Composite Works at Manglore For Hpclproject: Project No. W-488 Rev. 01 Page1 0f 2
Composite Works at Manglore For Hpclproject: Project No. W-488 Rev. 01 Page1 0f 2
Composite Works at Manglore For Hpclproject: Project No. W-488 Rev. 01 Page1 0f 2
HPCLPROJECT
Page 1 of 2
COMPOSITE WORKS AT MANGLORE FOR
HPCLPROJECT
4 Trenches Falling from height and cave' in Earth excavated to be stored 2 meters away from excavation site.
Earth excavated in "V" shape.
Vehicle to be kept in 2 meters from edge of excavation.
Experienced and trained workers.
Essential PPE in use.
Method Statement in place.
5 Environmental Extreme environmental Implement safety procedures & guidelines on heat stress.
conditions during condition such as high Inspect excavation and adjacent areas for possible hazardous atmosphere and
excavation works. temperature & humidity and any other condition that may present a hazard.
strong wind. Suspend / stop all operations during extreme temperature & humidity and high
wind of more than 25 knots.
Page 2 of 2