Build Beyond Imagination: Eik Engineering SDN BHD
Build Beyond Imagination: Eik Engineering SDN BHD
Build Beyond Imagination: Eik Engineering SDN BHD
YOUR
TRUSTED
EQUIPMENT AND
ATTACHMENTS
SPECIALIST
EIK®, a recognized name that specializes
in designing and building high performance
amphibious excavators and quality
attachments for various makes and models
of earth moving equipment. We gain
customers’ trust with our non compromising
attitude, using only high quality materials
and components, ensuring that a
consistently high level of workmanship
is achieved in every piece of attachment
produced. Our customers deserve
unparalleled investment performance ratio
for choosing our products.
“We Build
With Pride, You Use
With Trust.”
www.eikengineering.com 3
1.0 AMPHIBIOUS
EXCAVATOR
The high performance amphibious excavator is powered by our
patented ‘multi-synchronous hydraulic motor direct drive’ system, the
pivotal technology that positions us at the forefront of amphibious
excavator design. The paradigm shift in how modern amphibious
machines are being designed has won the hearts of numerous
customers, both new and experienced amphibious excavator users in
the industry.
in designing customized attachments to tackle unique challenges • Hydraulic extendable pontoon system offer the
where traditional off- the-shelf solutions fail to deliver. flexibility of narrow track width when fully retracted,
particularly useful during transportation.
www.eikengineering.com 5
AMPHIBIOUS
EXCAVATOR
[Metric]
Dim AM60 AM80 AM140 AM200 AM250 AM300 AM350 AM400 AM450
Description
(m)
For 3.5-4.5 For 7-8 For 12-14 For 20-23 For 24-27 For 28-30 For 33-38 For 39-43 For 44-48
ton class ton class ton class ton class ton class ton class ton class ton class ton class
excavator excavator excavator excavator excavator excavator excavator excavator excavator
A Max. Track Length 5.56 6.95 9.29 9.63 9.63 10.84 11.84 11.75 11.76
B Track Length On Ground 2.75 3.20 4.30 4.50 4.50 5.20 5.70 6.00 6.00
C Rear Upper Structure Length 0.85 1.75 2.13 2.85 3.00 3.19 3.50 3.50 3.56
D Overall Length 7.90 9.25 12.24 13.55 14.41 15.55 16.59 17.20 18.00
E Height of Boom 2.40 2.90 2.95 3.47 3.55 4.10 4.12 4.28 4.30
F Counterweight Clearance 1.52 1.73 1.84 2.17 2.20 2.35 2.35 2.40 2.40
H Undercarriage Width, min/max 2.75/3.45 3.36/4.16 3.94/5.04 4.47/5.95 5.17 / 6.61 5.91 / 6.91 5.97 / 6.97 5.97 / 6.97 6.40 / 7.40
I Track Gauge, min/max 1.75/2.45 2.06/2.86 2.49/3.59 2.85/4.33 3.25 / 4.69 3.99 / 4.99 4.02 / 5.02 4.02 / 5.02 4.25 / 5.25
J Track Cleat Width 1.00 1.30 1.45 1.62 1.92 1.92 1.95 1.95 2.15
K Min. Ground Clearance 1.01 1.15 1.12 1.30 1.30 1.29 1.13 1.16 1.10
L Track Height 1.46 1.65 1.69 2.03 2.03 2.03 2.03 2.19 2.19
M Overall Cab Height 3.46 3.65 3.77 4.08 4.12 4.27 4.30 4.30 4.36
N Upper Structure Overall Width 1.50 2.26 2.45 2.54 2.85 2.96 2.99 3.09 3.53
R Max. Cutting Height 6.50 7.95 11.40 12.40 13.70 14.60 15.30 15.20 16.30
S Max. Loading Height 5.20 6.30 9.30 10.50 11.40 12.10 12.80 12.70 13.80
T Recommended Outreach 7.00 8.00 12.00 14.00 15.00 16.00 17.00 18.00 20.00
U1 Max. Digging Depth from Front 3.70 3.80 7.30 8.90 9.40 9.90 11.00 12.50 13.90
U2 Max. Digging Depth from Side 3.50 3.40 6.50 7.20 7.20 8.50 9.60 10.40 11.30
Bucket Capacity (m 3) 0.13 0.25 0.40 0.50 0.70 0.80 0.90 1.10 1.10
* The above specifications are for reference only, actual working range may vary from machine models.
