Main Entrance #1
Main Entrance #1
Main Entrance #1
Cadangan Pembangunan Sekolah Antarabangsa Sunway (Sunway International School) Yang Mengandungi
1. Block C –
–
– –
Y
FAL FING S
IL
CAS ERPR DETA
IT
LW
SUNWAY CONSTRUCTION SDN BHD
OO
32.65
SUNWAY INTERNATIONAL SCHOOL
A3
ASE
NV
J180-2612-00
IRC P
STA SP P-
O
T
FF L +
T
T
T
WA
DOCUMENT / DRAWING REVIEW STATUS
32.75
FFLIG+H POINT STATUS A : Approved, no exception taken.
H
No re-fabrication required.
O Proceed with manufacture,
fabrication and/ or construction.
32.75
STATUS B : Approved with comments.
F FL +
Incorporate comments. Revise & Resubmit.
100
DP
DP Proceed with manufacture,
EAD
R
100
mm
ELEC
E
fabrication and/ or construction.
TOW
/
ERH
A WL: cu.m
NK
OV
P FR .0 sqm
LING
MAK REA: 66 2.4 m
LIFT
P TA
/
STATUS C : Rejected.
T 58.4
COO
Incorporate Comments and re-submit.
/
PLI
T
Do not proceed with manufacture,
32.65
POIN
U
fabrication and/ or construction.
/
LOW 5
+32.6
F
ROO
E
FFL +
FFL
-
RC F RW -
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
LAT
/
PP
R E
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
C
TOW
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
/
LING
/ / / / / / / / /
construction, coordination of his work with other trades and full compliance with the contract documents.
/ /
COO
Name:
/
OWE
ING T
.80
/
Company:
FFL +32.65
+35
LOW POINT
L
COO
FFL +32.70
TOW
HIGH POINT
/
FFL
Date:
/
ER
TOW
Cadangan Pembangunan Sekolah Antarabangsa Sunway (Sunway
LING
/
International School) Yang Mengandungi
COO
1. Block C – 1 Block Bangunan Perpustakaan 4 Tingkat
/
R
2. Blok D – 1 Blok Bangunan Sekolah Menengah 6 Tingkat
OWE
3. Blok E – 1 Blok Bangunan Dewan Serbaguna 3 Tingkat Beserta
T
Kemudahan – Kemudahannya. Kantin (Sekolah Menengah) Dan 1 Kebuk
/
LING
Sampah
NT
COO
4. 1 Tingkat Separa Besmen (Tempat Letak Kereta Dan Servis)
TME
/
TREA 75
/
Quay
ROO
/
R
Di Atas Lot PT 896, 897, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30,
LAT
/
RC F
/
/
SUNWAY EDUCATION GROUP SDN. BHD.
/
LEVEL 16, MENARA SUNWAY,
JALAN LAGOON TIMUR, BANDAR SUNWAY,
47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
/
Tel: 03-7491 8622 Fax: 03-5635 8633
/
VOID
COMMERCIAL PARADE SDN. BHD.
ROOF FRP TANK
FFL +32.70
/
LEVEL 3, MENARA SUNWAY,
HIGH POINT
FFL +32.65
JALAN LAGOON TIMUR, BANDAR SUNWAY,
LOW POINT
47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\SUNWAY PROPERTY.jpg
/
Tel: 03-5639 8888 Fax: 03-5639 9992
/
5 BAHARUDDIN ALI & LOW SDN. BHD.
/
217 & 219, JALAN PERKASA SATU,
C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\BAL LOGO-image 2.jpg
/
55100 KUALA LUMPUR,
MALAYSIA.
/
COLD WATER
PUMP ROOM
FFL +32.75
/
SA ARCHITECTS SDN. BHD.
SP PP
MV
EP -
/
N
/
FFL +32.70
FFL +32.65
HIGH POINT
DP 100
LOW POINT
/
/
ZEAL PERUNDING SDN BHD
/
STAIRCASE B1
/
SP PP
NV
T-
/
FFL +32.70
FFL +32.70
HIGH POINT
/
HIGH POINT
/
ng i s ed t hg i r t su j
/
SUNWAY CONSTRUCTION SDN. BHD. (27175-V)
/
/
FFL +32.75
/
M
CAST TO FALL WITH SELECTED
WATERPROOFING SYSTEM TO
/
KST GLASS & ALUMINIUM SDN. BHD.
FFL +32.65 FFL +32.65
3
/ / / / /
DP 100
FFL +32.65
DETAIL
-
-
HIGH POINT
CRW
PP
ENTRANCE-
LEVEL 4 LAYOUT PLAN
YEE
A B C D E F G H KOH
AS SHOWN
F
ROO
No re-fabrication required.
Proceed with manufacture,
LAT
fabrication and/ or construction.
RC F
STATUS B : Approved with comments.
