Composite Works at Manglore For Hpclproject: Project No. W-488 Rev. 01 Page1 0f 2

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

COMPOSITE WORKS AT MANGLORE FOR

HPCLPROJECT

Project No. W-488 Rev. 01 Page1 0f 2


JOB HAZARD ANALYSIS FOR EXCAVATION AND BACKFILLING

S.NO DESCRIPTION HAZARDS CONTROL MEASURES


1 Survey of the job Slip and trip  Implement housekeeping procedures.
site  Wearing of the required PPE’s particularly safety harness in deep excavated
area.
2 Excavation of earth  Slip and trip of workers.  Secure approved excavation work permit prior to the start of the work.
and trenching  Fall of workers and  Excavation plan and excavation work checklist must be available at the work
equipment’s. site.
 Cave-in of excavation  Assign licensed and experienced operators.
walls.  Excavation site must be cordoned with safety warning tapes and / or hard
barricades painted with red & white whichever is applicable including
provision of sufficient lightings & blinker lights during nighttime.
 Install adequate safety signs such as excavation in-progress, keep out - deep
excavation, etc.
 Assign experienced and trained personnel / workers.
 Provide spoil area away at least 2 meters from the edge of the excavation to
avoid cave-in or collapse in case excavated materials will not be hauled or
disposed at once.
 Provide sufficient shoring system, sloping of ground or other equivalent
means such as sheeting, crossing bracings, trench shield or box and jacks,
benching, underpinning, etc. whichever is applicable.
 Prohibit movement of vehicles and equipments near the edge of the
excavation that may result to side wall excavation cave-in or collapse due to
severe ground movement.
3 Backfilling works  Slip and trip of workers.  Implement method statement / procedures on safe backfilling works.
 Fall of workers and  Strict supervision during backfilling works.
tools / equipments.  Wearing of the required PPE’s.
 Assign licensed and experienced operators.
 Assign experienced and trained personnel / workers.

Page 1 of 2
COMPOSITE WORKS AT MANGLORE FOR
HPCLPROJECT

Project No. W-488 Rev. 01 Page2 0f 2


JOB HAZARD ANALYSIS FOR EXCAVATION AND BACKFILLING

4 Trenches Falling from height and cave' in  Earth excavated to be stored 2 meters away from excavation site.
 Earth excavated in "V" shape.
 Vehicle to be kept in 2 meters from edge of excavation.
 Experienced and trained workers.
 Essential PPE in use.
 Method Statement in place.
5 Environmental Extreme environmental  Implement safety procedures & guidelines on heat stress.
conditions during condition such as high  Inspect excavation and adjacent areas for possible hazardous atmosphere and
excavation works. temperature & humidity and any other condition that may present a hazard.
strong wind.  Suspend / stop all operations during extreme temperature & humidity and high
wind of more than 25 knots.

1 03-10-2021 Issued for review


PREPARED BY CHECKED BY APPROVED BY PROJ. MANAGER
REV. DATE DESCRIPTION
(Initials) (Initials) (Initials) (Initials)
DOCUMENT REVISIONS
Sections changed in last revision are identified by a line in the right margin

Page 2 of 2