Occupational Health, Safety, and Environment Risk Assessment
Occupational Health, Safety, and Environment Risk Assessment
Occupational Health, Safety, and Environment Risk Assessment
Increase Number of
anchorages for floating
pontoon if possible.
Strong River Current
Installation of Floating Pontoon including the Damage to Drilling
If possible, conduct
loading of the drilling machine and accessories. Assets
Flash Floods evacuation should river
current continue to
rise and become
turbulent
Once all stages are finished, the packer is Avoid Bringing small
removed from the borehole. The groundwater Falling of Small and important
Open Borehole
level is measured several times to assess level Items into Hole assets near the open
recovery and static level. borehole.