar 30% - setelah progrees 50%
- Termin III atau sebesar 20% - setelah dikirim
- Termin IV atau sebesar 10% - setelah progrees 100%
- Termin V atau sebesar 5% - Retensi satu bulan setelah pekerjaan selesai
4. Pekerjaan akan dimulai setelah Termin I diterima.
5. Biaya Listrik dan Penerangan diluar jam kerja (Apabila Lembur) dibebankan kepada owner.
Hormat Kami,
(________________________)
BILL OF QUANTITY
PROJECT : ???????????????????????????????????????
LOCATION : ???????????????????????????????????????
A PRELIMINARIES (PERSIAPAN)
1 Material Handling 1.00
2 Security (safety deposit) 1.00
3 Hoarding Partition (+/- 25m2) 1.00
4 Fire retardant (building regulation) 1.00
5 Demolition, to prepare construction work incld cleaning & clearing 1.00
6 misscelaneous (lain-lain) 1.00
SUB TOTAL A
B FIT OUT
I Flooring
III Ceiling
Sub Total B-III
Sanitary Bathroom
SUB TOTAL C
D LOOSE FIXTURE
I Ready made
E ART WORK
SUB TOTAL E
SUB TOTAL F
Tanggal :????????????????????
SAT HARGA SATUAN JUMLAH HARGA KETERANGAN
(Rp) (Rp)
no Rp 750,000.00 Rp 750,000.00
no Rp - by owner
no Rp 3,000,000.00 Rp 3,000,000.00
no Rp - by owner
no Rp 5,000,000.00 Rp 5,000,000.00
no Rp 2,500,000.00 Rp 2,500,000.00
Rp 11,250,000.00
-
-
-
-
-
by Architect
-
BILL OF QUANTITY (SUPERIOR ROOM)
ITEM PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA KETERANGAN
NO
(Rp) (Rp)
A PRELIMINARIES (PERSIAPAN)
1 Material Handling 1.00 no Rp 750,000.00 Rp 750,000.00 incld. Twin Type
2 Security (safety deposit) 1.00 no by owner incld. Twin Type
3 Hoarding Partition (+/- 25m2) 1.00 no Rp 3,000,000.00 Rp 3,000,000.00 incld. Twin Type
4 Fire retardant (building regulation) 1.00 no by owner incld. Twin Type
5 Demolition, to prepare construction work incld cleaning & clearing 1.00 no Rp 5,000,000.00 Rp 5,000,000.00 incld. Twin Type
6 misscelaneous (lain-lain) 1.00 no Rp 2,500,000.00 Rp 2,500,000.00 incld. Twin Type
SUB TOTAL A Rp 11,250,000.00 incld. Twin Type
B FIT OUT
I Flooring
1. Vinyl TV-013 White Oak (Incld. Tukang), 152,4x914,4x3 MM (24 Planks: 3,34m²) 3.00 box 550,000.00 1,650,000.00
2. Elise Red Tegel, 200x200 MM (Incld. Tukang) 5.00 m² 345,000.00 4,725,000.00
3. Basalt Granite Tile Cream 1200x600 MM (incld. Tukang) 3.00 m² 150,000.00 450,000.00
Sub Total B-I 6,825,000.00
C Sanitary Bathroom
1. Kohler Floor Drain K-15477 T CP 1.00 set 1,250,000.00 1,250,000.00
2. Door Handle polished Chrome 1.00 set 366,000.00 366,000.00
3. Tissue Holder, TOTO X703AES Paper 1.00 set 205,000.00 205,000.00
4. Dush Bin with black cover 1.00 set 360,910.00 360,910.00
5. Kohler PK VEIL YES/19 closet kran wastafel shower 1.00 set 10,140,000.00 10,140,000.00
