Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Ahg Gas Oxygen Backup System Project: Backup System Upgrade

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REV DESCRIPTION BY CHKD DATE

HAZOP IMPLEMENTED 17-04-19

SV 7305A VENDOR'S INFO. INCORPRATED FOR


DN??? HAZOP
VAPORIZER SYSTEM- VAP 703A PN 30
CAPACITY 5000 NM3/HR MODIFIFD FOR RECAP PUMPS
V 7305A

TRV 7302A CV 7304A 10 AHG GAS OXYGEN BACKUP SYSTEM


DN40
PN30 100 PROJECT : BACKUP SYSTEM UPGRADE

V 7306A
PEROJECT MANAGER: AHMED ALDESOKY

100
XV
V 7302A
7303A EXISTING SHEET-3
REVIEWED BY: FELIX
10 REV(14)
V 7301A DRAWN BY: ASHRAF NEW
TSLL
50 KV 7303A 7311
50X80 80-O-SS316L

100-O-SS316L
50
FAIL OPEN V 6805 PID V 6806
TO SHEET-1 15 3502 15
& SHEET-2 PI PI
3502 3502 TO NASCO

V 6812
V 6814

V 6813
40X100
PI TE TE TE PIC
U 703B-1 7307 7308 7309 7310 6801
V 6804

V 6801
800 NM3/HR

V 6809
V 6810
V 7309

25
25

04
10

04
100X150
80X40

V 6803150-O-08-AJ/ESOS40
CV 6811 CV 6801 V 6802
100-O-SS316L FI
SHEET 1 40X100 100 100
6801 100 100

100-O-SS316L
50-O-67-AJ/ESXX
U 703B-2
800 NM3/HR

80X40
80-O-SS316L

V 7306B
40X100
TRV 7302B

100
DN30 U 703B-3
PN40 800 NM3/HR
CV 7304B
XV 80X40
V 7302B 7303B V 7305B
100 FROM GOX
10 10 COMPRESSORS
V 7301B
40X100

100-O-SS316L
50 KV 7303B 50X80 U 703B-4 SV 7305B
50
FAIL OPEN
800 NM3/HR DN???
PN30
80X40

40X100

VAPORIZER SYSTEM- VAP 703B U 703B-5


CAPACITY 4800 NM3/HR 800 NM3/HR

80X40

40X100

U 703B-6
800 NM3/HR

80X40

You might also like