Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Trip Sheet (RIH) : Presented by "Petroleum Capsules" Channel

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Trip sheet (RIH)

Presented by “Petroleum Capsules” Channel

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Tripping

POOH RIH

Wet Dry Close end Open end

Prior to start tripping Operations we’ve to prepare the trip sheet by the following:-

1-Determine the classification of tripping (POOH/RIH).

2-Determine the type of tripping (Wet=close end/Dry=open end).

3-Determine the type of string involved in this operation.

4-Prepare the calculations of metal displacement for the string components.

5-Make your own table to facilitate the calculations.

6-Print the Trip Sheet and start to fill the data.

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
For Example

If you RIH (open end=without float valve) with Drill string consist of the following:-

12 ¼’’ Bit.

6 std. x 8 ¼’’ Drill Collar ID=2.875 in.

6 std. x 6 ½’’ Drill Collar ID=2.8125 in.

80 std. x 5’’ Drill Pipe ID=4.27 in.

Metal Displacement
Type O.D I.D
Close End (Wet) Open End (Dry)
=(O.D)^2/1029.4 =(O.D^2-I.D^2)/1029.4
6xDC 8 ¼’’ 2.875
0.066119 0.058089
6xDC 6 ½’’ 2.8125 0.041043 0.033359
80xDP 5’’ 4.27 0.024286 0.006574

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Trip Sheet
Date Time Rig No.
Trip Type Run In Hole (RIH)

Drill pipe size, in DC size, in


Drill pipe Displacement, bbl./ft. DC Displacement, bbl./ft.
Drill pipe stand/single length ,ft. DC stand/single length, ft.
Drill pipe stand/single displacement, bbl. DC stand/single displacement, bbl.

No of Displacement Cumulative Trip Trip Tank Cumulative Difference between


Std. Cum.
Stands Per Stand/Single Theoretical Tank Level Trip Tank actual displace and
no Differ. + Gain
Tripped Tripped Displacement Level Change Level Change theoretical displace
- Loss
E
A B=A-Ax C=B*Met.Disp D=Dx+C F=E-Ex G=Gx+F H=D-G I=Ix+H

No. Name Position Signature


1 Ass. Driller
2 Driller
1 S.T.P

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar
Trip Sheet
Date Time Rig No.
Trip Type Run In Hole (RIH)

Drill pipe size, in 5 DC size, in 8 ¼ ‘’


Drill pipe Displacement, bbl./ft. 0.00657 DC Displacement, bbl./ft. 0.058089
Drill pipe stand length ,ft. 94.5 DC stand length, ft. 94.5
Drill pipe stand displacement, bbl. 0.620865 DC stand/single displacement, bbl. 5.460366
HWDP size, in N/A DC size, in 6 ½’’
HWDP Displacement, bbl./ft. N/A DC Displacement, bbl./ft. 0.033014
HWDP stand/single length ,ft. N/A DC stand/single length, ft. 94.5
HWDP stand/single displacement, bbl. N/A DC stand/single displacement, bbl. 3.119823

No of Displacement Cumulative Trip Trip Tank Cumulative Difference between


Std. Cum. +
Stands Per Stand Theoretical Tank Level Trip Tank actual displace and
no Differ. Gain
Tripped Tripped Displacement Level Change Level Change theoretical displace
-
E
A B=A-Ax C=B*Met.Disp D=Dx+C F=E-Ex G=Gx+F H=G-D I=Ix+H Loss
0
1 1 5.460366 5.460366 3.5 3.5 3.5 -1.960366 -1.96036 Loss
2 1 5.460366 10.920732 10 6.5 10 -0.920732 -2.88109 Loss
3 1 5.460366 16.381098 18 8 18 1.618902 -1.26219 Gain
4 1 5.460366 21.841464 22 4 22 0.158536 -1.10366 Gain
5 1 5.460366 27.30183 27 5 27 -0.30183 -1.40549 Loss
6 1 5.460366 32.762196 32 5 32 -0.762196 -2.16768 Loss
12 6 18.8142 51.576396 53 21 53 1.423604 -0.74408 Gain
20 8 4.9664 56.542796 57 4 57 0.457204 -0.28687 Loss
25 5 3.104 59.646796 62 5 62 2.353204 2.066326 Gain
30 5 3.104 62.750796 63 1 63 0.249204 2.31553 Gain
35 5 3.104 65.854796 64 1 64 -1.854796 0.460734 Gain
40 5 3.104 68.958796 67 3 67 -1.958796 -1.49806 Loss
45 5 3.104 72.062796 74 7 74 1.937204 0.439142 Gain
50 5 3.104 75.166796 76 2 76 0.833204 1.272346 Gain
55 5 3.104 78.270796 80 4 80 1.729204 3.00155 Gain
60 5 3.104 81.374796 82 2 82 0.625204 3.626754 Gain
65 5 3.104 84.478796 83 1 83 -1.478796 2.147958 Gain
70 5 3.104 87.582796 86 3 86 -1.582796 0.565162 Gain
75 5 3.104 90.686796 87 1 87 -3.686796 -3.12163 Loss
80 5 3.104 93.790796 90 3 90 -3.790796 -6.91243 Loss

No. Name Position Signature


1 Ass. Driller
2 Driller
1 S.T.P

E.Abdullah Mahmoud YouTube: Petroleum Capsules


Email: PE.abdullah36@gmail.com FB: www.FB.com/abdullah.amar

You might also like