6. Kaca Kamar Mandi Tempered 8 MM with frame 1.00 set 1,700,000.00 1,700,000.00
7. Rack Towel Stainless Steel 1.00 set 96,000.00 96,000.00
8 Hair Dryer Hoffmann HFM811 1.00 set 461,000.00 461,000.00
9. Jet Spray 1.00 set 945,000.00 945,000.00
E ART WORK
1. Lukisan Batik Motif Burung Hong 1000x500 MM 1.00 set 550,000.00 550,000.00
SUB TOTAL F
Sub Total (A-F) 73,564,410.00
BILL OF QUANTITY (EXECUTIVE SUITE ROOM)
ITEM PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA KETERANGAN
NO
(Rp) (Rp)
A PRELIMINARIES (PERSIAPAN)
1 Material Handling 1.00 no Rp 750,000.00 Rp 750,000.00 incld. Twin Type
2 Security (safety deposit) 1.00 no by owner incld. Twin Type
3 Hoarding Partition (+/- 25m2) 1.00 no Rp 3,000,000.00 Rp 3,000,000.00 incld. Twin Type
4 Fire retardant (building regulation) 1.00 no by owner incld. Twin Type
5 Demolition, to prepare construction work incld cleaning & clearing 1.00 no Rp 5,000,000.00 Rp 5,000,000.00 incld. Twin Type
6 misscelaneous (lain-lain) 1.00 no Rp 2,500,000.00 Rp 2,500,000.00 incld. Twin Type
SUB TOTAL A Rp 11,250,000.00 incld. Twin Type
B FIT OUT
I Flooring
1. Vinyl TV-013 White Oak (Incld. Tukang), 152,4x914,4x3 MM (24 Planks: 3,34m²) 81.70 box 550,000.00 44,935,000.00
2. Elise Red Tegel, 200x200 MM (Incld. Tukang) 15.00 m² 345,000.00 4,725,000.00
3. Basalt Granite Tile Cream 1200x600 MM (incld. Tukang) 15.00 m² 150,000.00 2,250,000.00
4. Plain Red Tegel, 200x200 MM (incld. Tukang) 15.00 m² 200,000.00 3,000,000.00
Sub Total B-I 54,910,000.00
II
Wall / Partition / Doors & Windows
Wall Partition
1. Cat tembok nippon paint Abacadabra, 5 kg 91.80 m² 115,000.00 10,557,000.00
2. Wall Panel Wood Bamboo, 15 MM, hard cutting board strips 13.00 no 103,000.00 1,339,000.00
3. Bamboo Wood Boards, 19 MM 13.00 no 130,000.00 1,690,000.00
4. Wall Panel, Plywood 15 MM 26.67 m² 150,000.00 4,000,500.00
Finishing Bioduco Beige
5. Wallpaper Orion Beige, roll 10,05x0,53 m 8.00 roll 337,000.00 2,696,000.00
Pintu Swing (Single Door)
6. Pintu Kamar Mandi motif Krapyak 3.00 set 3,500,000.00 10,500,000.00
Frame Pintu Solid Meranti 50x150 MM
Finishing Melamic, HPL
7. Pintu Swing (Single Door) Kamar Executive 2.00 set 1,700,000.00 3,400,000.00
Frame Pintu Solid Meranti 50x150 MM
Finishing Melamic, HPL
8 Pintu Swing (Double Door) Kamar Executive 1.00 set 5,500,000.00 5,500,000.00
Frame Pintu Solid Meranti 50x150 MM
Finishing Melamic, HPL
Door Lock
Door Closer Hidrolik
6. Jendela 12.00 set 3,850,000.00 46,200,000.00
Frame 50x150mm
Kaca Rayban 8mm
7. Dinding Kamar Mandi
Cararra Tiles 7.00 m 128,000.00 896,000.00
C Sanitary Bathroom
1. Kohler Floor Drain K-15477 T CP 3.00 set 1,250,000.00 3,750,000.00
2. Door Handle polished Chrome 3.00 set 166,000.00 498,000.00
