On-The-Job Training Daily Report
On-The-Job Training Daily Report
On-The-Job Training Daily Report
DAILY REPORT
15
WEEK 1
16
AUGUST 17, 2020
DAY 1 : CAPITOL
On our first day, we had an orientation conducted by Engr. Salen Valdivieso, She briefed us about
the role of Provincial Engineering Office. We were divided into a group of three and assigned to three
divisions; Construction, Maintenance and MTQC. I was assigned in the Material Testing and Quality Control
Division together with Gerald Catulong, Jingle Taripe and Leobel Belluga. We introduce ourselves to the
Engineers assigned in the said division especially to the chief of MTQC, Engr. Jesusa G. Pogado.
17
AUGUST 18, 2020
18
AUGUST 24, 2020
Together with the supervision of Mr. Jhon Bartolome P. Balagulan, lab aid of MTQC division, we
went to the materials laboratory to conduct a sieve analysis and dry unit test of the samples submitted from
one of the project of Mr. Dionesio C. Maslog Jr. In the afternoon, together with Mr. Jun-jun L. Unding and our
co-trainees from the maintenance division, we had a site inspection at the Construction of Lined Laundry and
Motor pool located inside the Capitol, Complex. Mr. Unding explained to us the crucial part of pouring
process in the project that is why it in need to be supervise well. But since it is governed with the Tiongson
Construction, and their site manager is professional and best in handling their workers it went smooth and
Mr. Unding just observed the processed and explained to us scope of the said project.
19
AUGUST 25, 2020
20
WEEK 2
21
AUGUST 26, 2020
DAY 6 : OFFICE
Chief Engr. Jesusa G. Pogado gave us a task to log book all the projects of the MTQC divisions
since 2018-presents, and to rechecked if the previous log book details were lacking data or were need to
be corrected if error occurred. After lunch break, we continued the task that were assigned to us. Since it
DAY 8 : MTQC LABORATORY
had to be done well and there are a lot of remaining projects that are not yet in the log book.
Together with Mr. Balagulan and Engr. Omay we made a total of three reinforced concrete
beam sample from the sample they brougth for their on-going concrete road project. We secured that
the test samples were not going to be disturbed to avoid failing the test and gather a good results.
AUGUST 27, 2020
22
23
WEEK 3
DAY 10 : OFFICE
We were told to solve and gathere the data from the materials laboratory test that they
conduct in the previous lab test and submit it to Chief Engr. Pogado for finalizations. At noon we
were told to continue our work in loging all the projects in the log book, including all the data stored
in the computer.
25
WEEK 4
26
OCTOBER 26, 2020
27
DAY 13 : OFFICE
Today is a usual day. We are now in the office to do some paper work. This day is to put in
excel of our data that collected in our previous site visit. We are task to solve the data we get in site.
Then we make original copy of the papers that the capitol may issue that the site we visit are already get
a sample of and as a result we as a team to work if the soil in the site are pass to the desire data result
of capitol. Then after work by 5:30pm we log out and prepare to go home.
28
WEEK 5
29
NOVEMBER 9, 2020
30
NOVEMBER 12, 2020
31
DAY 18 : SITE VISITATION
We start our day by logging in by 7:30 am. Then we wait for the other engineers to arrive. When
everyone is ready, we went back to the on-going farm-to-market road construction at Maasim,
Sarangani Province which we were yesterday. Today, they checked the road drainage system which is
also simultaneously constructing with the road. We observe the area and see the bare form of the
drainage canal. Afterwards, we eat lunch around the area. We stayed there for a couple of hours and
head back to office around 3pm. We log out at 5:30 pm. Head home straight.
32
WEEK 6
33
NOVEMBER 17, 2020
34
NOVEMBER 19, 2020
DAY 22 : SLUMP TEST
Today is a fine day. We already informed yesterday that there will be a pouring session at a
project site. We log in first at the office and waited for the capitol service. We went straight to the site.
We waited for the mixer truck to arrive. When the mixer truck arrived at the site, the workers started to
pour the ingredients for concrete mixture. Before they start pouring the concrete mix unto the base,
they did a slump test. The slump test will determine the consistency of the concrete. When the mixture
is ready, they start pouring down to the base. We just observe there and waited until they finish
pouring. After that, we went back to the capitol and head home.
35
NOVEMBER 20, 2020
WEEK 7
just observe and listen to them while discussing the other matters of the project. We eat lunch along the
road back to the capitol. We log out by 5:30 pm and went home straight after.
36
DAY 24 : MTQC LABORATORY
In this day 23rd day of November, Engr. Susana Pogado our Division Chief give us a task to
test the beam sample to get the maximum strength of the given sample.
37
DAY 26 : SITE VISITATION
In this day 25th day of November, we went to the Motorpool together with Sir Unding to witness
for pouring of concrete. And also the Engr. For this project give us some tips and techniques on how to
handle your workers to make them dedicated.
38
NOVEMBER 27, 2020
39
DAY 29 : SITE VISITATION
In this day the 1st day of December, we have given a task by our division chief to do some
paper works with the help of Engr. Daugdaug to teach us on how to do with it. As I remember we have
just only a day to finish this papers because this will gonna be pass after a day.
DECEMBER 1, 2020
DECEMBER 2, 2020
40
DAY 31 : SITE VISITATION
In this day the 3 rd day of December, we went to Alabel National High School to witness their
Pouring of Concrete for Beam.
DECEMBER 3, 2020
41
DAY 32 : SITE VISITATION
In this day the 4th day of December, we decided to visit Sarangani Capitol new project because
we do nothing in the office with the permission of our Division Chief to take some picture and to
WEEK 9
observe their project.
42
DECEMBER 7, 2020
43