** For the benefit of continuous product improvement, specifications are subjected to change without prior notice.
Dim AM60 AM80 AM140 AM200 AM250 AM300 AM350 AM400 AM450
(ft & Description
in) For For 96,800
For 7,700 For 15,400 For 26,400 For 44,000 For 52,800 For 61,600 For 85,800
72,600- -105,600
- 9,900 lbs -17,600 lbs -30,800 lbs -50,600 lbs -59,400 lbs -66,000 lbs -94,600 lbs
83,600 lbs lbs
excavator excavator excavator excavator excavator excavator excavator
excavator excavator
A Max. Track Length 18’ 3” 22’ 10” 30’ 6” 31’ 7” 31’ 7” 35’ 7” 38’ 10” 38’ 7” 38' 7"
B Track Length On Ground 9’ 0” 10’ 6” 14’ 1” 14’ 9” 14’ 9” 17’ 1” 18’ 8” 19’ 8” 19' 8"
C Rear Upper Structure Length 2’ 9” 5’ 9” 7' 9’ 4" 9’ 10” 10’ 6” 11’ 6” 11' 6" 11' 8"
D Overall Length 25’ 11” 30’ 4” 40’ 2” 44’ 5” 47’ 3” 51’ 54’ 5” 56’ 5” 59' 1"
E Height of Boom 7’ 10” 9’ 6” 9’ 8” 11’ 5” 11’ 8" 13’ 5” 13’ 6” 14’ 1” 14' 1"
Overall Width, min/max 9’ 1” / 11’ 1” / 13’ 2” / 14’ 9” / 17’ 1” / 19’ 6” / 19’ 8” / 19’ 5” / 21' 1" /
G
(outwardly extendable) 11’ 5” 13’ 9” 16’ 10” 19’ 7” 21’ 9” 22’ 9” 23’ 23’” 24' 5"
M Overall Cab Height 11’ 4” 12' 12’ 4" 13’ 5” 13’ 6” 14’ 14’ 1” 14’ 1” 14' 4"
N Upper Structure Overall Width 4’ 11” 7’ 5” 8’ 8’ 4" 9’ 4” 9’ 9” 9’ 10” 10’ 2” 11' 7"
R Max. Cutting Height 21’ 4” 26’ 1” 37’ 5” 40’ 8” 44’ 11” 47’ 11” 50’ 2” 49’ 10” 53' 6"
S Max. Loading Height 17’ 1” 20’ 8” 30’ 6" 34’ 5” 37’ 5" 39’ 8” 42’ 41’ 8” 45' 3"
T Recommended Outreach 23’ 26’ 3” 39’ 4” 45’ 11” 49’ 3” 52’ 6” 55’ 9” 59’ 1” 65' 7"
U1 Max. Digging Depth from Front 12’ 2” 12' 6" 23’ 11” 29’ 2” 30’ 10” 32’ 6” 36’ 1” 41’ 45' 7"
U2 Max. Digging Depth from Side 11’ 6" 11' 2” 21’ 4” 23’ 7” 23' 7" 27’ 11” 31’ 6” 34’ 1” 37' 1"
Bucket Capacity (yd3) 0.17 0.33 0.52 0.65 0.92 1.05 1.18 1.44 1.44
* The above specifications are for reference only, actual working range may vary from machine models.
