3.1 Problem Solving Tools
3.1 Problem Solving Tools
PLAN
• 5 Why’s ?????
CHECK
• 5W1H
• Brainstorming ?
• Force field analysis FOR AGAINST
• Idea Ranking
• Cause & effect diagrams (Fishbone) Man Method
• 8D 60
40
100 %
80
60
• FMEA
40
20
20
0
A B C D E F
Power surge End of life
d flf
Electricity board Faulty wiring
WHY Th operator
The t made
d a mistake
i t k
WHY e cchanged
We a ged the
e cu
cutting
g tools
oo s
Fi d th
Find the roott cause
Problem Solving Tools 5
The 5 “Why’s” (cont’d)
2 ‘Pen
2. Pen dots
dots’
– each person to allocate 10 dots across all ideas (maximum 5 dots per idea)
– count up scores for each idea
efit
Bene
idea on the matrix
• The better ideas are in the top
right
i ht off the
th matrix
ti
Low
High Effort Low
Concern:
Weight x rate
eight x rrate
Forces which prevent
Weighting
g
Weighting
g
Forces which help
achievement of
Rating
Rating
W
W
R
R
1 1
2 2
3 3
4 4
5 5
6 6
TOTAL 70
S O
Key Process
Process Step Potential Failure Mode Potential Failure Effects E Potential Causes C
Input
V C
er?
use
ur?
How Severe is tthe
What is the What is the Key In what ways does the Key What is the impact on the Key What causes the Key Input to
or FM occu
w often does cau
process step Process Input? Input go wrong? Output Variables (Customer go wrong?
Requirements) or internal
requirements?
How
Prepared by: Page ____ of ____
D R S O D R
Actions
Current Controls E P Resp. Actions Taken E C E P
Recommended
T N V C T N
cause or FM?
How well can you
What are the existing controls and What are the actions Whose What are the completed
procedures (inspection and test) for reducing the Responsible actions taken with the
that prevent either the cause or the occurrence of the for the recalculated RPN? Be
Failure Mode? Should include an Cause, or improving recommended sure to include
SOP number
number. detection? Should action? completion month/year
detect c