Planned Job Observation Report: ELEMENT 5.20b

This planned job observation report summarizes an observation of worker Raju Das conducting soil investigation work. The observer, Mustafa, found that Raju was following safe work procedures and using proper tools and PPE, but noted poor housekeeping at the soil investigation area. Mustafa informed the responsible worker to improve housekeeping and recommended retraining Raju to address the inadequate motivation/behavior identified as a basic root cause.

Uploaded by

Shafie Zubier
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
225 views

Planned Job Observation Report: ELEMENT 5.20b

This planned job observation report summarizes an observation of worker Raju Das conducting soil investigation work. The observer, Mustafa, found that Raju was following safe work procedures and using proper tools and PPE, but noted poor housekeeping at the soil investigation area. Mustafa informed the responsible worker to improve housekeeping and recommended retraining Raju to address the inadequate motivation/behavior identified as a basic root cause.

Uploaded by

Shafie Zubier
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT NAME:CONSTRUCTION OF 380 KV DC OHTL IN

QIDDIYA AREA – 4400012358


ELEMENT 5.20b
PLANNED JOB OBSERVATION REPORT
JOB/TASK: 1 Contractor : AL-HAIDER COMPANY
DATE:24/03-2021 TIME:9:00 AM
NAME (Person Observing): MUSTAFA NAME (Person Observed): RAJU DAS
REASON FOR OBSERVATION
1 NEW WORKER 2 GOOD PERFORMER
3 POOR PERFORMER 4 WORKER WITH KNOWN ABILITY PROBLEM
5 RISK TAKER YES 6 ROUTINE OBSERVATION
7 ACCIDENT/ INCIDENT (INJURY) 8 INCIDENT (DAMAGE)
EVALUATION
EVALUATION YES/NO/NA COMMENTS
1 SAFE AND LOGICAL STEPS FOLLOWED YES
2 RISK ASSESSMENT AND JOB SAFE PROCEDURE YES
CONDUCTED / ATENDED
3 WORK PERMIT AND / OR LOTO APPLIED YES
4 USED CORRECT TOOLS YES
5 USED CORRECT P.P.E. YES

6 WORK PLACE SAFE YES


7 CONSIDERED OTHE OTHER WORKERS IN THE AREA YES
8 WORK ORDERLY AND CLEAN UP NO
9 HAZARDS RECOGNISED AND CORRECTED YES
COMMENTS AND FINDINDS
POOR HOUSEKEEPING OBSERVED AT SOIL INVESTIGATION AREA
INFORMED THE RESPONSIBLE WORKER TO MAINTAIN GOOD HOUSE KEEPING .

RECOMMENDATIONS
RECOMMENDATIONS YES/NO PERSON RESPONSIBLE SIGNATURE DATE
1 WRITE NEW JSP NO
2 MODIFY EXISTING JSP /PTW NO
3 MODIFY OR UPDATE RISK ASSESSMENT NO
4 REPAIR EQUIPMENT NO
5 REARRANGE EQUIPMENT / WORKPLACE NO
5 INTRODUCE NEW OR MODIFY OHS RULE NO
6 RETRAIN WORKER YES MUSTAFA
7 DO ERGONOMIC STUDY NO
8 OTHER: NO
REVIEWED WITH SITE MANAGER
SIGNATURE OBSERVER: SIGNATURE SITE MANAGER:

BASIC (ROOT) CAUSES ANALYSIS


INADEQUATE CAPABILITY INADEQUATE PURCHASING
LACK OF KNOWLEDGE (COMPETANCY) Y INADEQUATE MAINTENANCE
STRESS – PHYSICAL OR MENTAL INADEQUATE TOOLS AND OTHER EQUIPMENT
IMPROPER MOTIVATION / BEHAVIOUR Y INADEQUATE WORK STANDARDS
INADEQUATE SUPERVISION/LEADERSHIP ABUSE OR MISUSE
INADEQUATE ENGINERING/EQUIPMENT/SAFETY DEVICES INADEQUATE ERGONOMIC DESIGN
Note: These are deficiencies in your OHS Management System that needs to be corrected.

Page 1 of 1 Rev.2 [08April-2019] Projects Business Unit