3. Tissue Holder, TOTO X703AES Paper 3.00 set 205,000.00 615,000.00
4. Dush Bin with black cover 3.00 set 165,000.00 495,000.00
5. Kohler PK VEIL YES/19 closet kran wastafel shower 2.00 set 10,140,000.00 20,280,000.00
6. Kaca Kamar Mandi Tempered 8 MM with frame 2.00 set 1,250,000.00 2,500,000.00
7. Rack Towel Stainless Steel 2.00 set 96,000.00 192,000.00
8 Hair Dryer Hoffmann HFM811 2.00 set 461,000.00 922,000.00
9. Jet Spray 3.00 set 945,000.00 2,835,000.00
10 Lavatory 1.00 set 2,750,000.00 2,750,000.00
11. Lavatory Fauchet 1.00 set 1,250,000.00 1,250,000.00
12 Closet Body 1.00 set 1,300,000.00 1,300,000.00
E ART WORK
1. Lukisan Batik Motif Burung Hong 1000x500 MM 3.00 set 550,000.00 1,650,000.00
SUB TOTAL F
Sub Total (A-F) 281,062,500.00
BILL OF QUANTITY (LOBBY)
ITEM PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA KETERANGAN
NO
(Rp) (Rp)
A PRELIMINARIES (PERSIAPAN)
1 Material Handling 1.00 no Rp 750,000.00 Rp 750,000.00 incld. Twin Type
2 Security (safety deposit) 1.00 no by owner incld. Twin Type
3 Hoarding Partition (+/- 25m2) 1.00 no Rp 3,000,000.00 Rp 3,000,000.00 incld. Twin Type
4 Fire retardant (building regulation) 1.00 no by owner incld. Twin Type
5 Demolition, to prepare construction work incld cleaning & clearing 1.00 no Rp 5,000,000.00 Rp 5,000,000.00 incld. Twin Type
6 misscelaneous (lain-lain) 1.00 no Rp 2,500,000.00 Rp 2,500,000.00 incld. Twin Type
SUB TOTAL A Rp 11,250,000.00 incld. Twin Type
B FIT OUT
I Flooring
1. Slab Marble Cream Pietra Serena 2500x1300 MM (Incld. Tukang) 154.50 m² 1,597,000.00 246,736,500.00
2. Elise Red Tegel, 200x200 MM (Incld. Tukang) 56.60 m² 345,000.00 19,527,000.00
3. Plain Red Tegel, 200x200 MM(Incld. Tukang) 7.90 m² 200,000.00 1,580,000.00
Sub Total B-I 267,843,500.00
III Ceiling
1. Flat Ceiling Gypsum 11.40 m² 105,000.00 1,197,000.00
Gypsum 9mm Rangka Hollow 40x40 MM
2. Drop Ceiling Gypsum 200 MM 32.40 m¹ 35,000.00 1,134,000.00
Gypsum 9mm Rangka Hollow 40x40 MM
3. Finishing Ceiling 32.40 m² 27,500.00 891,000.00
Cat tembok nippon paint Abacadabra
Kayu Kaso Meranti 70.00 m² 26,000.00 1,820,000.00
Sub Total B-III 5,042,000.00
SUB TOTAL B (I-III) 337,332,500.00
LOOSE FIXTURE
I Ready made
1. Coffe Table 2.00 no 519,000.00 1,038,000.00
2. Targa Armchair 3.00 no 1,913,000.00 5,739,000.00
3. Sofa Targa 1600x840x760 MM 2.00 set 1,382,000.00 2,764,000.00
4. Console Table 2.00 set 700,000.00 1,400,000.00
5. Set Table waiting area 7.00 no 945,000.00 6,615,000.00
6. Armchair waiting area 14.00 no 915,000.00 12,810,000.00
SUB TOTAL F
Sub Total (A-D) 387,556,500.00
BILL OF QUANTITY (ALL DAY DINING)
ITEM PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA KETERANGAN