Incorporate comments. Revise & Resubmit.
Proceed with manufacture,
fabrication and/ or construction.
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
F
construction, coordination of his work with other trades and full compliance with the contract documents.
ROO
LAT
Name:
O
RC F
Company:
Date:
35.75
34.75
R E
TOW
FFL.+
Cadangan Pembangunan Sekolah Antarabangsa Sunway (Sunway
m
FFL.+
A WL: cu.m
VOL: NTH 600m
LING
International School) Yang Mengandungi
ANK
UP F 6.0 sqm
MA REA: 6 2.4 m
COO
T 58.4
F
Sampah
ROO
4. 1 Tingkat Separa Besmen (Tempat Letak Kereta Dan Servis)
WER
E
LAT
5. Sebuah Pondok Pengawal Dengan Bilik Kawalan Arahan Kebakaran
K
TO
RC F
6. Ingress Egress Ramps Extension from Existing Kesas Ramps to South
LING
Quay
7. External Works and Other Associated Works
/ / / / / / / /
COO
P3
Di Atas Lot PT 896, 897, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30,
ER
WD
/
31 Dan Sebahagian Simpanan Jalan, Jalan Subang 1 USJ 1, Mukim
TOW
ØR
LING
/
COO
/
WER
SUNWAY EDUCATION GROUP SDN. BHD.
/
(Company No : 146440-K )
O
LEVEL 16, MENARA SUNWAY,
ING T
/
JALAN LAGOON TIMUR, BANDAR SUNWAY,
47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
L
COO
Tel: 03-7491 8622 Fax: 03-5635 8633
/
WER O
/
COMMERCIAL PARADE SDN. BHD.
ING T
W
FLO LEVEL 3, MENARA SUNWAY,
L
COO
/
JALAN LAGOON TIMUR, BANDAR SUNWAY,
T
MEN
/
OOF
ER T
W FLO
/
AT R
FLO W
WAT
/
RC F
W
C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\BAL LOGO-image 2.jpg
/
MALAYSIA.
/
SA ARCHITECTS SDN. BHD.
/
SKYLIGHT
FLOW
FLOW
/
ROOF FRP TANK
/
/
/
/
3° TO FALL
/
ZEAL PERUNDING SDN BHD
Unit 23-3, Block B, Bangunan Jaya One,
3° TO FALL
3° TO FALL
3° TO FALL
Lot 72A, Jalan Universiti, Seksyen 13,
/
46200 Petaling Jaya, Selangor Darul Ehsan
/
Just Right Design Sdn. Bhd.
RC FLAT ROOF
/
3° TO FALL
/
ng i s ed t hg i r t su j
N
/
FFL.+35.75
HIGH POINT
/
SUNWAY CONSTRUCTION SDN. BHD. (27175-V)
/
/
/
KST GLASS & ALUMINIUM SDN. BHD.
4
/
FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW
/
3° TO FALL
3° TO FALL
3° TO FALL
/
/
/
/
ENTRANCE-
ROOF PLAN
/
RC FLAT ROOF
/
/
M
/
3
CASTTO FALL WITH SELECTED
WATERPROOFING SYSTEM TO
/ / / / / / /
/
RC FLAT ROOF
YEE
KOH
AS SHOWN
A B C D E F G H 23-7-2021
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
O correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
Name:
Company:
Date:
5
ZEAL PERUNDING SDN BHD
Unit 23-3, Block B, Bangunan Jaya One,
Lot 72A, Jalan Universiti, Seksyen 13,
46200 Petaling Jaya, Selangor Darul Ehsan
N
P
Just Right Design Sdn. Bhd.
ng i s ed t hg i r t su j
4
KST GLASS & ALUMINIUM SDN. BHD.
ENTRANCE-
M REFLECTED CEILING PLAN
YEE
A B C D E F G H KOH
AS SHOWN
23-7-2021
1 REFLECTED CEILING PLAN
1 : 110 J180-2612/SIS -ENTRANCE-P03
COPYRIGHT
SUNWAY CONSTRUCTION SDN BHD
SUNWAY INTERNATIONAL SCHOOL
J180-2612-00
DOCUMENT / DRAWING REVIEW STATUS
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
Name:
Company:
Date:
6 6
SUNWAY EDUCATION GROUP SDN. BHD.
(Company No : 146440-K )
FLOW
MALAYSIA.
