on
CHECKLIST FOR METAL / MODULAR SCAFFOLDING
42
‘Main Gontractor: ACE WoPks 9B
Project! SURG Cay
Site Rog. Now
‘Scaffolding Information:
cocato:.M622-83 “PE... one. wan ravingno: 1B! LF p6/ecet/olw
(Fetrto sit avout plan)
6.0m
High : Lift x Width .. Bay
Type nna _ rmodularframedtibe) Materialia. BED ance Mmelused eS
£5 /bn138/ 8%}
vapenton to ES | Gere oes
6] Ten Yes Ne rarer
T [FOUNDATION
a |Scatfolds erected on firm ground
'b |Scaffolds not endangered by open excavation
2 |SOLEPLATES
[Proper soloplates used
IBASEPLATES
JALIGNMENT OF SCAFFOLD COMPONENT
lstandard or frame vertical
[Ledger and transom levelled
»
ScarrOLD COMPONENT CONNECTOR.
Standard comected ented wh he 3
soo
» [Peo stated al vera ins baton oes won
6 [HORIZONTAL BRACING ORLACINS
a
a
a
IProper baseplates fited to all standard or leg of scaffolds | ~~
v
“
-
[At every 5 lift of frame or modular scaffold to bot!
}& outer
7 [TIE BACK
a {at every 2 lin or every tloor starting from the base
|Space not more than 3 bays or 7.6 meters apart
lwhichaver Is lesser
manner
8 FOOT - TIE
Foal - tes fitted to both inner and outer standards
‘9 WORKING PLATFORM
[Continuos working platform at construction level
solated viorking platforms are provided with proper
|auardrals and securely fastened in postion
40 [Berricade to open sides of building
v
a
¢ \epace no further than one bay from the end, ina stagered | 7
v
v
uw
Y
Scanned with CamScannerTem Yes | No Remarks
Scaffold erecled one Miuabove the top most construction | | |
level
412 | GUARDRAIL “
|Guardrall are fitted and connected to standard
19] TORSION CABLE (\t required by design)
\rensioned torsion cable at every eantlaver bracket N/A
14|DEBRIS NET
[Debris net to be erected to prevent partials and debris,
lcistadged from scaffold falling on to the public access
LADDER
|Ledder aro secured to the scaffold atthe top and bottom
TEMPORARY STRUCTURE
INo scaffold is connected to a temporary structure
PROFESSIONAL ENGINEER'S DRAWING
|Soaffold are erected strclly in accordance to the
[Professional Engineer's Drawing
SCAFFOLD COMPONENT
[Scaffold components and ftings showing no sign of
ldetertoration
[Al tings are tighton and undamaged
|All components and fittings are fixed, secured and placed
in position
HOUSEKEEPING
|Working platfrom, access ways and landing claerad ctf
lany obstruction, loose objects and tripping haz
| Scaffolding free from debris, unused formwork,
icomponent and etc.
ISIGNAGE
Suitable signage/tags are place at appropriate ionation
18
16
7
Nc a
NS
ony.
Tel & Fax No.
68000 Ampang, Selanaer| 5
“ei 09-92651861 Fax: 03 82001881"
Co! Project Manager
| Safety and Heath otter
Scanned with CamScanner