NO
(Rp) (Rp)
A PRELIMINARIES (PERSIAPAN)
1 Material Handling 1.00 no Rp 750,000.00 Rp 750,000.00 incld. Twin Type
2 Security (safety deposit) 1.00 no by owner incld. Twin Type
3 Hoarding Partition (+/- 25m2) 1.00 no Rp 3,000,000.00 Rp 3,000,000.00 incld. Twin Type
4 Fire retardant (building regulation) 1.00 no by owner incld. Twin Type
5 Demolition, to prepare construction work incld cleaning & clearing 1.00 no Rp 5,000,000.00 Rp 5,000,000.00 incld. Twin Type
6 misscelaneous (lain-lain) 1.00 no Rp 2,500,000.00 Rp 2,500,000.00 incld. Twin Type
SUB TOTAL A Rp 11,250,000.00 incld. Twin Type
B FIT OUT
I Flooring
1. Slab Marble Cream Pietra Serena 2500x1300 MM (Incld. Tukang) 173.60 m² 1,597,000.00 277,239,200.00
2. Elise Red Tegel, 200x200 MM (Incld. Tukang) 35.80 m² 345,000.00 12,351,000.00
3. Plain Red Tegel, 200x200 MM(Incld. Tukang) 13.00 m² 200,000.00 2,600,000.00
4. Black Galaxy Granite 14413 23.50 m² 830,000.00 19,505,000.00
Sub Total B-I 311,695,200.00
II
Wall / Partition / Doors & Windows
Wall Partition
1. Cat tembok nippon paint Abacadabra, 2kg 6.00 m 87,500.00 525,000.00
2. Wall Panel Wood Bamboo, 300 MM, 6.00 no 256,000.00 1,536,000.00
Finishing Cat Duco
4. Pintu Swing (Single Door) 1.00 set 3,500,000.00 3,500,000.00
Pintu motif Krapyak
Frame Pintu Solid Meranti 50x150 MM
Finishing Melamic, HPL
7. Jendela 35.00 set 3,850,000.00 134,750,000.00
Frame 50x150mm
Kaca Rayban 8mm
Sub Total B-II 140,311,000.00
III Ceiling
1. Flat Ceiling Gypsum 174.00 m² 105,000.00 18,270,000.00
Gypsum 9mm Rangka Hollow 40x40 MM
2. Drop Ceiling Gypsum 200 MM 76.02 m¹ 35,000.00 2,660,700.00
Gypsum 9mm Rangka Hollow 40x40 MM
3. Finishing Ceiling 32.40 m² 27,500.00 891,000.00
Cat tembok nippon paint Abacadabra
Sub Total B-III 21,821,700.00
SUB TOTAL B (I-III) 473,827,900.00
I LOOSE FIXTURE
Ready made
1. Dining Table 19.00 set 215,000.00 4,085,000.00
2. Dunbar Dining Chair 64.00 no 950,000.00 60,800,000.00
3. Dunbar Bar Stool 11.00 set 945,000.00 10,395,000.00
Sub Total D-I 75,280,000.00
C II Custom made
1. Bar 1.00 set 5,600,000.00 5,600,000.00
2. Semi Circle Sofa 2.00 set 6,900,000.00 13,800,000.00
3. Bar Rack 1.00 set 3,250,000.00 3,250,000.00
4. Desert Area 1.00 set 1,750,000.00 1,750,000.00
Sub Total D-II 24,400,000.00
SUB TOTAL C 99,680,000.00
D I MECHANICAL, ELECTRICAL & PLUMBING
MECHANICAL & ELECTRICAL By Architect
SUB TOTAL F
Sub Total (A-D) 584,757,900.00
Compatibility Report for BoQ Mock Up Standard
Room.xls
Run on 21/12/2020 22:22
Some cells or styles in this workbook contain formatting that 5 Excel 97-2003
is not supported by the selected file format. These formats
will be converted to the closest format available.