SKYLIGHT
5 5 ng i s ed t hg i r t su j
ENTRANCE-
PARTIAL ROOF PLAN AND
PARTIAL REFLECTED CEILING PLAN
E F E F YEE
KOH
J180-2612/SIS -ENTRANCE-P04
COPYRIGHT
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
Name:
Company:
Date:
F
5. Sebuah Pondok Pengawal Dengan Bilik Kawalan Arahan Kebakaran
0
6. Ingress Egress Ramps Extension from Existing Kesas Ramps to South
T2
2 ADDITIONAL ROOF M.S TRUSSES SECTION VIEW Quay
7. External Works and Other Associated Works
Di Atas Lot PT 896, 897, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30,
1:7 31 Dan Sebahagian Simpanan Jalan, Jalan Subang 1 USJ 1, Mukim
S
Damansara, Daerah Petaling, Selangor Darul Ehsan
US
0E3
T2
TR
TR 2C
US
S
US SUNWAY EDUCATION GROUP SDN. BHD.
TR
(Company No : 146440-K )
T2
LEVEL 16, MENARA SUNWAY,
JALAN LAGOON TIMUR, BANDAR SUNWAY,
47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
T20D TRUSS
E2
Tel: 03-7491 8622 Fax: 03-5635 8633
0
T2 COMMERCIAL PARADE SDN. BHD.
S
SS LEVEL 3, MENARA SUNWAY,
TR 2C
US
U JALAN LAGOON TIMUR, BANDAR SUNWAY,
TR C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\SUNWAY PROPERTY.jpg
T2
T22B2 Tel: 03-5639 8888 Fax: 03-5639 9992
TRUSS
2
0E BAHARUDDIN ALI & LOW SDN. BHD.
T2 217 & 219, JALAN PERKASA SATU,
TAMAN MALURI, CHERAS,
S
C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\BAL LOGO-image 2.jpg
S
US
55100 KUALA LUMPUR,
TR 2C
US
MALAYSIA.
TR
T2
SS
TR 2C
U
US
TR
T20A4
T20A3
T 2
1
0E
T2
T22B2
S TRUSS
US ZEAL PERUNDING SDN BHD
TR
TRUSS
Unit 23-3, Block B, Bangunan Jaya One,
TRUSS
Lot 72A, Jalan Universiti, Seksyen 13,
T20B3 TRUSS 46200 Petaling Jaya, Selangor Darul Ehsan
A5a
5
ng i s ed t hg i r t su j
T21D
A5
T23
T20B2 TRUSS
T21B
T21A
T21
T22
TRUSS
TRUSS
T22B2
TRUSS
KST GLASS & ALUMINIUM SDN. BHD.
TRUSS
TRUSS
TRUSS
TRUSS
TRUSS
T22B1
T20B1 TRUSS T20A1 TRUSS T20A1 TRUSS T20A1 TRUSS T20A1 TRUSS TRUSS
4
TRUSS
TRUSS
TRUSS
TRUSS
TRUSS
ENTRANCE-
T22A
T22A
T22A
T22A
T22A
ADDITIONAL ROOF M.S TRUSSES
SHOWN LAYOUT PLAN
YEE
KOH
AS SHOWN
A B C D E F G 23-7-2021
ng i s ed t hg i r t su j
LEVEL 6
Cadangan Pembangunan Sekolah Antarabangsa Sunway (Sunway
International School) Yang Mengandungi
1. Block C – 1 Block Bangunan Perpustakaan 4 Tingkat
2. Blok D – 1 Blok Bangunan Sekolah Menengah 6 Tingkat
3. Blok E – 1 Blok Bangunan Dewan Serbaguna 3 Tingkat Beserta
Kemudahan – Kemudahannya. Kantin (Sekolah Menengah) Dan 1 Kebuk
Sampah
4. 1 Tingkat Separa Besmen (Tempat Letak Kereta Dan Servis)
5. Sebuah Pondok Pengawal Dengan Bilik Kawalan Arahan Kebakaran
6. Ingress Egress Ramps Extension from Existing Kesas Ramps to South
Quay
7. External Works and Other Associated Works
Di Atas Lot PT 896, 897, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30,
31 Dan Sebahagian Simpanan Jalan, Jalan Subang 1 USJ 1, Mukim
Damansara, Daerah Petaling, Selangor Darul Ehsan
1 SECTION `M' (ROOF DETAIL) BAHARUDDIN ALI & LOW SDN. BHD.
217 & 219, JALAN PERKASA SATU,
1 : 30 C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\BAL LOGO-image 2.jpg
ROOF LEVEL
ng i s ed t hg i r t su j
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and YEE
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
KOH
Name:
AS SHOWN
Company:
23-7-2021
Date:
2 SECTION `O' (ROOF DETAIL) J180-2612/SIS -ENTRANCE-S02
1 : 30
COPYRIGHT
LEVEL 5
ng i s ed t hg i r t su j
LEVEL 5
KST GLASS & ALUMINIUM SDN. BHD.
STATUS C : Rejected.
FINISH POWDER COATED Incorporate Comments and re-submit.
Do not proceed with manufacture,
YEE
LOCATION BLOCK A fabrication and/ or construction.