** For the benefit of continuous product improvement, specifications are subjected to change without prior notice.
www.eikengineering.com 7
2.0
LONG REACH
FRONT
With our expertise in designing and manufacturing
long reach booms, you can now maximize your ROI Applications
(Return on Investment) on your existing fleet of • Marine and river dredging either on land or on
excavators. Hundreds of customers have realized barge.
the value of long reach attachments where standard • Breakwater construction.
booms fail to get the necessary job done, saving • Basement and deep foundation excavation.
valuable cost and time, and maximizing their bottom • Construction of ditches, levees and pond
maintenance.
line. We supply long reach front packages for a wide
• Tailing dam maintenance in mining operation
range of excavator models, ranging from 10 - 250
metric tons (22,000 - 550,000 lbs) operating weight. Features
We invest heavily in the latest high-tech equipment • Use of high strength steel for increased
to stay abreast with the industry. Our facilities are reliability.
• Use of OEM grade bucket cylinder, easy
equipped with sophisticated robotic welding machine
access to spares globally.
and CNC line-bore machine. The boom and arm, being
• Robotically welded for superior workmanship
critical components of an excavator, require tight
and consistency.
tolerance and precision. They are processed with
these state-of-the-art machineries to ensure highest
attainable quality for every piece we produce.
Every time!
A 3-piece super long front undeniably triumph over a traditional 2-piece boom in terms of articulation and versatility. Its
advantages include increasing propotionally as the demand on the front end reach increases. The front attachment on a
3-piece long front can access areas where a 2-piece long front is unable to reach due to its limitations on articulation; in
short, a 2-piece long front has more ‘blind spots’. To access these ‘blind spots’, the machine has to be constantly moved
and repositioned, whereas a 3-piece boom configuration reduces or even eliminaties the need for frequent maneuvering of
the machine, therefore improves the productivity and increases fuel economy by a substantial margin.
Applications
• Ideal for river and sea dredging
applications on either land or barge.
• Construction of breakwater structures,
replacing typical practice where a
crane is used.
• Heavy demolition work where a cutter
or pulverizer can be attached.
Features
• Use of high strength steel for
increased reliability.
• The design is simulated extensively,
ensuring design integrity and to detect
potential stress and fatigue points.
• Reduces the need for frequent
maneuvering of the machine especially
for breakwater work.
www.eikengineering.com 9
Mining
EIK-designed Super Long Reach can be found working in unison with the environment
while safeguarding the natural surroundings
C
Each long reach package come
standard with the following items:
• 1x boom
D • 1x stick/dipper arm
• 1x bucket cylinder/ram
A
• Hydraulic lines for arm cylinder
• Hydraulic lines for bucket
cylinder
A B C D Approximate
Excavator Operating Length
Max. Reach Max. Depth Max. Height Boom Height Bucket Capacity
