Overtime Accomplishment
Overtime Accomplishment
Overtime Accomplishment
1 STEELMAN
1 SCAFFOLDER
3 WELDER
1 PAINTER INSTALLATON OF ANCHOR BOLT TEMPLATE AT GL
8 39/F-M AND GL E/24-28 FOR ACCOMPLISHMENT :
3 FOREMAN 14 PEDESTAL INSTALLED
1 LEADMAN
1 PLUMBER
1 TINSMITH
1 QC AIDE INSTALLATION OF FORMWORKS FOR PEDESTAL
6 CARPENTER/MASON 8 AT GL E FOR ACCOMPLISHMENT: 9 PEDESTALS
1 HELPER WITH FORMS AND BRACING
RAW MATER
1 LEADMAN
4 STEELMAN INSTALLATION OF REBARS FOR PEDESTAL AT LINE
8
1 (ADDITIONAL HEIGHT FOR P3 AT GRID 1)
2 HELPER
1 OPERATOR
8 SITE DUST CONTROL
2 SPOTTER
1 ASST MECHANIC 8 ASSIST CHIEF MECHANIC
1 FUEL ASST 8 FUEL MONITORING
1 HILUX DRIVER
8 SERVICE OF EMPLOYEES
1 NHR DRIVER
2 DT DRIVER
1 BACKHOE OPERATOR 8 HAULING OF SOIL AT SEASIDE
1 SPOTTER
MONITORING AND MAINTENANCE OF POWER
2 ELECTRICIAN 88
SUPPLY
2 WAREHOUSEMAN 8 SITE AND WAREHOUSE MONITORING
DISINFECTION AND GENERAL CLEANING AT
1 UTILITY 8
TEMFACIL
1 TIMEKEEPER 8 MONITORING OF MANPOWER
3 SURVEY AIDE 8 CHECKING OF PEDESTAL ALIGNMENT
2 SURVEY CREW 8 CLEARING AND HOUSEKEEPING AT SITE
ACTUAL
NO OF
SCOPE OF WORK POSITION NO OF HRS SCOPE OF WORK
MANPOWER
FINISHED GOODS WAREHOUSE
1 STEELMAN
3 WELDER
N OF ANCHOR BOLT TEMPLATE AT GL 1 PAINTER INSTALLATON OF ANCHOR BOLT TEM
GL E/24-28 FOR ACCOMPLISHMENT : 8
1 FOREMAN AT GL 39/F-M; GL E/24-28; GL N/31
14 PEDESTAL INSTALLED
1 PLUMBER
1 TINSMITH
ION OF FORMWORKS FOR PEDESTAL 1 FOREMAN
5 CARPENTER/MASON FORM PEDESTAL INSTALLATION AT G
OR ACCOMPLISHMENT: 9 PEDESTALS 8
39
WITH FORMS AND BRACING 1 HELPER
WORKS FOR THE FIXATION OF FORM 1 FOREMAN
1 LEADMAN FORM PEDESTAL FIXATION BRACING
OMPLISHMENT:16 PEDESTAL WITH 8
E/31-39
BRACING 2 STRUCTURAL FITTER
FEEDMILL TOWER
SERVICE OF EMPLOYEES