- ENTRANCE CANOPY Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
KOH
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
SCALE TO FIT
Name:
23-7-2021
Company:
J180-2612/SIS -ENTRANCE-LV-SH1
Date:
COPYRIGHT
LEVEL 5 LEVEL 5
GLAZING TYPE
LEVEL 6
ZEAL PERUNDING SDN BHD
Unit 23-3, Block B, Bangunan Jaya One,
Lot 72A, Jalan Universiti, Seksyen 13,
46200 Petaling Jaya, Selangor Darul Ehsan
ng i s ed t hg i r t su j
LEVEL 5
STATUS C : Rejected.
FINISH POWDER COATED
Incorporate Comments and re-submit.
Do not proceed with manufacture,
LOCATION BLOCK A YEE
fabrication and/ or construction.
- ENTRANCE CANOPY
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and KOH
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
SCALE TO FIT
Name:
23-7-2021
Company:
J180-2612/SIS -ENTRANCE-LV-SH2
Date:
COPYRIGHT
SUNWAY CONSTRUCTION SDN BHD
SUNWAY INTERNATIONAL SCHOOL
J180-2612-00
DOCUMENT / DRAWING REVIEW STATUS
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
Name:
Company:
Date:
OUTSIDE
1 VERTICAL SECTION BLOW UP `A' (ROOF DETAIL) SA ARCHITECTS SDN. BHD.
ng i s ed t hg i r t su j
SUNWAY INTERNATIONAL
ENTRANCE-
VERTICAL SECTION BLOW UP `A'
WITH ALUMINIUM COMPOSITE
PANEL ROOF FIXING DETAIL
YEE
AS SHOWN
LEVEL 6
VERTICAL ALUMINIUM C:\Users\ilyana\Desktop\WFH\#2021\SUNWAY INTERNATIONAL SCHOOL\PROJECT DATA\SIS-USJ Shop Drawing Tittle Block\BAL LOGO-image 2.jpg
217 & 219, JALAN PERKASA SATU,
TAMAN MALURI, CHERAS,
55100 KUALA LUMPUR,
VENTILATION LOUVRES MALAYSIA.
ng i s ed t hg i r t su j
Company:
VERTICAL ALUMINIUM VENTILATION 23-7-2021
1 VERTICAL SECTION BLOW UP `B' (ALUM. VENTILATION LOUVRES DETAIL)
Date: LOUVRES BOTTOM FIXING DETAIL 1 : 10 J180-2612/SIS -ENTRANCE-D02
1:2
COPYRIGHT
ng i s ed t hg i r t su j
OUTSIDE OUTSIDE
SUNWAY CONSTRUCTION SDN. BHD. (27175-V)
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
YEE
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of KOH
construction, coordination of his work with other trades and full compliance with the contract documents.
Name: AS SHOWN
Company: 23-7-2021
Date:
J180-2612/SIS -ENTRANCE-D03
COPYRIGHT
ng i s ed t hg i r t su j
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
OUTSIDE fabrication and/ or construction.
YEE
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of KOH
construction, coordination of his work with other trades and full compliance with the contract documents.
STATUS C : Rejected.
Incorporate Comments and re-submit.
Do not proceed with manufacture,
fabrication and/ or construction.
Submittal/ Drawings are reviewed, processed and execute per Project Requirement. Submittal was reviewed for
conformity and general conformance of the contract documents only. Contractor is responsible for confirming and
correlating dimensions at job site for tolerance, clearance, quantities, fabrication process and techniques of
construction, coordination of his work with other trades and full compliance with the contract documents.
Name:
Company:
OUTSIDE Date:
CANOPY FIXING DETAIL 3. Blok E – 1 Blok Bangunan Dewan Serbaguna 3 Tingkat Beserta
Kemudahan – Kemudahannya. Kantin (Sekolah Menengah) Dan 1 Kebuk
Sampah
1:5 4. 1 Tingkat Separa Besmen (Tempat Letak Kereta Dan Servis)
5. Sebuah Pondok Pengawal Dengan Bilik Kawalan Arahan Kebakaran
6. Ingress Egress Ramps Extension from Existing Kesas Ramps to South
Quay
7. External Works and Other Associated Works
Di Atas Lot PT 896, 897, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30,
31 Dan Sebahagian Simpanan Jalan, Jalan Subang 1 USJ 1, Mukim
Damansara, Daerah Petaling, Selangor Darul Ehsan
3° FALL
SA ARCHITECTS SDN. BHD.
ng i s ed t hg i r t su j
SUNWAY INTERNATIONAL
ENTRANCE-
SECTION `X-X' -(ROOF CANOPY DETAIL)
YEE
KOH
AS SHOWN
23-7-2021
1 SECTION `X-X' (ROOF STAINLESS STEEL SPIDER DETAIL)
1 : 15 J180-2612/SIS -ENTRANCE-D05