Weight
m ft m ft m ft m ft m ft m3 Yard3
6-8 ton
9.00 30’ 9.00 30’ 0” 4.65 15’ 3” 8.60 28’ 2” 2.20 7’ 2” 0.25 0.33
(13,200 - 17,600 lb)
11-14 ton
12.0 40’ 11.90 39’ 10” 7.90 25’ 11” 12.35 40’ 6” 2.30 7’ 6” 0.35 0.46
(24,200 - 30,800 lb)
15-17 ton
13.0 43’ 13.00 43’ 0” 9.10 29’ 10” 11.85 38’ 10” 2.45 8’ 0” 0.40 0.52
(33,000 - 37,400 lb)
14.0 46’ 14.00 46’ 0” 10.10 33’ 1” 13.00 42’ 7” 2.65 8’ 8” 0.50 0.65
18-22 ton
15.5 50’ 15.40 50’ 6” 11.15 36’ 7” 13.70 44’ 11” 2.65 8’ 8” 0.40 0.52
(39,600 - 48,400 lb)
16.5 54’ 16.50 54’ 0” 12.45 40’ 10” 17.70 58’ 0” 2.70 8’ 10” 0.40 0.52
23-26 ton 17.0 56’ 17.00 56’ 0” 12.80 41’ 11” 14.70 48’ 2” 2.80 9’ 2” 0.50 0.65
(50,600 - 57,200 lb) 18.5 60’ 18.25 59’ 10” 13.20 43’ 3” 16.45 53’ 11” 2.85 9’ 4” 0.40 0.52
27 - 32 ton
18.5 60’ 18.50 60’ 0” 14.00 45’ 11” 15.85 52’ 0” 3.05 10’ 00” 0.65 0.85
(59,400 - 70,400 lb)
33 -38 ton 18.5 60’ 18.50 60’ 0” 13.90 54’ 7” 16.15 52’ 11” 3.15 10’ 4” 0.70 0.91
(72,600 - 83,600 lb) 20.0 65’ 20.00 65’ 0” 15.30 50’ 2” 17.05 55’ 11” 3.40 11’ 1” 0.65 0.85
40 - 45 ton 21.0 69’ 21.00 69’ 0” 13.95 45’ 9” 15.40 50’ 6” 3.70 12’ 1” 0.80 1.04
(88,000 - 99,000 lb) 22.0 72’ 22.00 72’ 0” 15.80 51’ 10” 16.05 52’ 7” 3.95 12’ 11” 0.70 0.91
46 -55 ton 21.0 69’ 21.00 69’ 0” 15.80 51’ 10” 17.10 56’ 1” 3.55 11’ 7” 0.90 1.17
(101,200 - 121,000 lb) 22.0 72’ 22.00 72’ 0” 16.70 54’ 9” 17.65 57’ 10” 3.80 12’ 5” 0.80 1.04
60 - 68 ton
23.5 77’ 23.50 77’ 0” 17.00 55’ 9” 19.95 65’ 5” 3.95 12’ 11” 1.50 1.95
(132,000 - 149,600 lb)
70 - 78 ton 23.5 77’ 23.50 77’ 0” 16.95 55’ 7” 17.50 57’ 4” 4.00 13’ 1” 1.60 2.08
(154,000 - 171,600 lb) 25.0 82’ 25.00 82’ 0” 18.40 60’ 4” 18.35 60’ 2” 4.00 13’ 1” 1.50 1.95
80 - 95 ton 23.5 77’ 23.50 77’ 0” 17.35 56’ 11” 19.95 65’ 5” 4.25 13’ 11” 1.60 2.08
(176,000 - 209,000 lb) 25.00 82’ 25.00 82’ 0” 18.65 61’ 2” 20.95 68’ 8” 4.35 14’ 3” 1.50 1.95
100 - 125 ton 25.0 82’ 25.00 82’ 0” 17.60 57’ 8” 21.00 68’ 10” 5.35 17’ 6” 2.00 2.73
(220,000 - 275,000 lb) 27.0 88’ 27.00 88’ 0” 20.40 66’ 11” 18.80 61’ 8” 5.35 17’ 6” 1.80 2.34
* The above specifications are for reference only, actual working range may vary from machine models.
** For the benefit of continuous product improvement, specifications are subjected to change without prior notice.
*** Different bucket design will affect the working envelop.
www.eikengineering.com 11
3.0
HIGH REACH
DEMOLITION FRONT
An ultra high reach demolition boom is a purpose-built
attachment to elevate demolition tools for tearing down
multi-storey buildings. The beauty of the demolition boom
is its ease of positioning and flexibility in maneuvering
of tools in carrying out primary and secondary demolition
jobs safely. EIK attachments are engineered for performance,
reliability and low total cost of ownership in mind. As we
fully understand the harsh working conditions, hence only
quality steel is used in the fabrication. Demolition booms
for excavators greater than 120 metric tons (264,000 lbs)
will have a detachable and modular main boom with a quick
coupling joint for efficient mounting and dismantling, as well
as ease of ground handling and transportation.
Applications
• Demolishing high-rise buildings and
structures.
• Typically attached to a hydraulic breaker,
multi-processor or hydraulic shear.
Features
• Use of high strength steel for increased
reliability.
• Design is simulated extensively, ensuring
design integrity and detecting potential
stress and fatigue points.
• Hydraulic operated modular joint on
main boom, ease of detaching for
transportation.
• Cylinders installed with load hold safety
valves.
www.eikengineering.com 13
4.0 MATERIAL
HANDLING
Our goal in designing highly efficient material handling
solutions is to help our customers “Scale New Heights in
Productivity” in handling bulk materials. The machine is
designed from ground up, transforming from a standard
excavator into a piece of highly sophisticated equipment.
The most attractive proposition of an excavator-based
machine is its fully hydraulic control, which is undisputedly
more efficient, easier to operate and less costly to operate
and maintain than any traditional cranebased material
handling machine.
Applications
• High volume bulk material handling.
• Ideal for loading and unloading bulk cargo at
docks.
• Replaces cable operated material handling
machines.
Features
• Widened and lengthened crawler track for stability.
• Elevated structure with safety platform and hand
rail.
• Articulating operator cabin for excellent aerial
visibility.
• Long reach front for maximum accessibility.
Applications Features
• Demolition, rock handling, stacking, piling, general • Ease of assembly, works perfectly with or without
utilities. quick coupler.
• Ideal for applications that requires maximum • Reinforced box design.
clamping force. • 2-tine clamp over 3-tine frame structure.
• Handling of waste material for recycling industry. • Tines are braced with abrasion resistant steel
• Large surface area for maximum heaped capacity.
www.eikengineering.com 15
6.0
BUCKET
Mass production model of buckets are welded by the latest
robotic welding machine. We supply a full range of buckets
to suit excavators up to 200 metric tons (440,000 lbs)
operating weight. Buckets are designed differently, either in
the type of material used or the profile of the bucket to suit
different applications for the best possible productivity, fuel
economy and durability.
Rock Bucket
Features
• Heavy duty design for harsh working
environment.
• Light and durable for higher productivity and
fuel economy.
• Use of both high strength and abrasion
resistant steel for structural integrity and
durability.
Skeleton Bucket
The EIK Skeleton Bucket used for
Wide Ditching Bucket
sifting out rocks and digging in
soil, effectively mining and sorting The Wide Ditching Bucket is
rock, and removing other debris designed for cleaning ditches,
without the soil. All the parts of sloping, grading and other finish
the grille are individually welded work. Wide and shallow design
to a reinforcing plate to guarantee removes ditch sediment quickly.
the stability of the structure.
www.eikengineering.com 17
EIK PROVIDE SOLUTIONS FOR
YOUR BUSINESS
Mining
Basic planning for mining operations will include
where, when and what methods are to be used to
excavate the natural deposit will include the use of
reliable heavy machineries with robust attachments
under the harshest environment.
Marine Dredging
Marine dredging carries the responsibility of
cleaning and maintaining the natural waterways.
Super Long Front with attachments like orange
peel grab, buckets, will clear the bed of underwater
by scooping all waste in shallow waters which will
assist coastal protection, land reclamation and
coastal redevelopment.
Breakwater
The breakwater structure constructed for the
purpose of forming an artificial harbour with a
basin so protected from the effect of waves as is
to provide safe berthing for fishing vessels. The
equipment is required to carry out the construction
consists of a stable floating platform. EIK Super
Long Front helps to reach the demanding slope and
depth profile required
Winterland
Winter is associated with snow and freezing
temperatures. During this time, road maintenance,
winter constantly change and during winter, road
maintenance become most important and the
services involve a large number of operation. For
contractors, it is utmost important to choose high
quality and dependable attachments to maintain the
roadworks during wintertime. With the quality track
chain and track shoe, EIK AM series can work well
during winter conditions.
www.eikengineering.com 19
EIK ENGINEERING,
YOUR SOLUTION PROVIDER
www.eikengineering.com